State of the Neoclouds 2026
As of October 2026, 536 companies sell GPU capacity outside the hyperscalers, in 45 home countries. 74% were built to rent GPUs; the rest are telcos, national supercomputing centers, bitcoin miners and power developers that added them. Half are American, and 53% of the GPU-native operators employ 50 people or fewer.
The money sits at the top. Ten operators hold 87% of disclosed funding, and investment-grade GPU debt has reached only the largest. The numbers below come from our Neocloud Directory and public filings.
Who sells GPU capacity
399 operators are GPU-native. They are neoclouds, GPU cloud and bare-metal hosts, serverless inference platforms, marketplaces and VC-backed clusters. A neocloud lives on the spread between its GPU-hour price and the cost of owning the GPU.
The other 137 added GPUs to a business they already had: a telco network, a national supercomputer, a bitcoin mine, a power plant or a colocation hall. For a lender, the label decides whose cash is at stake. A telco or a miner has other revenue, other creditors and other collateral competing for the same dollars.
- GPU cloud and bare-metal operators231
- Neoclouds147
- Sovereign AI clouds64
- AI factories (national HPC)27
- Bitcoin miners pivoting to AI25
- Serverless inference platforms12
- Energy-backed AI campuses12
- Colocation with GPU capacity9
- Compute platforms and marketplaces6
- VC-backed clusters3
Where neoclouds are based
226 operators are American. That is 51% of the 439 with a known home market. No other country has more than 20.
Europe is second and fragmented. Its 100 operators are spread across 23 countries, none with more than 18. In Asia-Pacific, 29 of 79 operators are sovereign clouds; in North America, 6 of 246 are. The Middle East and Africa hold 15.
- United States226
- Canada20
- India19
- United Kingdom18
- France12
- Germany11
- Netherlands10
- China9
- Japan8
- Singapore8
- South Korea8
- Switzerland8
- United Arab Emirates8
- Australia6
- Italy6
| Region | Operators | Share | Countries |
|---|---|---|---|
| North America | 246 | 56% | 2 |
| Europe | 100 | 23% | 23 |
| Asia-Pacific | 79 | 18% | 14 |
| Middle East & Africa | 15 | 3% | 5 |
| Latin America | 1 | Under 1% | 1 |
Home market understates reach. 107 operators list capacity or offices in two or more countries, and 36 in five or more.
How old neoclouds are
Half the GPU-native operators predate the AI boom. 114 of the 229 GPU-native operators with a known founding year started before 2017. Most began as web hosts and dedicated-server providers, then added GPU racks. Their operating history is longer than their GPU history, and a decade of hosting receivables tells a lender more than one year of GPU revenue.
The new wave is real but small. 65 operators were founded in 2022 or later, 22% of the 297 we can date. 47 of the 64 with a known size employ 50 people or fewer. The 2017-2021 cohort (73 operators) carries the crypto cycle: 15 have bitcoin-mining roots.
How big neoclouds are
53% of GPU-native operators employ 50 people or fewer. That is 139 of the 260 with a known headcount. Only 27 employ more than 500.
The large end is mostly incumbents. 41% of operators that added GPUs to another business employ more than 500, against 10% of GPU-native ones. For a lender, a 20-person borrower makes key-person risk and a backup operator part of the credit file.
- 1-10 employees38
- 11-50 employees128
- 51-200 employees86
- 201-500 employees39
- 501-1,000 employees15
- 1,001-5,000 employees20
- 5,001+ employees32
The mix differs by type. 65% of bare-metal hosts employ 50 or fewer, against 44% of neoclouds and 15% of sovereign clouds.
| Type | With size | 50 or fewer | 51-500 | Over 500 |
|---|---|---|---|---|
| GPU cloud and bare-metal operators | 124 | 65% | 31% | 5% |
| Neoclouds | 123 | 44% | 40% | 16% |
| Sovereign AI clouds | 48 | 15% | 17% | 69% |
| AI factories (national HPC) | 18 | 22% | 61% | 17% |
| Bitcoin miners pivoting to AI | 16 | 31% | 56% | 13% |
| Serverless inference platforms | 8 | 38% | 50% | 13% |
| Energy-backed AI campuses | 9 | 67% | 11% | 22% |
| Colocation with GPU capacity | 7 | 71% | 29% | 0% |
Who funds and owns them
Ten operators hold 87% of disclosed funding. 63 of 536 operators disclose an equity total, $16.0B combined. The median raise is $26M, and 47 of the 63 raised less than $100M.
- Under $10M7
- $10M-49M29
- $50M-99M11
- $100M-499M8
- $500M-999M3
- $1B+5
Ownership is known for 179 operators. 72 are venture-backed or privately held, 54 belong to a larger group, 42 are listed and 11 are bootstrapped. The listed ones file their debt in public; the public neoclouds list tracks them.
- Venture or privately funded 72
- Subsidiary or affiliate 54
- Publicly listed 42
- Bootstrapped 11
How neoclouds borrow
Rated GPU debt arrived in 2026. CoreWeave closed a delayed-draw term loan of up to $8.5B in March, rated A3 by Moody's, with its floating tranche at SOFR + 2.25%. [1]CoreWeave, "CoreWeave Closes Landmark $8.5 Billion Financing Facility, Achieving First Investment-Grade Rated GPU-backed Financing" (March 31, 2026)https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-Landmark-8-5-Billion-Financing-Facility-Achieving-First-Investment-Grade-Rated-GPU-backed-Financing/default.aspx Lambda closed a $1.0B fixed-rate loan at 6.78% in October, rated Baa1 and backed by two investment-grade offtakers, the customers contracted to buy the compute. [2]Lambda, "Lambda closes $1 billion senior secured fixed rate financing" (October 1, 2026)https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-fixed-rate-financing
The long tail has neither the contracts nor the scale. Small GPU loans reach the bond market only inside lenders' mixed equipment pools. GPU loans are about 15% of the collateral in Stonebriar's roughly $869M equipment asset-backed securities (ABS) deal, and about 20% of Wingspire's deal of more than $407M. [3]Bloomberg via The Star, "GPU financing filters into ABS with Stonebriar, Wingspire deals" (October 7, 2026)https://www.thestar.com.my/business/business-news/2026/10/07/gpu-financing-filters-into-abs-with-stonebriar-wingspire-deals How those structures work is in private credit and ABS for GPU financing.
The middle is the gap. Between the two sit 174 GPU-native operators with 11 to 200 employees, and most of the 40 operators that disclosed raising $10M to $99M. They are too small for a rated loan or a bond, and no public benchmark prices their debt.
| Rung | Who uses it | Public evidence |
|---|---|---|
| Rated GPU-backed term loans | The largest neoclouds, with investment-grade offtakers | CoreWeave up to $8.5B, A3 (Mar 2026); Lambda $1.0B, Baa1 (Oct 2026) |
| High-yield secured notes | Listed miners and neoclouds | TeraWulf $3.2B at 7.75%; Applied Digital $6.1B in three issues |
| Bank project loans | Campus builds with a signed tenant | Galaxy $1.4B from Deutsche Bank (Aug 2025) |
| Structured GPU loans against an offtake | Operators with $5M to $100M clusters | Priced deal by deal; no public benchmark |
| Bank loans, equipment leases, vendor financing | The long tail: it borrows from banks, equipment lessors and vendors | Bilateral deals, rarely disclosed |
Public neocloud and GPU debt deals, 2025-2026
Listed operators disclose their financings, so the top of the ladder is visible. Every deal below is from a company release or SEC filing. More deals are in the GPU Financing Tracker.
| Borrower | Date | Amount | Instrument | Terms |
|---|---|---|---|---|
| Galaxy (Helios campus) [4]Galaxy Digital, Form 8-K: credit agreement for Galaxy Helios I with Deutsche Bank (August 15, 2025)https://www.sec.gov/Archives/edgar/data/1859392/000185939225000039/glxy-20250815.htm | Aug 2025 | $1.4B | Senior secured term loan from Deutsche Bank | SOFR (2.50% floor) + 4.75%; up to 80% loan-to-cost; matures Aug 2028 |
| TeraWulf [5]TeraWulf, "TeraWulf Inc. Announces Pricing of $3.2 Billion of Senior Secured Notes" (October 16, 2025)https://investors.terawulf.com/news-events/press-releases/detail/119/terawulf-inc-announces-pricing-of-3-2-billion-of-senior/ | Oct 2025 | $3.2B | Senior secured notes | 7.75% due 2030; secured in part by a Fluidstack lockbox account |
| Cipher Mining [6]Cipher Mining, Form 8-K Exhibit 99.1: pricing of $1.4 billion of senior secured notes (November 5, 2025)https://www.sec.gov/Archives/edgar/data/1819989/000095010325014401/dp237015_ex9901.htm | Nov 2025 | $1.4B | Senior secured notes | 7.125% due 2030; funds the Barber Lake site |
| Applied Digital [7]Applied Digital, Form 8-K Exhibit 99.1: pricing of $2.35 billion of senior secured notes (November 13, 2025)https://www.sec.gov/Archives/edgar/data/1144879/000149315225022506/ex99-1.htm [8]Applied Digital, "Applied Digital Announces Pricing of $2.15 Billion of Senior Secured Notes to fund Polaris Forge 2 Campus" (March 4, 2026)https://ir.applieddigital.com/news-events/press-releases/detail/146/ [9]Applied Digital, "Applied Digital Announces Pricing of $1.59 Billion of Senior Secured Notes to fund the Fourth Building at Polaris Forge 1" (June 9, 2026)https://ir.applieddigital.com/news-events/press-releases/detail/156 | Nov 2025 to Jun 2026 | $6.1B | Senior secured notes, three issues | $2.35B at 9.25%, $2.15B at 6.75%, $1.59B at 7.00% |
| CoreWeave [1]CoreWeave, "CoreWeave Closes Landmark $8.5 Billion Financing Facility, Achieving First Investment-Grade Rated GPU-backed Financing" (March 31, 2026)https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-Landmark-8-5-Billion-Financing-Facility-Achieving-First-Investment-Grade-Rated-GPU-backed-Financing/default.aspx | Mar 2026 | Up to $8.5B | Delayed-draw term loan | Rated A3 (Moody's); floating tranche SOFR + 2.25%; matures 2032 |
| CoreWeave [10]CoreWeave, "CoreWeave Closes $3.1 Billion Loan Facility, Expanding Access to Public Markets for GPU-Backed Financing" (May 18, 2026)https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-3-1-Billion-Loan-Facility-Expanding-Access-to-Public-Markets-for-GPU-Backed-Financing/default.aspx | May 2026 | $3.1B | Delayed-draw term loan | Rated Ba2 (Moody's); SOFR + 4.50% |
| Nebius [11]Nebius, "Nebius raises $775 million in first secured debt financing to accelerate global buildout" (July 17, 2026)https://nebius.com/newsroom/nebius-raises-775-million-in-first-secured-debt-financing-to-accelerate-global-buildout | Jul 2026 | $775M | Senior secured GPU-backed facility | SOFR + 2.50%; matures Oct 2030; backed by an investment-grade customer contract |
Sovereign clouds and AI factories
91 operators sell sovereign or national AI capacity. The directory counts 64 sovereign AI clouds and 27 national AI factories in 37 countries. NVIDIA said its sovereign AI business more than tripled in fiscal 2026, to over $30 billion. [12]NVIDIA, Q4 fiscal 2026 earnings call transcript (February 25, 2026)https://s201.q4cdn.com/141608511/files/doc_financials/2026/q4/NVDA-Q4-2026-Earnings-Call-25-February-2026-5_00-PM-ET.pdf
Europe builds factories; Asia builds clouds. Europe hosts 25 of the 27 AI factories, mostly national supercomputing centers funded through EuroHPC, which had selected 19 AI Factories by March 2026. [13]EuroHPC Joint Undertaking, "AI Factories / AI Gigafactories" presentation (March 2026)https://eu-space.europa.eu/sites/default/files/2026-06/03_Pelegrin_AIF%20-%20AIGF%202026.pdf Its call for up to seven AI Gigafactories is open until December 3, 2026. [14]EuroHPC Joint Undertaking, call for the selection of AI Gigafactory consortia, EUROHPC-2026-CEI-AIGF-01 (published July 30, 2026)https://eurohpc-ju.europa.eu/call-tenders-selection-artificial-intelligence-gigafactory-consortia-and-establishment-ai_en Asia-Pacific hosts 29 of the 64 sovereign clouds, led by national telcos and internet groups. South Korea announced more than 260,000 NVIDIA GPUs across government and industry in October 2025. [15]NVIDIA, "NVIDIA, South Korea Government and Industrial Giants Build AI Infrastructure and Ecosystem" (October 31, 2025)https://investor.nvidia.com/news/press-release-details/2025/NVIDIA-South-Korea-Government-and-Industrial-Giants-Build-AI-Infrastructure-and-Ecosystem-to-Fuel-Korea-Innovation-Industries-and-Jobs/ India's AI Mission has onboarded more than 38,000 GPUs for shared use. [16]Government of India, Digital India, "IndiaAI Mission expands AI ecosystem with affordable compute and startup support" (2026)https://www.digitalindia.gov.in/press_release/indiaai-mission-expands-ai-ecosystem-with-affordable-compute-and-startup-support/
- North America7
- Europe38
- Asia-Pacific30
- Middle East & Africa7
- Latin America1
These are big organizations. 25 of the 48 sovereign clouds with a known size employ more than 1,000 people. Their GPUs sit on telco and state balance sheets that rarely need GPU-backed debt, and their capacity is allocated by policy: research access, national champions and public-sector tenants come first.
Bitcoin miners turned AI landlords
34 operators have bitcoin-mining roots. 25 are miners pivoting to AI, and 9 are neoclouds that started in mining, such as IREN, TeraWulf, Applied Digital and Crusoe. 22 are in North America.
The halving pushed them. Hashprice, a miner's daily revenue per unit of computing power, fell to a record $49.44 per petahash per day after the April 2024 halving. [17]Luxor Hashrate Index, weekly roundup (April 29, 2024)https://hashrateindex.com/blog/hashrate-index-roundup-april-29-2024/ It hit a new low of $27.74 on June 6, 2026. [18]Luxor Hashrate Index, "Luxor Hashrate Lookback Series: June 2026" (July 10, 2026)https://hashrateindex.com/blog/luxor-hashrate-lookback-series-june-2026/ Miners own what AI tenants lack: energized sites and signed power contracts.
The contracts are long and large: about $153B across 24 disclosed deals. Most are data center leases of 10 to 20 years to AI labs, hyperscalers and neoclouds, and several carry a Google backstop on the tenant's payments. [19]American Compute, Bitcoin miners pivoting to AI: disclosed AI contracts, each linked to its filing or press report (October 2026)https://www.amcompute.com/bitcoin-miners-ai Every miner and deal is on our bitcoin miners AI map.
| Miner | Counterparty | Signed | Value | Contract |
|---|---|---|---|---|
| TeraWulf | Anthropic | Jul 2026 | $19B | 20-year lease, about 401 MW critical IT, Hawesville KY; up to $33B with extensions |
| Applied Digital | CoreWeave | 2025 | $11B | Leases covering all 400 MW at Polaris Forge 1 |
| Core Scientific | CoreWeave | 2024 to 2025 | $10.2B | 12-year colocation, about 590 MW of HPC infrastructure |
| Hut 8 | Investment-grade tenant (unnamed) | Jul 2026 | $9.8B | Beacon Point phase 2, 15-year lease; doubles tenant to 704 MW |
| Hut 8 | Investment-grade tenant (unnamed) | May 2026 | $9.8B | Beacon Point phase 1, 15-year lease, 352 MW |
| IREN | Microsoft | Nov 2025 | $9.7B | 5-year AI cloud contract, NVIDIA GB300 GPUs at Childress |
| TeraWulf | Fluidstack (Google backstop) | Oct 2025 | $9.5B | Abernathy, Texas JV campus, 168 MW critical IT lease |
| Riot Platforms | Frontier AI lab (unnamed) | Aug 2026 | $9.1B | 20-year lease, 191 MW critical IT at Rockdale; up to $16.1B with extensions |
GPU rents and resale prices
New-GPU rents ran hot in September. Ornn's B200 index, an average of transacted rental prices, rose from $6.89 per GPU-hour on Sep 10 to a three-month high of $8.14 on Sep 29, then eased to $7.46 by Oct 9, 8% off the peak. [20]Ornn, Compute Price Index OCPI-B200 daily settles, with the H100 and H200 indexes (read October 9, 2026)https://data.ornn.com/markets/b200 The same index was $2.31 in early March. [21]Tomasz Tunguz, "GPU Spot Prices Surge 114% in Six Weeks," citing the Ornn index (April 27, 2026)https://tomtunguz.com/b200-gpu-pricing-spot-market-model-releases/
Used GPUs moved the other way. The GPU index in our Rack Report, which tracks resale prices of used data center GPUs (first half of 2025 = 100), was 75 in August: down 12.3% on the month and 22.1% on the year. Used H200 nodes listed at $348,500, above the roughly $340,000 volume price of a new one. [22]American Compute, Rack Report, October 2026 issue (data through August 2026)https://www.amcompute.com/rack-report
Rents decide whether a small operator covers its debt service. Resale decides what its lender recovers if it does not. How fast GPUs lose value is in our GPU residual value report.
| Indicator | Level | Context |
|---|---|---|
| B200 rental index [20]Ornn, Compute Price Index OCPI-B200 daily settles, with the H100 and H200 indexes (read October 9, 2026)https://data.ornn.com/markets/b200 | $7.46 per GPU-hour | Oct 9, 2026; 8% below the Sep 29 high |
| H100 and H200 rental indexes [20]Ornn, Compute Price Index OCPI-B200 daily settles, with the H100 and H200 indexes (read October 9, 2026)https://data.ornn.com/markets/b200 | $2.79 and $5.70 per GPU-hour | Oct 9, 2026 |
| Used GPU resale index [22]American Compute, Rack Report, October 2026 issue (data through August 2026)https://www.amcompute.com/rack-report | 75 | Down 22.1% year over year, August 2026 |
| Neocloud revenue, 2025 [23]Synergy Research Group, "Neocloud Market Forecast to Approach $400B by 2031" (April 2, 2026)https://srgresearch.com/articles/neocloud-market-forecast-to-approach-400b-by-2031-driven-by-surging-ai-infrastructure-demand | More than $25B | About $9B in Q4 2025, up 223% year over year |
| CoreWeave revenue backlog [24]CoreWeave, second quarter 2026 results (August 11, 2026)https://investors.coreweave.com/news/news-details/2026/CoreWeave-Reports-Strong-Second-Quarter-2026-Results/default.aspx [25]CoreWeave, second quarter 2025 results (August 12, 2025)https://investors.coreweave.com/news/news-details/2025/CoreWeave-Reports-Strong-Second-Quarter-2025-Results/default.aspx | About $104B | June 30, 2026, up from $30.1B a year earlier |
How we counted
- Coverage. The Neocloud Directory lists companies that own or operate GPUs and sell the capacity: GPU clouds, bare-metal hosts, AI factories, miners hosting AI and energy-backed campuses. Hyperscalers, colocation-only data centers, resellers and end users are left out. It is not a census; small private operators are the likeliest to be missing. Our October 2026 survey found no public GPU offering for 66 of the 536, mostly web and VPS hosts; they stay in the counts.
- Types. Each operator has one type, assigned by our team. GPU-native means neoclouds, GPU cloud and bare-metal operators, serverless platforms, marketplaces and VC-backed clusters. Mining roots come from public company histories.
- Self-reported fields. Headquarters, founding year and headcount band come from company websites and LinkedIn. Coverage: home market 439 of 536, founding year 297, headcount 358, ownership 179, funding 63.
- Funding. Equity raised as disclosed by the company or reported in the press, with ranges taken at the midpoint. Treat the distribution as indicative.
- Dates. Directory rows were updated between June and October 2026. Public prices and deals carry their own dates.
The full directory of all 536 operators, with contacts, is a paid product: the Neocloud Directory. Profiles of the largest operators are free on our company pages.
References
- CoreWeave, "CoreWeave Closes Landmark $8.5 Billion Financing Facility, Achieving First Investment-Grade Rated GPU-backed Financing" (March 31, 2026)
- Lambda, "Lambda closes $1 billion senior secured fixed rate financing" (October 1, 2026)
- Bloomberg via The Star, "GPU financing filters into ABS with Stonebriar, Wingspire deals" (October 7, 2026)
- Galaxy Digital, Form 8-K: credit agreement for Galaxy Helios I with Deutsche Bank (August 15, 2025)
- TeraWulf, "TeraWulf Inc. Announces Pricing of $3.2 Billion of Senior Secured Notes" (October 16, 2025)
- Cipher Mining, Form 8-K Exhibit 99.1: pricing of $1.4 billion of senior secured notes (November 5, 2025)
- Applied Digital, Form 8-K Exhibit 99.1: pricing of $2.35 billion of senior secured notes (November 13, 2025)
- Applied Digital, "Applied Digital Announces Pricing of $2.15 Billion of Senior Secured Notes to fund Polaris Forge 2 Campus" (March 4, 2026)
- Applied Digital, "Applied Digital Announces Pricing of $1.59 Billion of Senior Secured Notes to fund the Fourth Building at Polaris Forge 1" (June 9, 2026)
- CoreWeave, "CoreWeave Closes $3.1 Billion Loan Facility, Expanding Access to Public Markets for GPU-Backed Financing" (May 18, 2026)
- Nebius, "Nebius raises $775 million in first secured debt financing to accelerate global buildout" (July 17, 2026)
- NVIDIA, Q4 fiscal 2026 earnings call transcript (February 25, 2026)
- EuroHPC Joint Undertaking, "AI Factories / AI Gigafactories" presentation (March 2026)
- EuroHPC Joint Undertaking, call for the selection of AI Gigafactory consortia, EUROHPC-2026-CEI-AIGF-01 (published July 30, 2026)
- NVIDIA, "NVIDIA, South Korea Government and Industrial Giants Build AI Infrastructure and Ecosystem" (October 31, 2025)
- Government of India, Digital India, "IndiaAI Mission expands AI ecosystem with affordable compute and startup support" (2026)
- Luxor Hashrate Index, weekly roundup (April 29, 2024)
- Luxor Hashrate Index, "Luxor Hashrate Lookback Series: June 2026" (July 10, 2026)
- American Compute, Bitcoin miners pivoting to AI: disclosed AI contracts, each linked to its filing or press report (October 2026)
- Ornn, Compute Price Index OCPI-B200 daily settles, with the H100 and H200 indexes (read October 9, 2026)
- Tomasz Tunguz, "GPU Spot Prices Surge 114% in Six Weeks," citing the Ornn index (April 27, 2026)
- American Compute, Rack Report, October 2026 issue (data through August 2026)
- Synergy Research Group, "Neocloud Market Forecast to Approach $400B by 2031" (April 2, 2026)
- CoreWeave, second quarter 2026 results (August 11, 2026)
- CoreWeave, second quarter 2025 results (August 12, 2025)
Frequently Asked Questions
How many neoclouds are there?
Our Neocloud Directory counts 536 GPU cloud operators as of October 2026, in 45 home countries. 147 are neoclouds in the narrow sense. The rest are GPU cloud and bare-metal hosts, sovereign AI clouds, national AI factories, bitcoin miners pivoting to AI, energy-backed campuses, serverless inference platforms and colocation firms with GPU capacity. Hyperscalers are excluded.
What is a neocloud?
A neocloud is a cloud provider built to rent GPUs for AI training and inference, unlike a hyperscaler such as AWS, Azure or Google Cloud that sells a broad catalog of services. CoreWeave, Lambda, Nebius and Crusoe are the best-known examples.
Where are most neoclouds based?
In the United States: 226 of the 439 operators with a known home market (51%). Canada (20), India (19), the UK (18), France (12) and Germany (11) follow.
How do neoclouds finance their GPUs?
The largest borrow through GPU-backed term loans tied to customer contracts, some rated investment grade, and high-yield secured notes: CoreWeave's loan of up to $8.5 billion was rated A3 by Moody's in March 2026. Small operators rely on equity, bank loans, equipment leases and vendor financing. Structured GPU loans against a signed offtake contract fill the gap between the two.