More memory and FP4, no FP64. The B300 holds a higher residual band.
The difference
The B300 is a B200 tuned for inference: 1.5 times the dense FP4, 288 GB of memory against 180 GB, and twice the network bandwidth per board, with the same dense FP8 and BF16. It gives up FP64. A new HGX B300 node listed at $400,000 to $450,000 in volume in October 2026, against $360,000 to $470,000 for a B200.
Side by side
| Per GPU | B200 | B300 | B300 / B200 |
|---|---|---|---|
| Architecture, released | Blackwell, Early 2025 | Blackwell Ultra, Late 2025 | |
| Memory | 180 GB (1.4 TB per 8-GPU board) | 288 GB (NVIDIA's HGX table lists 2.1 TB per 8-GPU board) | 1.60x |
| Memory bandwidth | 8 TB/s | 8 TB/s | 1.00x |
| BF16, dense TFLOPS | 2,250 | 2,250 | 1.00x |
| FP8, dense TFLOPS | 4,500 | 4,500 | 1.00x |
| FP4, dense TFLOPS | 9,000 | 13,500 | 1.50x |
| FP64 (Tensor / matrix), TFLOPS | 37 | 1.25 | 0.03x |
| Max power per GPU | 1,000 W air-cooled, 1,200 W liquid | 1,400 W | 1.40x |
| Power per 8 GPUs | About 14 kW | About 15 kW | 1.07x |
| GPU-to-GPU link | NVLink 5, 1.8 TB/s per GPU | NVLink 5, 1.8 TB/s per GPU | |
| Scale-up domain | 8 GPUs (HGX board) | 8 GPUs (HGX board) | |
| Form factor, cooling | SXM module, 8-GPU HGX board; air or liquid | SXM module, 8-GPU HGX board; air or liquid | |
| Price per GPU, October 2026 | $45,000-$58,750 (New 8-GPU node, per GPU) | $50,000-$65,000 (New 8-GPU node, per GPU) | 1.11x |
| Launch price reported in the press | $30,000 to $40,000 per unit, per NVIDIA’s CEO (2024) | - | |
| Residual band, 2027 (conservative) | 40-54% of original price | 52-64% of original price |
Tensor Core figures are dense. Prices as of October 2026.
Sources: American Compute, NVIDIA, Managed GPUs (American Compute), CNBC.
Why B300 quotes vary
Order size and delivery drive the spread. The Rack Report’s volume range sits $70,000 to $90,000 below its single-unit range of $490,000 to $520,000. Servers that ship within weeks cost the most.
Some quotes are inflated. We have seen the same B300 server quoted at both $460,000 and $550,000; a lender advancing 80% on the higher number lends close to 100% of what it is worth.
A higher residual band
Residuals run on technology age. The B300 shipped in late 2025 and the B200 in early 2025, so the B300’s conservative band reads 52-64% of original price for 2027 against 40-54%. NVIDIA flagships now come under a year apart, so the gap can close quickly.
Sources: NVIDIA, American Compute, Managed GPUs (American Compute).
Residual value and appraisals
| Year | B200 | B300 |
|---|---|---|
| 2026 | 59-67% | 78-81% |
| 2027 | 40-54% | 52-64% |
| 2028 | 30-42% | 37-50% |
| 2029 | 16-26% | 28-39% |
| 2030 | 6-11% | 12-21% |
What a used unit is expected to fetch, as a share of its original price: the conservative band from our residual value report.
B200 appraisal · B200 residual value · B300 appraisal · B300 residual value
Discuss a transaction
Send us the equipment list and the loan or lease you have in mind. We will come back with an indication and the questions we would need answered.
Prefer email? hello@amcompute.com