B300 vs B200
More memory and FP4, no FP64. The B300 holds a higher residual band.
The difference
The B300 is a B200 tuned for inference: 1.5 times the dense FP4, 288 GB of memory against 180 GB, and twice the network bandwidth per board, with the same dense FP8 and BF16. It gives up FP64. A new HGX B300 node listed at $400,000 to $450,000 in volume in October 2026, against $360,000 to $470,000 for a B200.
Side by side
| Per GPU | B200 | B300 | B300 / B200 |
|---|---|---|---|
| Architecture, released | Blackwell, Early 2025 | Blackwell Ultra, Late 2025 | |
| Memory | 180 GB (1.4 TB per 8-GPU board) | 288 GB (NVIDIA's HGX table lists 2.1 TB per 8-GPU board) | 1.60x |
| Memory bandwidth | 8 TB/s | 8 TB/s | 1.00x |
| BF16, dense TFLOPS | 2,250 | 2,250 | 1.00x |
| FP8, dense TFLOPS | 4,500 | 4,500 | 1.00x |
| FP4, dense TFLOPS | 9,000 | 13,500 | 1.50x |
| FP64 (Tensor / matrix), TFLOPS | 37 | 1.25 | 0.03x |
| Max power per GPU | 1,000 W air-cooled, 1,200 W liquid | 1,400 W | 1.40x |
| Power per 8 GPUs | About 14 kW | About 15 kW | 1.07x |
| GPU-to-GPU link | NVLink 5, 1.8 TB/s per GPU | NVLink 5, 1.8 TB/s per GPU | |
| Scale-up domain | 8 GPUs (HGX board) | 8 GPUs (HGX board) | |
| Form factor, cooling | SXM module, 8-GPU HGX board; air or liquid | SXM module, 8-GPU HGX board; air or liquid | |
| Price per GPU, October 2026 | $45,000-$58,750 (New 8-GPU node, per GPU) | $50,000-$65,000 (New 8-GPU node, per GPU) | 1.11x |
| Launch price reported in the press | $30,000 to $40,000 per unit, per NVIDIA’s CEO (2024) | - | |
| Residual band, 2027 (conservative) | 40-54% of original price | 52-64% of original price |
Tensor Core figures are dense. Prices as of October 2026.
Sources: American Compute, NVIDIA, Managed GPUs (American Compute), CNBC.
Why B300 quotes vary
Order size and delivery drive the spread. The Rack Report’s volume range sits $70,000 to $90,000 below its single-unit range of $490,000 to $520,000. Servers that ship within weeks cost the most.
Some quotes are inflated. We have seen the same B300 server quoted at both $460,000 and $550,000; a lender advancing 80% on the higher number lends close to 100% of what it is worth.
A higher residual band
Residuals run on technology age. The B300 shipped in late 2025 and the B200 in early 2025, so the B300’s conservative band reads 52-64% of original price for 2027 against 40-54%. NVIDIA flagships now come under a year apart, so the gap can close quickly.
Sources: NVIDIA, American Compute, Managed GPUs (American Compute).
Residual value and appraisals
| Year | B200 | B300 |
|---|---|---|
| 2026 | 59-67% | 78-81% |
| 2027 | 40-54% | 52-64% |
| 2028 | 30-42% | 37-50% |
| 2029 | 16-26% | 28-39% |
| 2030 | 6-11% | 12-21% |
What a used unit is expected to fetch, as a share of its original price: the conservative band from our residual value report.
B200 appraisal · B200 residual value · B300 appraisal · B300 residual value
Book a call
Send us the equipment list and the loan or lease you have in mind. We will come back with a proposed scope and the questions we would need answered.
Prefer email? hello@amcompute.com