B200 vs H200

For a 6-38% higher node price, the B200 brings 2.3x the FP8 and holds value better.

The difference

Buy the B200. A new HGX B200 node listed at $360,000 to $470,000 in October 2026 against about $340,000 for a new HGX H200 node, a 6-38% premium. For it you get 2.3 times the dense FP8, FP4, 180 GB instead of 141 GB and 8 TB/s instead of 4.8. The H200 still wins in air-cooled 10 kW sites.

Side by side

Per GPUH200B200B200 / H200
Architecture, releasedHopper, Mid 2024Blackwell, Early 2025
Memory141 GB HBM3e180 GB (1.4 TB per 8-GPU board)1.28x
Memory bandwidth4.8 TB/s8 TB/s1.67x
BF16, dense TFLOPS9892,2502.28x
FP8, dense TFLOPS1,9794,5002.27x
FP4, dense TFLOPSNot supported9,000
FP64 (Tensor / matrix), TFLOPS67370.55x
Max power per GPU700 W1,000 W air-cooled, 1,200 W liquid1.43x
Power per 8 GPUsAbout 10 kWAbout 14 kW1.40x
GPU-to-GPU linkNVLink 4, 900 GB/s per GPUNVLink 5, 1.8 TB/s per GPU
Scale-up domain8 GPUs (HGX board)8 GPUs (HGX board)
Form factor, coolingSXM5 module, 8-GPU HGX board; airSXM module, 8-GPU HGX board; air or liquid
Price per GPU, October 2026$43,600 (Used 8-GPU node, per GPU)$45,000-$58,750 (New 8-GPU node, per GPU)
Launch price reported in the pressUp to $40,000 per GPU, HSBC (2024)$30,000 to $40,000 per unit, per NVIDIA’s CEO (2024)
Residual band, 2027 (conservative)34-46% of original price40-54% of original price

Tensor Core figures are dense. Prices as of October 2026.

Sources: American Compute, NVIDIA, Managed GPUs (American Compute), Tom's Hardware, CNBC.

The H200 is at the end of its run

Used H200s cost close to a new B200. New H200 lead times ran past 40 weeks in September 2026. In October, used H200 nodes at $348,500 sat above the new volume price and just under the $360,000 entry price of a new B200 node. Cisco’s HGX H200 server reached its last order date on June 25, 2026.

The B200 keeps more of its value

It also keeps more of its value. Our conservative band puts the B200 at 16-26% of original price in 2029 against 7-15% for the H200, because the H200 generation shipped about a year earlier.

Sources: American Compute, NVIDIA, Cisco.

Residual value and appraisals

YearH200B200
202645-59%59-67%
202734-46%40-54%
202824-35%30-42%
20297-15%16-26%
20304-6%6-11%

What a used unit is expected to fetch, as a share of its original price: the conservative band from our residual value report.

H200 appraisal · H200 residual value · B200 appraisal · B200 residual value

Discuss a transaction

Send us the equipment list and the loan or lease you have in mind. We will come back with an indication and the questions we would need answered.