B300 vs B200

More memory and FP4, no FP64. The B300 holds a higher residual band.

The difference

The B300 is a B200 tuned for inference: 1.5 times the dense FP4, 288 GB of memory against 180 GB, and twice the network bandwidth per board, with the same dense FP8 and BF16. It gives up FP64. A new HGX B300 node listed at $400,000 to $450,000 in volume in October 2026, against $360,000 to $470,000 for a B200.

Side by side

Per GPUB200B300B300 / B200
Architecture, releasedBlackwell, Early 2025Blackwell Ultra, Late 2025
Memory180 GB (1.4 TB per 8-GPU board)288 GB (NVIDIA's HGX table lists 2.1 TB per 8-GPU board)1.60x
Memory bandwidth8 TB/s8 TB/s1.00x
BF16, dense TFLOPS2,2502,2501.00x
FP8, dense TFLOPS4,5004,5001.00x
FP4, dense TFLOPS9,00013,5001.50x
FP64 (Tensor / matrix), TFLOPS371.250.03x
Max power per GPU1,000 W air-cooled, 1,200 W liquid1,400 W1.40x
Power per 8 GPUsAbout 14 kWAbout 15 kW1.07x
GPU-to-GPU linkNVLink 5, 1.8 TB/s per GPUNVLink 5, 1.8 TB/s per GPU
Scale-up domain8 GPUs (HGX board)8 GPUs (HGX board)
Form factor, coolingSXM module, 8-GPU HGX board; air or liquidSXM module, 8-GPU HGX board; air or liquid
Price per GPU, October 2026$45,000-$58,750 (New 8-GPU node, per GPU)$50,000-$65,000 (New 8-GPU node, per GPU)1.11x
Launch price reported in the press$30,000 to $40,000 per unit, per NVIDIA’s CEO (2024)-
Residual band, 2027 (conservative)40-54% of original price52-64% of original price

Tensor Core figures are dense. Prices as of October 2026.

Sources: American Compute, NVIDIA, Managed GPUs (American Compute), CNBC.

Why B300 quotes vary

Order size and delivery drive the spread. The Rack Report’s volume range sits $70,000 to $90,000 below its single-unit range of $490,000 to $520,000. Servers that ship within weeks cost the most.

Some quotes are inflated. We have seen the same B300 server quoted at both $460,000 and $550,000; a lender advancing 80% on the higher number lends close to 100% of what it is worth.

A higher residual band

Residuals run on technology age. The B300 shipped in late 2025 and the B200 in early 2025, so the B300’s conservative band reads 52-64% of original price for 2027 against 40-54%. NVIDIA flagships now come under a year apart, so the gap can close quickly.

Sources: NVIDIA, American Compute, Managed GPUs (American Compute).

Residual value and appraisals

YearB200B300
202659-67%78-81%
202740-54%52-64%
202830-42%37-50%
202916-26%28-39%
20306-11%12-21%

What a used unit is expected to fetch, as a share of its original price: the conservative band from our residual value report.

B200 appraisal · B200 residual value · B300 appraisal · B300 residual value

Discuss a transaction

Send us the equipment list and the loan or lease you have in mind. We will come back with an indication and the questions we would need answered.

Prefer email? hello@amcompute.com