AI data center site finder

2,895 US counties scored on transmission, the interconnection queue, power prices and tax. Updated October 18, 2026.

Alabama: best county score 64AL64Alaska: best county score 25AK25Arizona: best county score 85AZ85Arkansas: best county score 75AR75California: best county score 72CA72Colorado: best county score 64CO64Connecticut: best county score 49CT49Delaware: best county score 54DE54District of Columbia: best county score 22DC22Florida: best county score 72FL72Georgia: best county score 68GA68Hawaii: best county score 21HI21Idaho: best county score 60ID60Illinois: best county score 78IL78Indiana: best county score 76IN76Iowa: best county score 71IA71Kansas: best county score 73KS73Kentucky: best county score 72KY72Louisiana: best county score 83LA83Maine: best county score 39ME39Maryland: best county score 65MD65Massachusetts: best county score 55MA55Michigan: best county score 78MI78Minnesota: best county score 66MN66Mississippi: best county score 67MS67Missouri: best county score 70MO70Montana: best county score 50MT50Nebraska: best county score 65NE65Nevada: best county score 89NV89New Hampshire: best county score 38NH38New Jersey: best county score 64NJ64New Mexico: best county score 72NM72New York: best county score 78NY78North Carolina: best county score 72NC72North Dakota: best county score 68ND68Ohio: best county score 63OH63Oklahoma: best county score 82OK82Oregon: best county score 74OR74Pennsylvania: best county score 80PA80Rhode Island: best county score 27RI27South Carolina: best county score 66SC66South Dakota: best county score 46SD46Tennessee: best county score 75TN75Texas: best county score 94TX94Utah: best county score 80UT80Vermont: best county score 29VT29Virginia: best county score 79VA79Washington: best county score 84WA84West Virginia: best county score 61WV61Wisconsin: best county score 72WI72Wyoming: best county score 74WY74
Site score
25 to 90+

Each state shows its best county under the filters.

2,895 counties scored.

Open a county for its queue requests, substations, plants and data centers.

CountyScorePipelinePower price
945.2 GW6.7¢/kWh
916.8 GW6.7¢/kWh
895.4 GW8.4¢/kWh
8521 GW6.7¢/kWh
853.8 GW7.7¢/kWh
84650 MW7.2¢/kWh
8316 GW6.7¢/kWh
831.6 GW6.7¢/kWh
8211 GW6.7¢/kWh
828.3 GW6.7¢/kWh
825.1 GW6.7¢/kWh
824.1 GW6.7¢/kWh
814.4 GW6.7¢/kWh
805.6 GW6.7¢/kWh
802.3 GW6.7¢/kWh
801.9 GW6.7¢/kWh
804.4 GW10.9¢/kWh
802.1 GW8.6¢/kWh
795 GW6.7¢/kWh
794 GW6.7¢/kWh
792.4 GW10.1¢/kWh
784.3 GW6.7¢/kWh
783.8 GW9.3¢/kWh
783.7 GW10.2¢/kWh
783.5 GW10.2¢/kWh
783.5 GW6.7¢/kWh
783.4 GW6.7¢/kWh
783.1 GW6.7¢/kWh
78975 MW6.7¢/kWh
775.1 GW6.7¢/kWh
774.8 GW6.7¢/kWh
774 GW6.7¢/kWh
773.2 GW6.7¢/kWh
77867 MW6.7¢/kWh
77685 MW6.7¢/kWh
768 GW9.2¢/kWh
766.8 GW6.7¢/kWh
765.9 GW6.7¢/kWh
765.3 GW6.7¢/kWh
762 GW6.7¢/kWh
761 GW10.1¢/kWh
753.5 GW6.7¢/kWh
752.3 GW6.7¢/kWh
752.3 GW6.7¢/kWh
752.3 GW6.8¢/kWh
7516 MW6.8¢/kWh
751.6 GW6.8¢/kWh
747.8 GW6.7¢/kWh
745.4 GW6.7¢/kWh
745.4 GW6.7¢/kWh

Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.

What the data shows

The strongest counties for a large AI load are Bexar County, TX (94), Harris County, TX (91), Clark County, NV (89), Pecos County, TX (85) and Maricopa County, AZ (85): each has substations at 345 kV or more, 3.8 GW or more of new generation seeking to connect, and industrial power at 8.4¢/kWh or less.

ISO queues hold 1,284 GW of active generation and storage requests, and ERCOT alone tracks 474.7 GW of large-load requests, 90% of them data centers. We track 138 announced or operating AI campuses; Texas has the most (27).

Industrial power is cheapest in New Mexico (5.2¢/kWh), Louisiana (6.7¢/kWh) and Oklahoma (6.7¢/kWh) (EIA, July 2026 YTD). 29 states exempt data center equipment from sales tax; 5 have paused or repealed theirs.

Where AI data centers are being built

138 US AI campuses of roughly 50 MW and up, announced, under construction or operating, from company releases, filings and trade press. By state: Texas 27, Virginia 15, Ohio 9, Pennsylvania 7, Nevada 4, Missouri 4, Oregon 4, Georgia 4. MW as announced (some gross, some IT); blank where none was given.

CampusDeveloperCountyMWStatusSource
Fermi America Project Matador (HyperGrid)Users: TensorWaveFermi AmericaCarson County, TX11,000under constructionOn-site powerFermi via ACCESS NewswireAug 2026
Stratos (O'Leary Digital)Kevin O'Leary Digital (O'Leary Ventures)Box Elder County, UT9,000announcedChristian Science MonitorJun 5, 2026
PORTS-Pike Technology CampusUsers: OpenAISB Energy (SoftBank)Pike County, OH8,000announcedGrid + on-site powerOpenAIAug 17, 2026
Data City TexasEnergy Abundance Development Corp.Webb County, TX5,000announcedOn-site powerDCDMar 2025
Meta HyperionUsers: MetaMeta / Blue Owl JVRichland Parish, LA5,000under constructionMetaDec 2024
Homer City Energy CampusHomer City Redevelopment / Knighthead / KiewitIndiana County, PA4,500announcedOn-site powerDCDApr 2025
TECfusions Keystone ConnectTECfusionsWestmoreland County, PA3,000announcedGrid + on-site powerDCDJan 2025
Tract Hanover Technology ParkTractHanover County, VA2,400announcedGreater Richmond PartnershipMay 23, 2025
AWS Project Rainier (New Carlisle)Users: AnthropicAmazon Web ServicesSt. Joseph County, IN2,200operatingConverge DigestOct 2025
Aligned Project Phoenix (Shippingport Industrial Park)Aligned Data Centers / Frontier GroupBeaver County, PA2,000under constructionOn-site powerDCDSep 10, 2026
IREN Sweetwater hubIRENNolan County, TX2,000under constructionConverge DigestMay 2026
Project Horizon (Longfellow Ranch)Users: CoreWeave, PoolsidePoolsidePecos County, TX2,000under constructionOn-site powerPoolsideOct 15, 2025
Switch Citadel Campus (Tahoe Reno)SwitchStorey County, NV2,000operatingSwitchOct 2026
AWS Susquehanna campus (Salem Township)Amazon Web ServicesLuzerne County, PA1,920operatingUtility DiveJun 11, 2025
Crusoe / Tallgrass Cheyenne AI campusCrusoe / TallgrassLaramie County, WY1,800announcedOn-site powerAP via YahooJul 28, 2025
Joliet Technology CenterPowerHouse Data Centers and Hillwood (PowerHouse Hillwood HoWill County, IL1,800announcedCity of JolietMar 19, 2026
Tract Buckeye data center parkTractMaricopa County, AZ1,800announcedAZFamilyAug 30, 2024
T5@Chicago IV (Grayslake)T5 Data CentersLake County, IL1,550announcedBlackridge ResearchSep 20, 2026
Hassayampa Ranch data center campusArizona Land ConsultingMaricopa County, AZ1,500announcedPhoenix Business Journal via OrionDec 2025
Vantage Frontier (Stargate Shackelford County)Users: Oracle, OpenAIVantage Data CentersShackelford County, TX1,400under constructionOn-site powerDCDAug 19, 2025
Monarch Compute CampusUsers: AnthropicNscale / Monarch developersMason County, WV1,300announcedOn-site powerTechCrunchAug 26, 2026
Prometheus Hyperscale Evanston campusPrometheus HyperscaleUinta County, WY1,250announcedOn-site powerDCDJun 2026
CloudBurst San Marcos campusCloudBurstGuadalupe County, TX1,200under constructionOn-site powerDCDNov 2025
Nebius Independence AI factoryUsers: NebiusNebiusJackson County, MO1,200under constructionDCDMay 12, 2026
Stargate Abilene (Lancium Clean Campus)Users: Oracle, OpenAICrusoe / LanciumTaylor County, TX1,200operatingGrid + on-site powerCrusoeMar 18, 2025
Stargate Milam County (SB Energy)Users: OpenAISB Energy (SoftBank)Milam County, TX1,200under constructionGrid + on-site powerSoftBank GroupSep 24, 2025
AWS Morrow County exascale campus (former Threemile Canyon Farms land)Amazon Web ServicesMorrow County, OR1,000announcedDaily TidingsApr 5, 2026
Crusoe / Lancium Childress campusUsers: Hyperscaler (unnamed; reported Meta)Crusoe / LanciumChildress County, TX1,000announcedGrid + on-site powerCrusoeJul 15, 2026
Hut 8 Beacon PointUsers: Investment-grade tenant (reported NVIDIA), Lambda, AnthropicHut 8Nueces County, TX1,000under constructionDCDMay 2026
Meta El Paso AI data centerUsers: MetaMetaEl Paso County, TX1,000under constructionGrid + on-site powerDCDOct 15, 2025
Meta Lebanon (LEAP District)Users: MetaMetaBoone County, IN1,000under constructionMetaFeb 2026
Meta Prometheus (New Albany campus)Users: MetaMetaLicking County, OH1,000operatingGrid + on-site powerMeta EngineeringSep 29, 2025
STACK Stafford Technology CampusSTACK Infrastructure (land bought from Peterson Companies)Stafford County, VA1,000under constructionBaxtelMay 25, 2026
Stargate Michigan, The Barn (Saline Township)Users: Oracle, OpenAIRelated DigitalWashtenaw County, MI1,000under constructionRelated CompaniesOct 30, 2025
Texas Critical Data Centers (TCDC)New Era Energy & DigitalEctor County, TX1,000announcedOn-site powerBusiness WireDec 11, 2025
Vantage Lighthouse (Stargate Wisconsin)Users: Oracle, OpenAIVantage Data CentersOzaukee County, WI1,000under constructionBusiness WireOct 22, 2025
CleanArc VA1 campusCleanArc Data CentersCaroline County, VA900under constructionConstruction DiveDec 1, 2025
Crusoe Abilene expansion (Microsoft)Users: MicrosoftCrusoeTaylor County, TX900under constructionGrid + on-site powerCrusoeMar 27, 2026
Project SailPrologis (from Atlas Development)Coweta County, GA900announcedDCDApr 2026
Tract Peru Shelf Technology ParkTract (Fleet Data Centers building on site)Storey County, NV810under constructionBaxtelOct 2026
Galaxy HeliosUsers: CoreWeaveGalaxy DigitalDickens County, TX800operatingGalaxyApr 23, 2025
Amazon Mattameade data center campus (formerly Orrock Tech Campus)Users: Amazon Web ServicesAmazon Data ServicesCaroline County, VA770announcedVirginia BusinessFeb 20, 2025
IREN Childress (Horizon)Users: MicrosoftIRENChildress County, TX750operatingSECNov 3, 2025
Digital Realty Astra Enterprise Park campusDigital RealtyJohnson County, KS600announcedHoodlineAug 11, 2026
Project BlueBeale InfrastructurePima County, AZ600under constructionKOLDMay 14, 2026
Red Wolf DCD data center campus (west of Kansas Speedway)Red Wolf DCD PropertiesWyandotte County, KS600announcedConstruction Review OnlineApr 23, 2026
Bitdeer ClaringtonBitdeerMonroe County, OH570announcedSECMar 16, 2026
TeraWulf Lake MarinerUsers: Fluidstack (Google backstop), Core42TeraWulfNiagara County, NY500operatingDCDAug 2025
Switch Las Vegas Core CampusSwitchClark County, NV495operatingSwitchOct 2026
TA Realty Leesburg data center campus (Sycolin Road)Users: Single unnamed global cloud providerTA Realty (TA Digital Group)Loudoun County, VA450operatingConnect CREFeb 6, 2026
Applied Digital Delta Forge 1Users: Investment-grade hyperscaler (unnamed)Applied DigitalRapides Parish, LA430under constructionApplied DigitalJan 2026
Applied Digital Polaris Forge 3Users: Investment-grade hyperscaler (unnamed)Applied DigitalOliver County, ND430announcedApplied DigitalMay 20, 2026
AWS Lake Anna Technology CampusAmazon Web ServicesLouisa County, VA420under constructionBaxtelOct 2026
TeraWulf Justified Data CampusUsers: AnthropicTeraWulfHancock County, KY401under constructionTeraWulfAug 2026
Applied Digital Polaris Forge 1Users: CoreWeaveApplied DigitalDickey County, ND400operatingBisnowJun 2025
CyrusOne DFW10 (Thad Hill Energy Center)CyrusOneBosque County, TX400under constructionGrid + on-site powerCalpineNov 2025
Bitfarms Panther CreekBitfarms (Keel Infrastructure)Carbon County, PA350under constructionBitfarmsMar 2026
Cipher Barber LakeUsers: Fluidstack (Google backstop), AnthropicCipher DigitalMitchell County, TX300operatingThe BlockSep 25, 2025
Cipher Black PearlUsers: Amazon Web ServicesCipher DigitalWinkler County, TX300operatingGlobeNewswireAug 4, 2026
CoreWeave LancasterUsers: CoreWeaveChirisa Technology Parks / Machine Investment GroupLancaster County, PA300under constructionDCDJul 15, 2025
Nebius Vineland (DataOne)Users: Nebius, MicrosoftDataOneCumberland County, NJ300operatingGrid + on-site powerNebiusMar 2025
xAI Colossus 1Users: xAI, AnthropicxAI (SpaceX)Shelby County, TN300operatingGrid + on-site powerDCDNov 2024
CleanSpark Sealy AI campusCleanSparkAustin County, TX285under constructionCleanSparkOct 2025
Applied Digital Polaris Forge 2Users: Investment-grade hyperscaler (unnamed)Applied DigitalCass County, ND280under constructionDCDAug 2025
Core Scientific DentonUsers: CoreWeaveCore ScientificDenton County, TX260operatingBusiness WireFeb 26, 2025
CoreWeave Kenilworth (NEST campus)Users: CoreWeaveCoreWeaveUnion County, NJ250under constructionBisnowJul 2025
Hut 8 River BendUsers: Fluidstack (Google backstop), AnthropicHut 8West Feliciana Parish, LA245under constructionDCDDec 2025
Riot RockdaleUsers: AMD, frontier AI lab (reported Anthropic)Riot PlatformsMilam County, TX241operatingYahoo FinanceJan 16, 2026
Ionic Digital CedarvaleUsers: Nscale, MicrosoftIonic DigitalWard County, TX234operatingRuntime WireAug 2026
Applied Digital Delta Forge 2Users: Investment-grade hyperscaler (unnamed)Applied DigitalTuscaloosa County, AL210announcedDCDSep 2026
EdgeCore Culpeper campus (Culpeper Technology Zone)EdgeCore Digital InfrastructureCulpeper County, VA196announcedEdgeCore Digital InfrastructureOct 2026
Vantage VA4 campusVantage Data CentersStafford County, VA192under constructionStafford County Economic DevelopmentNov 6, 2025
Core Scientific PecosUsers: AMDCore ScientificReeves County, TX185under constructionDCDJul 2026
Abernathy campus (Fluidstack JV)Users: Fluidstack (Google backstop)Fluidstack-led JV (TeraWulf selling stake)Hale County, TX168under constructionDCDOct 28, 2025
QTS Aurora-Denver campus (DEN1)QTS Data CentersArapahoe County, CO160operatingSentinel ColoradoJul 8, 2026
Lambda Kansas City AI factoryUsers: LambdaLambdaPlatte County, MO100operatingLambdaOct 28, 2025
NAS Lemoore AI data centerCyrusOne and Ameresco, with the U.S. NavyKings County, CA100announcedOn-site powerAmeresco via Business WireSep 9, 2025
WhiteFiber NC-1Users: NscaleWhiteFiberRockingham County, NC99operatingDCDDec 2025
Core Scientific MarbleUsers: CoreWeaveCore ScientificCherokee County, NC65operatingCore ScientificJul 28, 2026
AWS Birchwood data center campusUsers: Amazon Web ServicesAmazon Web ServicesKing George County, VA-announcedFredericksburg Free PressOct 7, 2026
AWS Boardman area data center campusesAmazon Web ServicesMorrow County, OR-operatingTri-Cities Area Journal of BusinessApr 14, 2026
AWS Butts County campusAmazon Web ServicesButts County, GA-announcedThe RegisterJan 8, 2025
AWS Keystone Trade Center (Falls Township)Amazon Web ServicesBucks County, PA-announcedWHYYJun 9, 2025
AWS New Albany campusAmazon Web ServicesLicking County, OH-operatingDCDDec 2024
AWS Project Atlas (Madison County)Amazon Web ServicesMadison County, MS-under constructionDCDNov 2025
AWS Richmond County campusAmazon Web ServicesRichmond County, NC-under constructionConnect CREJun 2025
AWS Vicksburg campusAmazon Web ServicesWarren County, MS-announcedMississippi Public BroadcastingNov 2025
Beale Infrastructure De Soto campus (Project Pilot)Beale InfrastructureJohnson County, KS-under constructionKansas City Star via GovTechJul 9, 2026
Core Scientific DaltonUsers: CoreWeave, AMD-backed neocloudCore ScientificWhitfield County, GA-operatingCore ScientificJul 28, 2026
Core Scientific MuskogeeUsers: CoreWeave, AMDCore ScientificMuskogee County, OK-operatingCore ScientificNov 18, 2024
CRG Festus hyperscale campusCRG (Clayco)Jefferson County, MO-announcedSt. Louis Public RadioApr 8, 2026
Devlin Tech ParkUsers: Amazon Web ServicesAmazon Data Services (bought the site from Stanley Martin)Prince William County, VA-announcedNorthern Virginia MagazineNov 4, 2025
Digital Realty Digital Dulles campusUsers: Unnamed investment-grade hyperscale tenantsDigital RealtyLoudoun County, VA-operatingGlobal Data Center HubJul 6, 2026
Google Armstrong County campusUsers: GoogleGoogleArmstrong County, TX-under constructionBloombergNov 14, 2025
Google Berkeley County data center campus (Mount Holly Commerce Park)GoogleBerkeley County, SC-operatingABC News 4 (WCIV)Oct 13, 2025
Google Cedar RapidsUsers: GoogleGoogleLinn County, IA-under constructionGoogleMay 30, 2025
Google Chesterfield data center campus (Project Peanut, Bermuda Hundred Road)Users: GoogleGoogleChesterfield County, VA-under constructionVPMOct 1, 2026
Google Columbus (South High Street)Users: GoogleGoogleFranklin County, OH-operatingAP via ABC NewsJun 2024
Google Council BluffsUsers: GoogleGooglePottawattamie County, IA-operatingDCDJun 2025
Google Dorchester County data center campuses (Ridgeville and St. George)GoogleDorchester County, SC-under constructionGoogleOct 2026
Google Fort Wayne (Project Zodiac)Users: GoogleGoogleAllen County, IN-under constructionIndiana Economic Development CorporationApr 26, 2024
Google Haskell County campusesUsers: GoogleGoogleHaskell County, TX-announcedGrid + on-site powerAP via KSATNov 15, 2025
Google Hermantown data center campusGoogle (Mortenson development partner)St. Louis County, MN-announcedMPR NewsJun 25, 2026
Google Kansas City Northland (Project Mica)Users: GoogleGoogleClay County, MO-announcedKansas City Star via YahooFeb 14, 2026
Google LancasterUsers: GoogleGoogleFairfield County, OH-operatingAP via ABC NewsJun 2024
Google Lincoln data center campusGoogleLancaster County, NE-under constructionGoogleOct 2026
Google New AlbanyUsers: GoogleGoogleLicking County, OH-operatingAP via ABC NewsJun 2024
Google Papillion data center campusGoogleSarpy County, NE-operatingGoogleOct 2026
Google Pryor (MidAmerica Industrial Park)Users: GoogleGoogleMayes County, OK-operatingThe Oklahoman via YahooAug 2025
Google StillwaterUsers: GoogleGooglePayne County, OK-under constructionDCDMar 2025
Google Storey County data center (Tahoe-Reno Industrial Center)GoogleStorey County, NV-operatingGoogleOct 2026
Google The Dalles data center campusGoogleWasco County, OR-operatingColumbia Community ConnectionAug 4, 2026
Google West MemphisUsers: GoogleGoogleCrittenden County, AR-under constructionGoogleOct 2, 2025
GW Ranch (Amazon campus)Users: AmazonAmazon / Pacifico EnergyPecos County, TX-announcedOn-site powerDCDJan 2026
Joule High Performance Compute CampusJoule Capital PartnersMillard County, UT-announcedOn-site powerENRAug 2025
Meta Aiken County data center (Sage Mill Industrial Park)MetaAiken County, SC-under constructionMetaOct 2026
Meta Beaver DamUsers: MetaMetaDodge County, WI-under constructionDCDNov 12, 2025
Meta Bowling GreenUsers: MetaMetaWood County, OH-under constructionJobsOhioApr 9, 2025
Meta DeKalb data center campusMetaDeKalb County, IL-operatingOffice of the Governor of IllinoisNov 29, 2023
Meta Gallatin (tent expansion)Users: MetaMetaSumner County, TN-under constructionDCDOct 2025
Meta Henrico Data Center (White Oak Technology Park)Users: MetaMetaHenrico County, VA-operatingRichmond BizSenseNov 28, 2022
Meta Prineville data center campusMetaCrook County, OR-operatingMetaOct 2026
Meta Rosemount data center (UMore Park)MetaDakota County, MN-under constructionEpoch AIJul 28, 2026
Meta Sarpy data center campusMetaSarpy County, NE-operatingWOWTJul 28, 2022
Microsoft Fairwater (Mount Pleasant)Users: Microsoft, OpenAIMicrosoftRacine County, WI-operatingMicrosoftSep 18, 2025
Microsoft Fairwater AtlantaUsers: Microsoft, OpenAIMicrosoft (QTS campus)Fayette County, GA-operatingAtlanta Journal-ConstitutionNov 2025
Microsoft Malaga data center campusMicrosoftChelan County, WA-under constructionKPQJun 15, 2023
Microsoft Mecklenburg County data center campuses (Boydton, South Hill, ClarksviUsers: MicrosoftMicrosoftMecklenburg County, VA-operatingSoVaNOW (The News & Record / Mecklenburg Sun)Dec 31, 2025
Microsoft Quincy data center campusMicrosoftGrant County, WA-operatingColumbia Basin Herald (Source ONE)Jan 13, 2026
Project Jupiter (Stargate Dona Ana County)Users: Oracle, OpenAISTACK Infrastructure / BorderPlex Digital AssetsDoña Ana County, NM-under constructionOn-site powerDCDOct 2025
Project Skyway (Google Pine Island data center)Users: GoogleRyan Companies for GoogleGoodhue County, MN-announcedBlandin on BroadbandJul 25, 2026
QTS Cedar Rapids (Big Cedar Industrial Center)QTSLinn County, IA-under constructionDCDAug 2025
QTS Eagle MountainUsers: Meta (reported)QTSUtah County, UT-under constructionEpoch AIOct 2026
QTS Richmond campus (White Oak Technology Park) and RIC4/RIC5 expansionQTS Data CentersHenrico County, VA-operatingRichmond BizSenseMay 18, 2026
Sabey Intergate.Quincy campusSabey Data CentersGrant County, WA-operatingTrade and Industry DevelopmentJun 16, 2023
Stargate Lordstown (former Foxconn plant)Users: OpenAISoftBank / FoxconnTrumbull County, OH-under constructionOpenAISep 23, 2025
xAI Colossus 2 (Tulane Road)Users: xAI, Anthropic, GooglexAI (SpaceX)Shelby County, TN-operatingOn-site powerSemiAnalysisSep 2025
xAI MACROHARDRR (Southaven)Users: xAIxAI (SpaceX)DeSoto County, MS-under constructionOn-site powerDCDJan 2026

Interconnection queues and large-load requests

A queue is the line of requests waiting for the grid operator to study a connection. Generation queues show where new supply and grid upgrades are coming; large-load requests show the competition for them. Active requests only, as each ISO publishes them (see the glossary entry).

ISO / RTOActive requestsMWAgreement signedLargest typesQueue file
ERCOT (Texas)Large loads: see below1,680439 GW140 GWStorage 36%, Solar 34%, Gas 18%Oct 1, 2026
PJM (Mid-Atlantic and Midwest)Large loads: see below2,788328 GW24 GWSolar 45%, Storage 22%, Wind 18%Oct 18, 2026
MISO (Midwest and South)1,108256 GW11 GWOther or not stated 28%, Solar 25%, Storage 17%Oct 18, 2026
SPP (Plains)680140 GW64 GWGas 25%, Storage 22%, Solar 21%Oct 15, 2026
CAISO (California)26174 GW59 GWSolar or wind + storage 62%, Storage 33%, Wind 4%Oct 18, 2026
NYISO (New York)22036 GW10 GWStorage 49%, Wind 20%, Solar 17%Oct 18, 2026
ISO New England5011 GWn/aStorage 52%, Wind 37%, Solar 10%Oct 18, 2026
  • ERCOT. As of June 2026, ERCOT was tracking about 474.7 GW of large loads seeking interconnection through 2033; ERCOT counts 420.8 GW of the requests as data centers (90.2% in its project-type breakdown). 5.9 GW was energized and 3.2 GW approved to energize but not yet operating; 36.0 GW had met the study requirements, 135.5 GW was under ERCOT review and 284.3 GW had not submitted studies. In September 2026 ERCOT conditionally placed 66.4 GW in its Batch Zero study as base load and 127.9 GW as studied load, and has paused energizing new large data centers pending the audit Gov. Abbott ordered on August 3. ERCOT, Jul 29, 2026
  • PJM. PJM forecasts its summer peak at 222,106 MW in 2036, up 65,733 MW in ten years, with large load adjustments for data center growth in 14 transmission zones, including Dominion (Virginia), AEP, ComEd and PECO. Near-term adjustments now require firm commitments, so they came down from the 2025 forecast. PJM, Jan 14, 2026
  • NYISO. The only ISO queue that lists large loads by county: 53 active load requests totaling 14 GW, many of them data centers and crypto mining. They are counted county by county in the explorer.

Top points of interconnection by queued MW

The substations and lines with the most active generation and storage requests: where developers expect the grid to take new supply, and where co-located load has the most to plug into.

#Point of interconnectionCountyISORequestsQueued MWMostly
1Larrabee 230 kVMonmouth County, NJPJM35,650Wind
2Marysville-Flatlick 765 kVMadison County, OHPJM115,200Solar
3Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7BWilbarger County, TXERCOT54,749Gas
4#3308 Pin Oak 345KVAnderson County, TXERCOT33,789Gas
5Nelson-Electric Junction 345 kVLee County, ILPJM113,200Storage
6Delaney-Colorado River 500 kV LineLa Paz County, AZCAISO13,200Solar or wind + storage
723908 Deaf Smith station 345 kVDeaf Smith County, TXERCOT33,021Gas
8Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuitPecos County, TXERCOT33,009Gas
9Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit linePecos County, TXERCOT33,008Gas
10Tap 345 kV (Bus #1048) Tonkawa Switch – (Bus #11050) Dusty RoadFisher County, TXERCOT13,000Gas
11Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02Mitchell County, TXERCOT32,890Storage
12#60404 Solstice Substation 345 kVReeves County, TXERCOT42,707Gas
13Deans 500 kVMiddlesex County, NJPJM22,610Wind
14Tap Double circuit line between Jacksbro_5 (1429) to Willowck_5 (1421) and JacksJack County, TXERCOT22,546Gas
15Indian River 230kVSussex County, DEPJM32,513Wind
16Oceana 230 kVChesapeake city, VAPJM32,489Wind
17Tap 345kV 80286 DULCE7A - 8676 STATIC7AVictoria County, TXERCOT32,430Nuclear
18Byron - Wayne 345 kVOgle County, ILPJM62,400Storage
19Nelson-Electric Junction 345kVLee County, ILPJM22,400Storage
20Moss Landing 500 kVMonterey County, CACAISO22,250Solar or wind + storage
21SIOUXSt. Charles County, MOMISO12,220Gas
22Larrabee Collector Station 230 kVAtlantic County, NJPJM12,139Wind
23Belmont-Flint Run 500 kVDoddridge County, WVPJM12,100Gas
24Trout Canyon Substation 230 kVClark County, NVCAISO62,050Solar or wind + storage
25345kV 7042 Zorn SubstationGuadalupe County, TXERCOT52,000Gas

Industrial power prices by state

Average price to industrial customers, July 2026 YTD, against the same months a year earlier (EIA Electric Power Monthly, Table 5.6.B). A large load's own rate depends on its utility tariff or contract.

#StateIndustrial, ¢/kWhA year earlierChange
1New Mexico5.216.02-13%
2Louisiana6.656.38+4%
3Oklahoma6.696.01+11%
4Texas6.726.47+4%
5Arkansas6.826.63+3%
6Tennessee6.826.86-1%
7Montana6.837.04-3%
8Washington7.156.83+5%
9Iowa7.387.06+5%
10Kentucky7.507.00+7%
11Arizona7.668.22-7%
12Mississippi7.667.33+5%
13South Carolina7.857.13+10%
14North Carolina7.917.80+1%
15Alabama7.937.76+2%
16Georgia7.998.16-2%
17Idaho8.148.07+1%
18North Dakota8.187.48+9%
19Kansas8.307.94+5%
20Oregon8.338.26+1%
21Nevada8.437.77+8%
22West Virginia8.558.08+6%
23Utah8.588.23+4%
24Missouri8.628.29+4%
25Nebraska8.658.15+6%
26Wyoming8.788.67+1%
27Indiana9.158.77+4%
28Florida9.218.77+5%
29Michigan9.338.65+8%
30Wisconsin9.398.89+6%
31South Dakota9.468.67+9%
32Colorado9.608.96+7%
33Minnesota9.759.25+5%
34Virginia10.089.26+9%
35Illinois10.249.96+3%
36New York10.249.57+7%
37Ohio10.328.16+26%
38Pennsylvania10.939.04+21%
39Delaware11.739.68+21%
40Vermont12.9312.26+5%
41New Jersey15.1813.70+11%
42Maryland15.2812.26+25%
43Maine15.6115.12+3%
44New Hampshire18.2116.89+8%
45Connecticut18.5019.15-3%
46Massachusetts19.9919.53+2%
47California20.7420.760%
48District of Columbia20.9814.74+42%
49Rhode Island21.8622.00-1%
50Alaska24.0219.99+20%
51Hawaii37.5931.63+19%

State data center sales tax exemptions

Sales and use tax exemptions for data center equipment, as published by each state, with the main thresholds. General information only, not tax advice: programs change often and qualifying is case by case, so ask your tax advisor.

StateStatusProgramMin. investmentMin. jobsElectricitySource
AlabamaIn forceAlabama data processing center tax abatement (Code of Ala. 40-9B-3, 40-9B-4, 40-9B-4.1, as amended by 2026 HB 399)-20NoAlabama Legislature
ArkansasIn forceArkansas data center sales and use tax exemption (Ark. Code 26-52-456)$100M-ExemptArkansas General Assembly
ConnecticutIn forceConnecticut qualified data center tax incentive agreements (CGS 32-286, P.A. 21-1)$50M-ExemptConnecticut General Assembly
FloridaIn forceFlorida data center property exemption (Fla. Stat. 212.08(5)(r))$150M-ExemptThe Florida Senate
GeorgiaIn forceGeorgia high-technology data center equipment sales and use tax exemption (O.C.G.A. 48-8-3(68.1))$25M5NoOffice of the Governor of Georgia
IdahoIn forceIdaho information technology equipment exemption (Idaho Code 63-3622VV)$250M30NoIdaho Legislature
IndianaIn forceIndiana data center sales tax exemption (IC 6-2.5-15)$25M-ExemptIndiana Economic Development Corporation
IowaIn forceIowa data center sales and use tax exemption (Iowa Code 423.3(95)), with partial refunds for smaller data centers (Iowa Code 423.4(7) and (8))$200M-ExemptIowa Department of Revenue
KansasIn forceKansas SB 98 data center sales tax exemption (K.S.A. 79-3606, as amended by 2025 SB 98)$250M20NoKansas Legislature
KentuckyIn forceKentucky qualified data center project sales and use tax exemption (KRS 139.499; KRS 154.20-220 to 154.20-229)$25M-NoKentucky General Assembly
LouisianaIn forceLouisiana data center sales and use tax exemption (R.S. 47:305.73, as amended by Act 730 of 2024), administered by Louisiana Economic Development$200M50NoLouisiana Legislature
MarylandIn forceMaryland qualified data center sales and use tax exemption (Tax-General § 11-239)$2M5NoMaryland General Assembly
MichiganIn forceMichigan enterprise data center sales and use tax exemption (MCL 205.54ee and 205.94cc; 2024 PA 207 and PA 181)$250M30NoMichigan Strategic Fund / MEDC
MinnesotaIn forceMinnesota qualified data center sales tax exemption (Minn. Stat. § 297A.68, subd. 42)$30M-NoMinnesota Office of the Revisor of Statutes
MississippiIn forceMississippi data center tax exemption (Miss. Code §§ 57-113-21 to 57-113-27; electricity under § 27-65-107)$20M20ExemptMississippi Legislature
MissouriIn forceMissouri data storage center sales and use tax exemption (RSMo § 144.810)$25M10ExemptMissouri Revisor of Statutes
New YorkIn forceNew York internet data center sales and use tax exemption (Tax Law § 1115(a)(37))--NoNew York State Senate
North CarolinaIn forceNorth Carolina qualifying datacenter exemption (G.S. 105-164.13(55a); definition G.S. 105-164.3(201))$75M-NoNorth Carolina Department of Revenue
North DakotaIn forceNorth Dakota qualified data center sales and use tax exemption (N.D.C.C. § 57-39.2-04.17)--NoNorth Dakota Legislative Branch
OklahomaIn forceOklahoma computer services and data processing sales tax exemption (68 O.S. § 1357(21))--NoOklahoma Department of Commerce
PennsylvaniaIn forcePennsylvania Computer Data Center Equipment Exemption Program (Act 84 of 2016, as amended by Act 25 of 2021), administered by the Department of Revenue$75M25NoPennsylvania Department of Revenue
South CarolinaIn forceSouth Carolina datacenter sales and use tax exemption (S.C. Code 12-36-2120(79))$50M25ExemptSouth Carolina General Assembly
TennesseeIn forceTennessee qualified data center sales and use tax exemption (Tenn. Code Ann. 67-6-206)$100M15ExemptTennessee Department of Revenue
TexasIn forceTexas qualifying data center sales and use tax exemption (Tax Code 151.359; large data center projects under 151.3595)$200M20ExemptTexas Comptroller of Public Accounts
UtahIn forceUtah qualifying data center sales and use tax exemption (Utah Code 59-12-104(84))--NoUtah State Legislature
VirginiaIn forceVirginia data center equipment sales and use tax exemption (Va. Code 58.1-609.3(18))$70M10NoVirginia General Assembly (Legislative Information System)
WashingtonIn forceWashington computer data center sales and use tax exemptions: rural counties (RCW 82.08.986 and 82.12.986) and counties over 800,000 people (RCW 82.08.9861 and 82.12.9861)-3NoWashington State Legislature
WisconsinIn forceWisconsin qualified data center sales and use tax exemption (Wis. Stat. 77.54(70), 2023 Wis. Act 19)$50M-ExemptWisconsin Department of Revenue
WyomingIn forceWyoming data processing services center sales and use tax exemption (Wyo. Stat. 39-15-105(a)(viii)(S))$5M-NoWyoming Legislature
NevadaPartialNevada data center partial tax abatement (NRS 360.754), administered by the Governor's Office of Economic Development$25M10-Nevada Legislature
ArizonaPausedArizona computer data center tax relief program (A.R.S. 41-1519; TPT and use tax deductions under 42-5061, 42-5075, 42-5159, 42-6004)$25M-NoArizona Legislature
IllinoisPausedIllinois Data Center Investment Program (20 ILCS 605/605-1025)$250M20NoIllinois Department of Commerce and Economic Opportunity
MassachusettsPausedMassachusetts qualified data center sales and use tax exemption (M.G.L. c. 64H, s. 6(zz); c. 23A, s. 70; 400 CMR 9.00)$50M100ExemptMassachusetts Legislature
OhioPausedOhio data center sales and use tax exemption (ORC 122.175), granted by the Tax Credit Authority$100M-NoOhio Legislative Service Commission
NebraskaRepealedNebraska data center sales and use tax exemption (Neb. Rev. Stat. § 77-2704.62), repealed---Nebraska Legislature
AlaskaNone-----
CaliforniaNone----Ryan
ColoradoNone----Colorado General Assembly
DelawareNone----Delaware Division of Revenue
District of ColumbiaNone-----
HawaiiNone-----
MaineNone----Maine Legislature
MontanaNone----Montana Department of Revenue
New HampshireNone----New Hampshire Department of Revenue Administration
New JerseyNone----New Jersey Economic Development Authority
New MexicoNone----New Mexico Taxation and Revenue Department
OregonNone----Oregon Department of Revenue
Rhode IslandNone----Rhode Island Division of Taxation
South DakotaNone----KTIV
VermontNone----Vermont General Assembly
West VirginiaNone----West Virginia Legislature

By state

Methodology and sources

The site score adds six capped parts to a number out of 100. It ranks counties to look at first; it is not a site appraisal, says nothing about a given parcel, and only the utility's load study can say how much power a site can take and when.

  1. Transmission (25 points). Highest substation voltage in the county (500 kV and up 15 points, 345 kV 12, 230 kV 8, 115-161 kV 4), plus 2 points per substation at 230 kV or more, up to 10. Substations are inferred from where HIFLD transmission lines end: ends within 500 m are merged, and a point counts where three or more lines meet or the line records name it.
  2. Generation pipeline (20 points). New generation and storage seeking to connect in the county: active ISO queue requests, or EIA-860M planned generators where that is larger (the only pipeline data outside the seven ISOs). Up to 15 points on a square-root scale reaching full marks at 5 GW, plus up to 5 for MW with a signed interconnection agreement or under construction (full at 1 GW). New supply nearby is where co-location and grid upgrades happen.
  3. Industrial power price (20 points). The state’s average industrial electricity price, year to date (EIA). The cheapest states score 20, the most expensive 0, in a straight line between the 5th and 95th percentile of states.
  4. Existing and retiring plants (15 points). Operating generation in the county, up to 9 points (full at 2 GW, square root), plus up to 6 for plants retired in the last five years or scheduled to retire in the next five (full at 1 GW): their interconnection and land can be reused.
  5. Sales tax exemption (10 points). 10 points where a data center program in force removes the state’s own sales and use tax on data center equipment in full (local taxes may still apply, as in Texas); 5 where it removes only part of the state tax: an abatement down to a reduced rate (Nevada’s, to 2%), an abatement of part of the tax, or a refund of part of it; 4 where a program is pending or paused; 0 otherwise. A state is scored on its main program, not on smaller partial tiers.
  6. Data center activity (10 points). GPU-ready colocation facilities (1 point each), bitcoin mining sites (3 each) and announced AI campuses (4 each), up to 10. Also a proxy for fiber, which has no free county-level dataset.

Counties are placed by the county each source names, and anything with coordinates (transmission line ends, and power plants in Connecticut, whose sources still name the counties it replaced with planning regions in 2022) by the 2024 Census county shapes; colocation facilities and mining sites, which are listed by city, are placed by the Census location of the city. Requests a queue lists without a county count toward the state and ISO totals only. Power prices are state averages (EIA, July 2026 YTD): what a large load pays depends on its utility tariff or contract.

Sources

Related

Cite this

Suggested citation

American Compute, Data Center Site Finder, October 2026, https://www.amcompute.com/data-center-site-finder

Download the CSV

Free to use with attribution.

Discuss a transaction

Funding a data center or the GPUs going into one? Tell us about the site and the capital you need, and we will come back with the lenders and the structure that fit. Operators raising debt for a cluster can start at gpulenders.com.

Prefer email? hello@amcompute.com

Questions

How do I find power for a data center?
Start from the grid, not the land. Shortlist counties with transmission substations at 230 kV or more, generation being built nearby and a low industrial tariff, then ask the utility's large-load team for a load study at a specific substation: that study, not a map, says how many MW you can take and when. Sites with a history of big loads shorten the wait: retiring power plants (their interconnection can be reused), bitcoin mines converting to AI and powered shells. Where the grid can't deliver in time, on-site generation (behind-the-meter) is the fallback. The site finder scores all 2,895 counties on these signals.
What is a data center interconnection queue?
It is the line of requests waiting for a grid operator or utility to study and approve a connection. Generators and storage join the ISO queues (1,284 GW across 6,787 active requests in the seven ISO queues we read); large loads such as data centers go through a large-load process with the utility and, in Texas, ERCOT. ERCOT was tracking 474.7 GW of large-load requests as of June 30, 2026, about 90% of it data centers, with 5.9 GW energized. A queue position is not capacity: most requests never connect, and network upgrades set the date.
Where are AI data centers being built in the US?
Of the 138 announced, under-construction and operating AI campuses we track, the most are in Texas (27), Virginia (15), Ohio (9) and Pennsylvania (7). By announced MW, the largest concentrations are in Carson County, TX (11 GW), Box Elder County, UT (9 GW) and Pike County, OH (8 GW). The site finder lists every campus with its county, developer, MW, status and source.
What is behind-the-meter power for data centers?
Behind-the-meter means generation on or next to the site that feeds the data center directly rather than through the utility grid: gas turbines or engines, fuel cells, or a dedicated line from a power plant. It is used to energize before the grid can deliver. 29 of the 138 campuses we track report on-site or hybrid power. Lenders underwrite the fuel supply, air permits, uptime against the grid and what the plant is worth if the data center goes away.