B300 vs B200

More memory and FP4, no FP64. The B300 holds a higher residual band.

The difference

The B300 is a B200 tuned for inference: 1.5 times the dense FP4, 288 GB of memory against 180 GB, and twice the network bandwidth per board, with the same dense FP8 and BF16. It gives up FP64. A new HGX B300 node listed at $400,000 to $450,000 in volume in October 2026, against $360,000 to $470,000 for a B200.

Side by side

Per GPUB200B300B300 / B200
Architecture, releasedBlackwell, Early 2025Blackwell Ultra, Late 2025
Memory180 GB (1.4 TB per 8-GPU board)288 GB (NVIDIA's HGX table lists 2.1 TB per 8-GPU board)1.60x
Memory bandwidth8 TB/s8 TB/s1.00x
BF16, dense TFLOPS2,2502,2501.00x
FP8, dense TFLOPS4,5004,5001.00x
FP4, dense TFLOPS9,00013,5001.50x
FP64 (Tensor / matrix), TFLOPS371.250.03x
Max power per GPU1,000 W air-cooled, 1,200 W liquid1,400 W1.40x
Power per 8 GPUsAbout 14 kWAbout 15 kW1.07x
GPU-to-GPU linkNVLink 5, 1.8 TB/s per GPUNVLink 5, 1.8 TB/s per GPU
Scale-up domain8 GPUs (HGX board)8 GPUs (HGX board)
Form factor, coolingSXM module, 8-GPU HGX board; air or liquidSXM module, 8-GPU HGX board; air or liquid
Price per GPU, October 2026$45,000-$58,750 (New 8-GPU node, per GPU)$50,000-$65,000 (New 8-GPU node, per GPU)1.11x
Launch price reported in the press$30,000 to $40,000 per unit, per NVIDIA’s CEO (2024)-
Residual band, 2027 (conservative)40-54% of original price52-64% of original price

Tensor Core figures are dense. Prices as of October 2026.

Sources: American Compute, NVIDIA, Managed GPUs (American Compute), CNBC.

Why B300 quotes vary

Order size and delivery drive the spread. The Rack Report’s volume range sits $70,000 to $90,000 below its single-unit range of $490,000 to $520,000. Servers that ship within weeks cost the most.

Some quotes are inflated. We have seen the same B300 server quoted at both $460,000 and $550,000; a lender advancing 80% on the higher number lends close to 100% of what it is worth.

A higher residual band

Residuals run on technology age. The B300 shipped in late 2025 and the B200 in early 2025, so the B300’s conservative band reads 52-64% of original price for 2027 against 40-54%. NVIDIA flagships now come under a year apart, so the gap can close quickly.

Sources: NVIDIA, American Compute, Managed GPUs (American Compute).

Residual value and appraisals

YearB200B300
202659-67%78-81%
202740-54%52-64%
202830-42%37-50%
202916-26%28-39%
20306-11%12-21%

What a used unit is expected to fetch, as a share of its original price: the conservative band from our residual value report.

B200 appraisal · B200 residual value · B300 appraisal · B300 residual value

Book a call

Send us the equipment list and the loan or lease you have in mind. We will come back with a proposed scope and the questions we would need answered.