B200 vs H200
For a 6-38% higher node price, the B200 brings 2.3x the FP8 and holds value better.
The difference
Buy the B200. A new HGX B200 node listed at $360,000 to $470,000 in October 2026 against about $340,000 for a new HGX H200 node, a 6-38% premium. For it you get 2.3 times the dense FP8, FP4, 180 GB instead of 141 GB and 8 TB/s instead of 4.8. The H200 still wins in air-cooled 10 kW sites.
Side by side
| Per GPU | H200 | B200 | B200 / H200 |
|---|---|---|---|
| Architecture, released | Hopper, Mid 2024 | Blackwell, Early 2025 | |
| Memory | 141 GB HBM3e | 180 GB (1.4 TB per 8-GPU board) | 1.28x |
| Memory bandwidth | 4.8 TB/s | 8 TB/s | 1.67x |
| BF16, dense TFLOPS | 989 | 2,250 | 2.28x |
| FP8, dense TFLOPS | 1,979 | 4,500 | 2.27x |
| FP4, dense TFLOPS | Not supported | 9,000 | |
| FP64 (Tensor / matrix), TFLOPS | 67 | 37 | 0.55x |
| Max power per GPU | 700 W | 1,000 W air-cooled, 1,200 W liquid | 1.43x |
| Power per 8 GPUs | About 10 kW | About 14 kW | 1.40x |
| GPU-to-GPU link | NVLink 4, 900 GB/s per GPU | NVLink 5, 1.8 TB/s per GPU | |
| Scale-up domain | 8 GPUs (HGX board) | 8 GPUs (HGX board) | |
| Form factor, cooling | SXM5 module, 8-GPU HGX board; air | SXM module, 8-GPU HGX board; air or liquid | |
| Price per GPU, October 2026 | $43,600 (Used 8-GPU node, per GPU) | $45,000-$58,750 (New 8-GPU node, per GPU) | |
| Launch price reported in the press | Up to $40,000 per GPU, HSBC (2024) | $30,000 to $40,000 per unit, per NVIDIA’s CEO (2024) | |
| Residual band, 2027 (conservative) | 34-46% of original price | 40-54% of original price |
Tensor Core figures are dense. Prices as of October 2026.
Sources: American Compute, NVIDIA, Managed GPUs (American Compute), Tom's Hardware, CNBC.
The H200 is at the end of its run
Used H200s cost close to a new B200. New H200 lead times ran past 40 weeks in September 2026. In October, used H200 nodes at $348,500 sat above the new volume price and just under the $360,000 entry price of a new B200 node. Cisco’s HGX H200 server reached its last order date on June 25, 2026.
The B200 keeps more of its value
It also keeps more of its value. Our conservative band puts the B200 at 16-26% of original price in 2029 against 7-15% for the H200, because the H200 generation shipped about a year earlier.
Sources: American Compute, NVIDIA, Cisco.
Residual value and appraisals
| Year | H200 | B200 |
|---|---|---|
| 2026 | 45-59% | 59-67% |
| 2027 | 34-46% | 40-54% |
| 2028 | 24-35% | 30-42% |
| 2029 | 7-15% | 16-26% |
| 2030 | 4-6% | 6-11% |
What a used unit is expected to fetch, as a share of its original price: the conservative band from our residual value report.
H200 appraisal · H200 residual value · B200 appraisal · B200 residual value