H200 Appraisal

What H200 collateral is worth now, and when your loan matures.

What it's worth

A used 8-GPU HGX H200 node was valued at $348,500 in the October 2026 Rack Report, above the new volume price of about $340K. Our conservative band takes the H200 from 45-59% of list price in 2026 to 7-15% in 2029.

Our data

FigureValueDetail
Used HGX H200 8x141GB node$348,500$43,600 per GPU; limited sample. October 2026 Rack Report, data through August 2026.
New HGX H200 8-GPU node, volume orderAbout $340KIndicative new price, rounded. October 2026 Rack Report, data through August 2026.
H200: rental-implied value vs resale value1.68xRent of $4.67 per GPU-hour implies $586,246 per node; used nodes were valued at $348,500. October 2026 Rack Report, data through August 2026.
H200 residual, 202734-46%Conservative band, % of original list price; moderate 46-59%. Residual report, as of June 2026.
H200 residual, 20297-15%Conservative band, % of original list price; moderate 15-37%. Residual report, as of June 2026.

Sources: American Compute.

What moves H200 collateral value

Supply has propped up used prices. NVIDIA reportedly halted China-bound H200 production in March 2026, then said it was restarting two weeks later; Cisco ended sale of its HGX H200 server in June 2026, and new lead times ran past 40 weeks by September. Used above new is a supply signal, not a floor: it lasts as long as new supply is short.

Rents overstate it. Capitalizing H200 rents gives a node value 1.68x the resale value of a used node. A valuation built on a rental DCF would lend against a price no buyer has paid.

The 2029 cliff. The H200 conservative band falls from 24-35% of list price in 2028 to 7-15% in 2029. A 36-month loan signed in 2026 matures right at it.

It is a Hopper: air-cooled at about 10.2 kW per DGX system, one of the last widely deployed GPUs that older data centers can still run. That keeps its buyer pool wide today. Once more liquid-cooled capacity is built, our report expects Hopper residuals to fall faster.

An H200 bought new in 2026 is already more than two years into its technology life, because the generation first shipped in 2024. Its 141 GB of HBM3E, which Micron announced it was supplying for the H200 in February 2024, is what inference buyers pay for.

What a report flags

SeverityFinding
HighCollateral value relies on used nodes trading above new; the 2028 orderly liquidation value uses the conservative band instead.
MediumBorrower's model capitalizes current rental rates; the rental-implied node value is well above realized sales.
LowPurchase terms state that the OEM warranty is assignable to a later buyer; service records cover every node.

Illustrative.

Where GPU Deals Break

The 52-slide deck: where GPU loans and leases break, from the order to the site to the lease, one diagram per risk.

Book a call

Send us the equipment list and the loan or lease you have in mind. We will come back with a proposed scope and the questions we would need answered.