2,895 US counties scored on transmission, the interconnection queue, power prices and tax. Updated October 18, 2026.
Each state shows its best county under the filters.
2,895 counties scored.
Open a county for its queue requests, substations, plants and data centers.
| County | Score | Pipeline | Power price |
|---|---|---|---|
| 94 | 5.2 GW | 6.7¢/kWh | |
| 91 | 6.8 GW | 6.7¢/kWh | |
| 89 | 5.4 GW | 8.4¢/kWh | |
| 85 | 21 GW | 6.7¢/kWh | |
| 85 | 3.8 GW | 7.7¢/kWh | |
| 84 | 650 MW | 7.2¢/kWh | |
| 83 | 16 GW | 6.7¢/kWh | |
| 83 | 1.6 GW | 6.7¢/kWh | |
| 82 | 11 GW | 6.7¢/kWh | |
| 82 | 8.3 GW | 6.7¢/kWh | |
| 82 | 5.1 GW | 6.7¢/kWh | |
| 82 | 4.1 GW | 6.7¢/kWh | |
| 81 | 4.4 GW | 6.7¢/kWh | |
| 80 | 5.6 GW | 6.7¢/kWh | |
| 80 | 2.3 GW | 6.7¢/kWh | |
| 80 | 1.9 GW | 6.7¢/kWh | |
| 80 | 4.4 GW | 10.9¢/kWh | |
| 80 | 2.1 GW | 8.6¢/kWh | |
| 79 | 5 GW | 6.7¢/kWh | |
| 79 | 4 GW | 6.7¢/kWh | |
| 79 | 2.4 GW | 10.1¢/kWh | |
| 78 | 4.3 GW | 6.7¢/kWh | |
| 78 | 3.8 GW | 9.3¢/kWh | |
| 78 | 3.7 GW | 10.2¢/kWh | |
| 78 | 3.5 GW | 10.2¢/kWh | |
| 78 | 3.5 GW | 6.7¢/kWh | |
| 78 | 3.4 GW | 6.7¢/kWh | |
| 78 | 3.1 GW | 6.7¢/kWh | |
| 78 | 975 MW | 6.7¢/kWh | |
| 77 | 5.1 GW | 6.7¢/kWh | |
| 77 | 4.8 GW | 6.7¢/kWh | |
| 77 | 4 GW | 6.7¢/kWh | |
| 77 | 3.2 GW | 6.7¢/kWh | |
| 77 | 867 MW | 6.7¢/kWh | |
| 77 | 685 MW | 6.7¢/kWh | |
| 76 | 8 GW | 9.2¢/kWh | |
| 76 | 6.8 GW | 6.7¢/kWh | |
| 76 | 5.9 GW | 6.7¢/kWh | |
| 76 | 5.3 GW | 6.7¢/kWh | |
| 76 | 2 GW | 6.7¢/kWh | |
| 76 | 1 GW | 10.1¢/kWh | |
| 75 | 3.5 GW | 6.7¢/kWh | |
| 75 | 2.3 GW | 6.7¢/kWh | |
| 75 | 2.3 GW | 6.7¢/kWh | |
| 75 | 2.3 GW | 6.8¢/kWh | |
| 75 | 16 MW | 6.8¢/kWh | |
| 75 | 1.6 GW | 6.8¢/kWh | |
| 74 | 7.8 GW | 6.7¢/kWh | |
| 74 | 5.4 GW | 6.7¢/kWh | |
| 74 | 5.4 GW | 6.7¢/kWh |
Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.
What the data shows
The strongest counties for a large AI load are Bexar County, TX (94), Harris County, TX (91), Clark County, NV (89), Pecos County, TX (85) and Maricopa County, AZ (85): each has substations at 345 kV or more, 3.8 GW or more of new generation seeking to connect, and industrial power at 8.4¢/kWh or less.
ISO queues hold 1,284 GW of active generation and storage requests, and ERCOT alone tracks 474.7 GW of large-load requests, 90% of them data centers. We track 138 announced or operating AI campuses; Texas has the most (27).
Industrial power is cheapest in New Mexico (5.2¢/kWh), Louisiana (6.7¢/kWh) and Oklahoma (6.7¢/kWh) (EIA, July 2026 YTD). 29 states exempt data center equipment from sales tax; 5 have paused or repealed theirs.
Where AI data centers are being built
138 US AI campuses of roughly 50 MW and up, announced, under construction or operating, from company releases, filings and trade press. By state: Texas 27, Virginia 15, Ohio 9, Pennsylvania 7, Nevada 4, Missouri 4, Oregon 4, Georgia 4. MW as announced (some gross, some IT); blank where none was given.
| Campus | Developer | County | MW | Status | Source |
|---|---|---|---|---|---|
| Fermi America Project Matador (HyperGrid)Users: TensorWave | Fermi America | Carson County, TX | 11,000 | under constructionOn-site power | Fermi via ACCESS NewswireAug 2026 |
| Stratos (O'Leary Digital) | Kevin O'Leary Digital (O'Leary Ventures) | Box Elder County, UT | 9,000 | announced | Christian Science MonitorJun 5, 2026 |
| PORTS-Pike Technology CampusUsers: OpenAI | SB Energy (SoftBank) | Pike County, OH | 8,000 | announcedGrid + on-site power | OpenAIAug 17, 2026 |
| Data City Texas | Energy Abundance Development Corp. | Webb County, TX | 5,000 | announcedOn-site power | DCDMar 2025 |
| Meta HyperionUsers: Meta | Meta / Blue Owl JV | Richland Parish, LA | 5,000 | under construction | MetaDec 2024 |
| Homer City Energy Campus | Homer City Redevelopment / Knighthead / Kiewit | Indiana County, PA | 4,500 | announcedOn-site power | DCDApr 2025 |
| TECfusions Keystone Connect | TECfusions | Westmoreland County, PA | 3,000 | announcedGrid + on-site power | DCDJan 2025 |
| Tract Hanover Technology Park | Tract | Hanover County, VA | 2,400 | announced | Greater Richmond PartnershipMay 23, 2025 |
| AWS Project Rainier (New Carlisle)Users: Anthropic | Amazon Web Services | St. Joseph County, IN | 2,200 | operating | Converge DigestOct 2025 |
| Aligned Project Phoenix (Shippingport Industrial Park) | Aligned Data Centers / Frontier Group | Beaver County, PA | 2,000 | under constructionOn-site power | DCDSep 10, 2026 |
| IREN Sweetwater hub | IREN | Nolan County, TX | 2,000 | under construction | Converge DigestMay 2026 |
| Project Horizon (Longfellow Ranch)Users: CoreWeave, Poolside | Poolside | Pecos County, TX | 2,000 | under constructionOn-site power | PoolsideOct 15, 2025 |
| Switch Citadel Campus (Tahoe Reno) | Switch | Storey County, NV | 2,000 | operating | SwitchOct 2026 |
| AWS Susquehanna campus (Salem Township) | Amazon Web Services | Luzerne County, PA | 1,920 | operating | Utility DiveJun 11, 2025 |
| Crusoe / Tallgrass Cheyenne AI campus | Crusoe / Tallgrass | Laramie County, WY | 1,800 | announcedOn-site power | AP via YahooJul 28, 2025 |
| Joliet Technology Center | PowerHouse Data Centers and Hillwood (PowerHouse Hillwood Ho | Will County, IL | 1,800 | announced | City of JolietMar 19, 2026 |
| Tract Buckeye data center park | Tract | Maricopa County, AZ | 1,800 | announced | AZFamilyAug 30, 2024 |
| T5@Chicago IV (Grayslake) | T5 Data Centers | Lake County, IL | 1,550 | announced | Blackridge ResearchSep 20, 2026 |
| Hassayampa Ranch data center campus | Arizona Land Consulting | Maricopa County, AZ | 1,500 | announced | Phoenix Business Journal via OrionDec 2025 |
| Vantage Frontier (Stargate Shackelford County)Users: Oracle, OpenAI | Vantage Data Centers | Shackelford County, TX | 1,400 | under constructionOn-site power | DCDAug 19, 2025 |
| Monarch Compute CampusUsers: Anthropic | Nscale / Monarch developers | Mason County, WV | 1,300 | announcedOn-site power | TechCrunchAug 26, 2026 |
| Prometheus Hyperscale Evanston campus | Prometheus Hyperscale | Uinta County, WY | 1,250 | announcedOn-site power | DCDJun 2026 |
| CloudBurst San Marcos campus | CloudBurst | Guadalupe County, TX | 1,200 | under constructionOn-site power | DCDNov 2025 |
| Nebius Independence AI factoryUsers: Nebius | Nebius | Jackson County, MO | 1,200 | under construction | DCDMay 12, 2026 |
| Stargate Abilene (Lancium Clean Campus)Users: Oracle, OpenAI | Crusoe / Lancium | Taylor County, TX | 1,200 | operatingGrid + on-site power | CrusoeMar 18, 2025 |
| Stargate Milam County (SB Energy)Users: OpenAI | SB Energy (SoftBank) | Milam County, TX | 1,200 | under constructionGrid + on-site power | SoftBank GroupSep 24, 2025 |
| AWS Morrow County exascale campus (former Threemile Canyon Farms land) | Amazon Web Services | Morrow County, OR | 1,000 | announced | Daily TidingsApr 5, 2026 |
| Crusoe / Lancium Childress campusUsers: Hyperscaler (unnamed; reported Meta) | Crusoe / Lancium | Childress County, TX | 1,000 | announcedGrid + on-site power | CrusoeJul 15, 2026 |
| Hut 8 Beacon PointUsers: Investment-grade tenant (reported NVIDIA), Lambda, Anthropic | Hut 8 | Nueces County, TX | 1,000 | under construction | DCDMay 2026 |
| Meta El Paso AI data centerUsers: Meta | Meta | El Paso County, TX | 1,000 | under constructionGrid + on-site power | DCDOct 15, 2025 |
| Meta Lebanon (LEAP District)Users: Meta | Meta | Boone County, IN | 1,000 | under construction | MetaFeb 2026 |
| Meta Prometheus (New Albany campus)Users: Meta | Meta | Licking County, OH | 1,000 | operatingGrid + on-site power | Meta EngineeringSep 29, 2025 |
| STACK Stafford Technology Campus | STACK Infrastructure (land bought from Peterson Companies) | Stafford County, VA | 1,000 | under construction | BaxtelMay 25, 2026 |
| Stargate Michigan, The Barn (Saline Township)Users: Oracle, OpenAI | Related Digital | Washtenaw County, MI | 1,000 | under construction | Related CompaniesOct 30, 2025 |
| Texas Critical Data Centers (TCDC) | New Era Energy & Digital | Ector County, TX | 1,000 | announcedOn-site power | Business WireDec 11, 2025 |
| Vantage Lighthouse (Stargate Wisconsin)Users: Oracle, OpenAI | Vantage Data Centers | Ozaukee County, WI | 1,000 | under construction | Business WireOct 22, 2025 |
| CleanArc VA1 campus | CleanArc Data Centers | Caroline County, VA | 900 | under construction | Construction DiveDec 1, 2025 |
| Crusoe Abilene expansion (Microsoft)Users: Microsoft | Crusoe | Taylor County, TX | 900 | under constructionGrid + on-site power | CrusoeMar 27, 2026 |
| Project Sail | Prologis (from Atlas Development) | Coweta County, GA | 900 | announced | DCDApr 2026 |
| Tract Peru Shelf Technology Park | Tract (Fleet Data Centers building on site) | Storey County, NV | 810 | under construction | BaxtelOct 2026 |
| Galaxy HeliosUsers: CoreWeave | Galaxy Digital | Dickens County, TX | 800 | operating | GalaxyApr 23, 2025 |
| Amazon Mattameade data center campus (formerly Orrock Tech Campus)Users: Amazon Web Services | Amazon Data Services | Caroline County, VA | 770 | announced | Virginia BusinessFeb 20, 2025 |
| IREN Childress (Horizon)Users: Microsoft | IREN | Childress County, TX | 750 | operating | SECNov 3, 2025 |
| Digital Realty Astra Enterprise Park campus | Digital Realty | Johnson County, KS | 600 | announced | HoodlineAug 11, 2026 |
| Project Blue | Beale Infrastructure | Pima County, AZ | 600 | under construction | KOLDMay 14, 2026 |
| Red Wolf DCD data center campus (west of Kansas Speedway) | Red Wolf DCD Properties | Wyandotte County, KS | 600 | announced | Construction Review OnlineApr 23, 2026 |
| Bitdeer Clarington | Bitdeer | Monroe County, OH | 570 | announced | SECMar 16, 2026 |
| TeraWulf Lake MarinerUsers: Fluidstack (Google backstop), Core42 | TeraWulf | Niagara County, NY | 500 | operating | DCDAug 2025 |
| Switch Las Vegas Core Campus | Switch | Clark County, NV | 495 | operating | SwitchOct 2026 |
| TA Realty Leesburg data center campus (Sycolin Road)Users: Single unnamed global cloud provider | TA Realty (TA Digital Group) | Loudoun County, VA | 450 | operating | Connect CREFeb 6, 2026 |
| Applied Digital Delta Forge 1Users: Investment-grade hyperscaler (unnamed) | Applied Digital | Rapides Parish, LA | 430 | under construction | Applied DigitalJan 2026 |
| Applied Digital Polaris Forge 3Users: Investment-grade hyperscaler (unnamed) | Applied Digital | Oliver County, ND | 430 | announced | Applied DigitalMay 20, 2026 |
| AWS Lake Anna Technology Campus | Amazon Web Services | Louisa County, VA | 420 | under construction | BaxtelOct 2026 |
| TeraWulf Justified Data CampusUsers: Anthropic | TeraWulf | Hancock County, KY | 401 | under construction | TeraWulfAug 2026 |
| Applied Digital Polaris Forge 1Users: CoreWeave | Applied Digital | Dickey County, ND | 400 | operating | BisnowJun 2025 |
| CyrusOne DFW10 (Thad Hill Energy Center) | CyrusOne | Bosque County, TX | 400 | under constructionGrid + on-site power | CalpineNov 2025 |
| Bitfarms Panther Creek | Bitfarms (Keel Infrastructure) | Carbon County, PA | 350 | under construction | BitfarmsMar 2026 |
| Cipher Barber LakeUsers: Fluidstack (Google backstop), Anthropic | Cipher Digital | Mitchell County, TX | 300 | operating | The BlockSep 25, 2025 |
| Cipher Black PearlUsers: Amazon Web Services | Cipher Digital | Winkler County, TX | 300 | operating | GlobeNewswireAug 4, 2026 |
| CoreWeave LancasterUsers: CoreWeave | Chirisa Technology Parks / Machine Investment Group | Lancaster County, PA | 300 | under construction | DCDJul 15, 2025 |
| Nebius Vineland (DataOne)Users: Nebius, Microsoft | DataOne | Cumberland County, NJ | 300 | operatingGrid + on-site power | NebiusMar 2025 |
| xAI Colossus 1Users: xAI, Anthropic | xAI (SpaceX) | Shelby County, TN | 300 | operatingGrid + on-site power | DCDNov 2024 |
| CleanSpark Sealy AI campus | CleanSpark | Austin County, TX | 285 | under construction | CleanSparkOct 2025 |
| Applied Digital Polaris Forge 2Users: Investment-grade hyperscaler (unnamed) | Applied Digital | Cass County, ND | 280 | under construction | DCDAug 2025 |
| Core Scientific DentonUsers: CoreWeave | Core Scientific | Denton County, TX | 260 | operating | Business WireFeb 26, 2025 |
| CoreWeave Kenilworth (NEST campus)Users: CoreWeave | CoreWeave | Union County, NJ | 250 | under construction | BisnowJul 2025 |
| Hut 8 River BendUsers: Fluidstack (Google backstop), Anthropic | Hut 8 | West Feliciana Parish, LA | 245 | under construction | DCDDec 2025 |
| Riot RockdaleUsers: AMD, frontier AI lab (reported Anthropic) | Riot Platforms | Milam County, TX | 241 | operating | Yahoo FinanceJan 16, 2026 |
| Ionic Digital CedarvaleUsers: Nscale, Microsoft | Ionic Digital | Ward County, TX | 234 | operating | Runtime WireAug 2026 |
| Applied Digital Delta Forge 2Users: Investment-grade hyperscaler (unnamed) | Applied Digital | Tuscaloosa County, AL | 210 | announced | DCDSep 2026 |
| EdgeCore Culpeper campus (Culpeper Technology Zone) | EdgeCore Digital Infrastructure | Culpeper County, VA | 196 | announced | EdgeCore Digital InfrastructureOct 2026 |
| Vantage VA4 campus | Vantage Data Centers | Stafford County, VA | 192 | under construction | Stafford County Economic DevelopmentNov 6, 2025 |
| Core Scientific PecosUsers: AMD | Core Scientific | Reeves County, TX | 185 | under construction | DCDJul 2026 |
| Abernathy campus (Fluidstack JV)Users: Fluidstack (Google backstop) | Fluidstack-led JV (TeraWulf selling stake) | Hale County, TX | 168 | under construction | DCDOct 28, 2025 |
| QTS Aurora-Denver campus (DEN1) | QTS Data Centers | Arapahoe County, CO | 160 | operating | Sentinel ColoradoJul 8, 2026 |
| Lambda Kansas City AI factoryUsers: Lambda | Lambda | Platte County, MO | 100 | operating | LambdaOct 28, 2025 |
| NAS Lemoore AI data center | CyrusOne and Ameresco, with the U.S. Navy | Kings County, CA | 100 | announcedOn-site power | Ameresco via Business WireSep 9, 2025 |
| WhiteFiber NC-1Users: Nscale | WhiteFiber | Rockingham County, NC | 99 | operating | DCDDec 2025 |
| Core Scientific MarbleUsers: CoreWeave | Core Scientific | Cherokee County, NC | 65 | operating | Core ScientificJul 28, 2026 |
| AWS Birchwood data center campusUsers: Amazon Web Services | Amazon Web Services | King George County, VA | - | announced | Fredericksburg Free PressOct 7, 2026 |
| AWS Boardman area data center campuses | Amazon Web Services | Morrow County, OR | - | operating | Tri-Cities Area Journal of BusinessApr 14, 2026 |
| AWS Butts County campus | Amazon Web Services | Butts County, GA | - | announced | The RegisterJan 8, 2025 |
| AWS Keystone Trade Center (Falls Township) | Amazon Web Services | Bucks County, PA | - | announced | WHYYJun 9, 2025 |
| AWS New Albany campus | Amazon Web Services | Licking County, OH | - | operating | DCDDec 2024 |
| AWS Project Atlas (Madison County) | Amazon Web Services | Madison County, MS | - | under construction | DCDNov 2025 |
| AWS Richmond County campus | Amazon Web Services | Richmond County, NC | - | under construction | Connect CREJun 2025 |
| AWS Vicksburg campus | Amazon Web Services | Warren County, MS | - | announced | Mississippi Public BroadcastingNov 2025 |
| Beale Infrastructure De Soto campus (Project Pilot) | Beale Infrastructure | Johnson County, KS | - | under construction | Kansas City Star via GovTechJul 9, 2026 |
| Core Scientific DaltonUsers: CoreWeave, AMD-backed neocloud | Core Scientific | Whitfield County, GA | - | operating | Core ScientificJul 28, 2026 |
| Core Scientific MuskogeeUsers: CoreWeave, AMD | Core Scientific | Muskogee County, OK | - | operating | Core ScientificNov 18, 2024 |
| CRG Festus hyperscale campus | CRG (Clayco) | Jefferson County, MO | - | announced | St. Louis Public RadioApr 8, 2026 |
| Devlin Tech ParkUsers: Amazon Web Services | Amazon Data Services (bought the site from Stanley Martin) | Prince William County, VA | - | announced | Northern Virginia MagazineNov 4, 2025 |
| Digital Realty Digital Dulles campusUsers: Unnamed investment-grade hyperscale tenants | Digital Realty | Loudoun County, VA | - | operating | Global Data Center HubJul 6, 2026 |
| Google Armstrong County campusUsers: Google | Armstrong County, TX | - | under construction | BloombergNov 14, 2025 | |
| Google Berkeley County data center campus (Mount Holly Commerce Park) | Berkeley County, SC | - | operating | ABC News 4 (WCIV)Oct 13, 2025 | |
| Google Cedar RapidsUsers: Google | Linn County, IA | - | under construction | GoogleMay 30, 2025 | |
| Google Chesterfield data center campus (Project Peanut, Bermuda Hundred Road)Users: Google | Chesterfield County, VA | - | under construction | VPMOct 1, 2026 | |
| Google Columbus (South High Street)Users: Google | Franklin County, OH | - | operating | AP via ABC NewsJun 2024 | |
| Google Council BluffsUsers: Google | Pottawattamie County, IA | - | operating | DCDJun 2025 | |
| Google Dorchester County data center campuses (Ridgeville and St. George) | Dorchester County, SC | - | under construction | GoogleOct 2026 | |
| Google Fort Wayne (Project Zodiac)Users: Google | Allen County, IN | - | under construction | Indiana Economic Development CorporationApr 26, 2024 | |
| Google Haskell County campusesUsers: Google | Haskell County, TX | - | announcedGrid + on-site power | AP via KSATNov 15, 2025 | |
| Google Hermantown data center campus | Google (Mortenson development partner) | St. Louis County, MN | - | announced | MPR NewsJun 25, 2026 |
| Google Kansas City Northland (Project Mica)Users: Google | Clay County, MO | - | announced | Kansas City Star via YahooFeb 14, 2026 | |
| Google LancasterUsers: Google | Fairfield County, OH | - | operating | AP via ABC NewsJun 2024 | |
| Google Lincoln data center campus | Lancaster County, NE | - | under construction | GoogleOct 2026 | |
| Google New AlbanyUsers: Google | Licking County, OH | - | operating | AP via ABC NewsJun 2024 | |
| Google Papillion data center campus | Sarpy County, NE | - | operating | GoogleOct 2026 | |
| Google Pryor (MidAmerica Industrial Park)Users: Google | Mayes County, OK | - | operating | The Oklahoman via YahooAug 2025 | |
| Google StillwaterUsers: Google | Payne County, OK | - | under construction | DCDMar 2025 | |
| Google Storey County data center (Tahoe-Reno Industrial Center) | Storey County, NV | - | operating | GoogleOct 2026 | |
| Google The Dalles data center campus | Wasco County, OR | - | operating | Columbia Community ConnectionAug 4, 2026 | |
| Google West MemphisUsers: Google | Crittenden County, AR | - | under construction | GoogleOct 2, 2025 | |
| GW Ranch (Amazon campus)Users: Amazon | Amazon / Pacifico Energy | Pecos County, TX | - | announcedOn-site power | DCDJan 2026 |
| Joule High Performance Compute Campus | Joule Capital Partners | Millard County, UT | - | announcedOn-site power | ENRAug 2025 |
| Meta Aiken County data center (Sage Mill Industrial Park) | Meta | Aiken County, SC | - | under construction | MetaOct 2026 |
| Meta Beaver DamUsers: Meta | Meta | Dodge County, WI | - | under construction | DCDNov 12, 2025 |
| Meta Bowling GreenUsers: Meta | Meta | Wood County, OH | - | under construction | JobsOhioApr 9, 2025 |
| Meta DeKalb data center campus | Meta | DeKalb County, IL | - | operating | Office of the Governor of IllinoisNov 29, 2023 |
| Meta Gallatin (tent expansion)Users: Meta | Meta | Sumner County, TN | - | under construction | DCDOct 2025 |
| Meta Henrico Data Center (White Oak Technology Park)Users: Meta | Meta | Henrico County, VA | - | operating | Richmond BizSenseNov 28, 2022 |
| Meta Prineville data center campus | Meta | Crook County, OR | - | operating | MetaOct 2026 |
| Meta Rosemount data center (UMore Park) | Meta | Dakota County, MN | - | under construction | Epoch AIJul 28, 2026 |
| Meta Sarpy data center campus | Meta | Sarpy County, NE | - | operating | WOWTJul 28, 2022 |
| Microsoft Fairwater (Mount Pleasant)Users: Microsoft, OpenAI | Microsoft | Racine County, WI | - | operating | MicrosoftSep 18, 2025 |
| Microsoft Fairwater AtlantaUsers: Microsoft, OpenAI | Microsoft (QTS campus) | Fayette County, GA | - | operating | Atlanta Journal-ConstitutionNov 2025 |
| Microsoft Malaga data center campus | Microsoft | Chelan County, WA | - | under construction | KPQJun 15, 2023 |
| Microsoft Mecklenburg County data center campuses (Boydton, South Hill, ClarksviUsers: Microsoft | Microsoft | Mecklenburg County, VA | - | operating | SoVaNOW (The News & Record / Mecklenburg Sun)Dec 31, 2025 |
| Microsoft Quincy data center campus | Microsoft | Grant County, WA | - | operating | Columbia Basin Herald (Source ONE)Jan 13, 2026 |
| Project Jupiter (Stargate Dona Ana County)Users: Oracle, OpenAI | STACK Infrastructure / BorderPlex Digital Assets | Doña Ana County, NM | - | under constructionOn-site power | DCDOct 2025 |
| Project Skyway (Google Pine Island data center)Users: Google | Ryan Companies for Google | Goodhue County, MN | - | announced | Blandin on BroadbandJul 25, 2026 |
| QTS Cedar Rapids (Big Cedar Industrial Center) | QTS | Linn County, IA | - | under construction | DCDAug 2025 |
| QTS Eagle MountainUsers: Meta (reported) | QTS | Utah County, UT | - | under construction | Epoch AIOct 2026 |
| QTS Richmond campus (White Oak Technology Park) and RIC4/RIC5 expansion | QTS Data Centers | Henrico County, VA | - | operating | Richmond BizSenseMay 18, 2026 |
| Sabey Intergate.Quincy campus | Sabey Data Centers | Grant County, WA | - | operating | Trade and Industry DevelopmentJun 16, 2023 |
| Stargate Lordstown (former Foxconn plant)Users: OpenAI | SoftBank / Foxconn | Trumbull County, OH | - | under construction | OpenAISep 23, 2025 |
| xAI Colossus 2 (Tulane Road)Users: xAI, Anthropic, Google | xAI (SpaceX) | Shelby County, TN | - | operatingOn-site power | SemiAnalysisSep 2025 |
| xAI MACROHARDRR (Southaven)Users: xAI | xAI (SpaceX) | DeSoto County, MS | - | under constructionOn-site power | DCDJan 2026 |
Interconnection queues and large-load requests
A queue is the line of requests waiting for the grid operator to study a connection. Generation queues show where new supply and grid upgrades are coming; large-load requests show the competition for them. Active requests only, as each ISO publishes them (see the glossary entry).
| ISO / RTO | Active requests | MW | Agreement signed | Largest types | Queue file |
|---|---|---|---|---|---|
| ERCOT (Texas)Large loads: see below | 1,680 | 439 GW | 140 GW | Storage 36%, Solar 34%, Gas 18% | Oct 1, 2026 |
| PJM (Mid-Atlantic and Midwest)Large loads: see below | 2,788 | 328 GW | 24 GW | Solar 45%, Storage 22%, Wind 18% | Oct 18, 2026 |
| MISO (Midwest and South) | 1,108 | 256 GW | 11 GW | Other or not stated 28%, Solar 25%, Storage 17% | Oct 18, 2026 |
| SPP (Plains) | 680 | 140 GW | 64 GW | Gas 25%, Storage 22%, Solar 21% | Oct 15, 2026 |
| CAISO (California) | 261 | 74 GW | 59 GW | Solar or wind + storage 62%, Storage 33%, Wind 4% | Oct 18, 2026 |
| NYISO (New York) | 220 | 36 GW | 10 GW | Storage 49%, Wind 20%, Solar 17% | Oct 18, 2026 |
| ISO New England | 50 | 11 GW | n/a | Storage 52%, Wind 37%, Solar 10% | Oct 18, 2026 |
- ERCOT. As of June 2026, ERCOT was tracking about 474.7 GW of large loads seeking interconnection through 2033; ERCOT counts 420.8 GW of the requests as data centers (90.2% in its project-type breakdown). 5.9 GW was energized and 3.2 GW approved to energize but not yet operating; 36.0 GW had met the study requirements, 135.5 GW was under ERCOT review and 284.3 GW had not submitted studies. In September 2026 ERCOT conditionally placed 66.4 GW in its Batch Zero study as base load and 127.9 GW as studied load, and has paused energizing new large data centers pending the audit Gov. Abbott ordered on August 3. ERCOT, Jul 29, 2026
- PJM. PJM forecasts its summer peak at 222,106 MW in 2036, up 65,733 MW in ten years, with large load adjustments for data center growth in 14 transmission zones, including Dominion (Virginia), AEP, ComEd and PECO. Near-term adjustments now require firm commitments, so they came down from the 2025 forecast. PJM, Jan 14, 2026
- NYISO. The only ISO queue that lists large loads by county: 53 active load requests totaling 14 GW, many of them data centers and crypto mining. They are counted county by county in the explorer.
Top points of interconnection by queued MW
The substations and lines with the most active generation and storage requests: where developers expect the grid to take new supply, and where co-located load has the most to plug into.
| # | Point of interconnection | County | ISO | Requests | Queued MW | Mostly |
|---|---|---|---|---|---|---|
| 1 | Larrabee 230 kV | Monmouth County, NJ | PJM | 3 | 5,650 | Wind |
| 2 | Marysville-Flatlick 765 kV | Madison County, OH | PJM | 11 | 5,200 | Solar |
| 3 | Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B | Wilbarger County, TX | ERCOT | 5 | 4,749 | Gas |
| 4 | #3308 Pin Oak 345KV | Anderson County, TX | ERCOT | 3 | 3,789 | Gas |
| 5 | Nelson-Electric Junction 345 kV | Lee County, IL | PJM | 11 | 3,200 | Storage |
| 6 | Delaney-Colorado River 500 kV Line | La Paz County, AZ | CAISO | 1 | 3,200 | Solar or wind + storage |
| 7 | 23908 Deaf Smith station 345 kV | Deaf Smith County, TX | ERCOT | 3 | 3,021 | Gas |
| 8 | Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit | Pecos County, TX | ERCOT | 3 | 3,009 | Gas |
| 9 | Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line | Pecos County, TX | ERCOT | 3 | 3,008 | Gas |
| 10 | Tap 345 kV (Bus #1048) Tonkawa Switch – (Bus #11050) Dusty Road | Fisher County, TX | ERCOT | 1 | 3,000 | Gas |
| 11 | Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02 | Mitchell County, TX | ERCOT | 3 | 2,890 | Storage |
| 12 | #60404 Solstice Substation 345 kV | Reeves County, TX | ERCOT | 4 | 2,707 | Gas |
| 13 | Deans 500 kV | Middlesex County, NJ | PJM | 2 | 2,610 | Wind |
| 14 | Tap Double circuit line between Jacksbro_5 (1429) to Willowck_5 (1421) and Jacks | Jack County, TX | ERCOT | 2 | 2,546 | Gas |
| 15 | Indian River 230kV | Sussex County, DE | PJM | 3 | 2,513 | Wind |
| 16 | Oceana 230 kV | Chesapeake city, VA | PJM | 3 | 2,489 | Wind |
| 17 | Tap 345kV 80286 DULCE7A - 8676 STATIC7A | Victoria County, TX | ERCOT | 3 | 2,430 | Nuclear |
| 18 | Byron - Wayne 345 kV | Ogle County, IL | PJM | 6 | 2,400 | Storage |
| 19 | Nelson-Electric Junction 345kV | Lee County, IL | PJM | 2 | 2,400 | Storage |
| 20 | Moss Landing 500 kV | Monterey County, CA | CAISO | 2 | 2,250 | Solar or wind + storage |
| 21 | SIOUX | St. Charles County, MO | MISO | 1 | 2,220 | Gas |
| 22 | Larrabee Collector Station 230 kV | Atlantic County, NJ | PJM | 1 | 2,139 | Wind |
| 23 | Belmont-Flint Run 500 kV | Doddridge County, WV | PJM | 1 | 2,100 | Gas |
| 24 | Trout Canyon Substation 230 kV | Clark County, NV | CAISO | 6 | 2,050 | Solar or wind + storage |
| 25 | 345kV 7042 Zorn Substation | Guadalupe County, TX | ERCOT | 5 | 2,000 | Gas |
Industrial power prices by state
Average price to industrial customers, July 2026 YTD, against the same months a year earlier (EIA Electric Power Monthly, Table 5.6.B). A large load's own rate depends on its utility tariff or contract.
| # | State | Industrial, ¢/kWh | A year earlier | Change |
|---|---|---|---|---|
| 1 | New Mexico | 5.21 | 6.02 | -13% |
| 2 | Louisiana | 6.65 | 6.38 | +4% |
| 3 | Oklahoma | 6.69 | 6.01 | +11% |
| 4 | Texas | 6.72 | 6.47 | +4% |
| 5 | Arkansas | 6.82 | 6.63 | +3% |
| 6 | Tennessee | 6.82 | 6.86 | -1% |
| 7 | Montana | 6.83 | 7.04 | -3% |
| 8 | Washington | 7.15 | 6.83 | +5% |
| 9 | Iowa | 7.38 | 7.06 | +5% |
| 10 | Kentucky | 7.50 | 7.00 | +7% |
| 11 | Arizona | 7.66 | 8.22 | -7% |
| 12 | Mississippi | 7.66 | 7.33 | +5% |
| 13 | South Carolina | 7.85 | 7.13 | +10% |
| 14 | North Carolina | 7.91 | 7.80 | +1% |
| 15 | Alabama | 7.93 | 7.76 | +2% |
| 16 | Georgia | 7.99 | 8.16 | -2% |
| 17 | Idaho | 8.14 | 8.07 | +1% |
| 18 | North Dakota | 8.18 | 7.48 | +9% |
| 19 | Kansas | 8.30 | 7.94 | +5% |
| 20 | Oregon | 8.33 | 8.26 | +1% |
| 21 | Nevada | 8.43 | 7.77 | +8% |
| 22 | West Virginia | 8.55 | 8.08 | +6% |
| 23 | Utah | 8.58 | 8.23 | +4% |
| 24 | Missouri | 8.62 | 8.29 | +4% |
| 25 | Nebraska | 8.65 | 8.15 | +6% |
| 26 | Wyoming | 8.78 | 8.67 | +1% |
| 27 | Indiana | 9.15 | 8.77 | +4% |
| 28 | Florida | 9.21 | 8.77 | +5% |
| 29 | Michigan | 9.33 | 8.65 | +8% |
| 30 | Wisconsin | 9.39 | 8.89 | +6% |
| 31 | South Dakota | 9.46 | 8.67 | +9% |
| 32 | Colorado | 9.60 | 8.96 | +7% |
| 33 | Minnesota | 9.75 | 9.25 | +5% |
| 34 | Virginia | 10.08 | 9.26 | +9% |
| 35 | Illinois | 10.24 | 9.96 | +3% |
| 36 | New York | 10.24 | 9.57 | +7% |
| 37 | Ohio | 10.32 | 8.16 | +26% |
| 38 | Pennsylvania | 10.93 | 9.04 | +21% |
| 39 | Delaware | 11.73 | 9.68 | +21% |
| 40 | Vermont | 12.93 | 12.26 | +5% |
| 41 | New Jersey | 15.18 | 13.70 | +11% |
| 42 | Maryland | 15.28 | 12.26 | +25% |
| 43 | Maine | 15.61 | 15.12 | +3% |
| 44 | New Hampshire | 18.21 | 16.89 | +8% |
| 45 | Connecticut | 18.50 | 19.15 | -3% |
| 46 | Massachusetts | 19.99 | 19.53 | +2% |
| 47 | California | 20.74 | 20.76 | 0% |
| 48 | District of Columbia | 20.98 | 14.74 | +42% |
| 49 | Rhode Island | 21.86 | 22.00 | -1% |
| 50 | Alaska | 24.02 | 19.99 | +20% |
| 51 | Hawaii | 37.59 | 31.63 | +19% |
State data center sales tax exemptions
Sales and use tax exemptions for data center equipment, as published by each state, with the main thresholds. General information only, not tax advice: programs change often and qualifying is case by case, so ask your tax advisor.
| State | Status | Program | Min. investment | Min. jobs | Electricity | Source |
|---|---|---|---|---|---|---|
| Alabama | In force | Alabama data processing center tax abatement (Code of Ala. 40-9B-3, 40-9B-4, 40-9B-4.1, as amended by 2026 HB 399) | - | 20 | No | Alabama Legislature |
| Arkansas | In force | Arkansas data center sales and use tax exemption (Ark. Code 26-52-456) | $100M | - | Exempt | Arkansas General Assembly |
| Connecticut | In force | Connecticut qualified data center tax incentive agreements (CGS 32-286, P.A. 21-1) | $50M | - | Exempt | Connecticut General Assembly |
| Florida | In force | Florida data center property exemption (Fla. Stat. 212.08(5)(r)) | $150M | - | Exempt | The Florida Senate |
| Georgia | In force | Georgia high-technology data center equipment sales and use tax exemption (O.C.G.A. 48-8-3(68.1)) | $25M | 5 | No | Office of the Governor of Georgia |
| Idaho | In force | Idaho information technology equipment exemption (Idaho Code 63-3622VV) | $250M | 30 | No | Idaho Legislature |
| Indiana | In force | Indiana data center sales tax exemption (IC 6-2.5-15) | $25M | - | Exempt | Indiana Economic Development Corporation |
| Iowa | In force | Iowa data center sales and use tax exemption (Iowa Code 423.3(95)), with partial refunds for smaller data centers (Iowa Code 423.4(7) and (8)) | $200M | - | Exempt | Iowa Department of Revenue |
| Kansas | In force | Kansas SB 98 data center sales tax exemption (K.S.A. 79-3606, as amended by 2025 SB 98) | $250M | 20 | No | Kansas Legislature |
| Kentucky | In force | Kentucky qualified data center project sales and use tax exemption (KRS 139.499; KRS 154.20-220 to 154.20-229) | $25M | - | No | Kentucky General Assembly |
| Louisiana | In force | Louisiana data center sales and use tax exemption (R.S. 47:305.73, as amended by Act 730 of 2024), administered by Louisiana Economic Development | $200M | 50 | No | Louisiana Legislature |
| Maryland | In force | Maryland qualified data center sales and use tax exemption (Tax-General § 11-239) | $2M | 5 | No | Maryland General Assembly |
| Michigan | In force | Michigan enterprise data center sales and use tax exemption (MCL 205.54ee and 205.94cc; 2024 PA 207 and PA 181) | $250M | 30 | No | Michigan Strategic Fund / MEDC |
| Minnesota | In force | Minnesota qualified data center sales tax exemption (Minn. Stat. § 297A.68, subd. 42) | $30M | - | No | Minnesota Office of the Revisor of Statutes |
| Mississippi | In force | Mississippi data center tax exemption (Miss. Code §§ 57-113-21 to 57-113-27; electricity under § 27-65-107) | $20M | 20 | Exempt | Mississippi Legislature |
| Missouri | In force | Missouri data storage center sales and use tax exemption (RSMo § 144.810) | $25M | 10 | Exempt | Missouri Revisor of Statutes |
| New York | In force | New York internet data center sales and use tax exemption (Tax Law § 1115(a)(37)) | - | - | No | New York State Senate |
| North Carolina | In force | North Carolina qualifying datacenter exemption (G.S. 105-164.13(55a); definition G.S. 105-164.3(201)) | $75M | - | No | North Carolina Department of Revenue |
| North Dakota | In force | North Dakota qualified data center sales and use tax exemption (N.D.C.C. § 57-39.2-04.17) | - | - | No | North Dakota Legislative Branch |
| Oklahoma | In force | Oklahoma computer services and data processing sales tax exemption (68 O.S. § 1357(21)) | - | - | No | Oklahoma Department of Commerce |
| Pennsylvania | In force | Pennsylvania Computer Data Center Equipment Exemption Program (Act 84 of 2016, as amended by Act 25 of 2021), administered by the Department of Revenue | $75M | 25 | No | Pennsylvania Department of Revenue |
| South Carolina | In force | South Carolina datacenter sales and use tax exemption (S.C. Code 12-36-2120(79)) | $50M | 25 | Exempt | South Carolina General Assembly |
| Tennessee | In force | Tennessee qualified data center sales and use tax exemption (Tenn. Code Ann. 67-6-206) | $100M | 15 | Exempt | Tennessee Department of Revenue |
| Texas | In force | Texas qualifying data center sales and use tax exemption (Tax Code 151.359; large data center projects under 151.3595) | $200M | 20 | Exempt | Texas Comptroller of Public Accounts |
| Utah | In force | Utah qualifying data center sales and use tax exemption (Utah Code 59-12-104(84)) | - | - | No | Utah State Legislature |
| Virginia | In force | Virginia data center equipment sales and use tax exemption (Va. Code 58.1-609.3(18)) | $70M | 10 | No | Virginia General Assembly (Legislative Information System) |
| Washington | In force | Washington computer data center sales and use tax exemptions: rural counties (RCW 82.08.986 and 82.12.986) and counties over 800,000 people (RCW 82.08.9861 and 82.12.9861) | - | 3 | No | Washington State Legislature |
| Wisconsin | In force | Wisconsin qualified data center sales and use tax exemption (Wis. Stat. 77.54(70), 2023 Wis. Act 19) | $50M | - | Exempt | Wisconsin Department of Revenue |
| Wyoming | In force | Wyoming data processing services center sales and use tax exemption (Wyo. Stat. 39-15-105(a)(viii)(S)) | $5M | - | No | Wyoming Legislature |
| Nevada | Partial | Nevada data center partial tax abatement (NRS 360.754), administered by the Governor's Office of Economic Development | $25M | 10 | - | Nevada Legislature |
| Arizona | Paused | Arizona computer data center tax relief program (A.R.S. 41-1519; TPT and use tax deductions under 42-5061, 42-5075, 42-5159, 42-6004) | $25M | - | No | Arizona Legislature |
| Illinois | Paused | Illinois Data Center Investment Program (20 ILCS 605/605-1025) | $250M | 20 | No | Illinois Department of Commerce and Economic Opportunity |
| Massachusetts | Paused | Massachusetts qualified data center sales and use tax exemption (M.G.L. c. 64H, s. 6(zz); c. 23A, s. 70; 400 CMR 9.00) | $50M | 100 | Exempt | Massachusetts Legislature |
| Ohio | Paused | Ohio data center sales and use tax exemption (ORC 122.175), granted by the Tax Credit Authority | $100M | - | No | Ohio Legislative Service Commission |
| Nebraska | Repealed | Nebraska data center sales and use tax exemption (Neb. Rev. Stat. § 77-2704.62), repealed | - | - | - | Nebraska Legislature |
| Alaska | None | - | - | - | - | - |
| California | None | - | - | - | - | Ryan |
| Colorado | None | - | - | - | - | Colorado General Assembly |
| Delaware | None | - | - | - | - | Delaware Division of Revenue |
| District of Columbia | None | - | - | - | - | - |
| Hawaii | None | - | - | - | - | - |
| Maine | None | - | - | - | - | Maine Legislature |
| Montana | None | - | - | - | - | Montana Department of Revenue |
| New Hampshire | None | - | - | - | - | New Hampshire Department of Revenue Administration |
| New Jersey | None | - | - | - | - | New Jersey Economic Development Authority |
| New Mexico | None | - | - | - | - | New Mexico Taxation and Revenue Department |
| Oregon | None | - | - | - | - | Oregon Department of Revenue |
| Rhode Island | None | - | - | - | - | Rhode Island Division of Taxation |
| South Dakota | None | - | - | - | - | KTIV |
| Vermont | None | - | - | - | - | Vermont General Assembly |
| West Virginia | None | - | - | - | - | West Virginia Legislature |
By state
- AlabamaJefferson 64
- AlaskaAnchorage Municipality 25
- ArizonaMaricopa 85
- ArkansasMississippi 75
- CaliforniaLos Angeles 72
- ColoradoWeld 64
- ConnecticutCapitol Planning Region 49
- DelawareNew Castle 54
- District of ColumbiaDistrict of Columbia 22
- FloridaMiami-Dade 72
- GeorgiaCoweta 68
- HawaiiHonolulu 21
- IdahoAda 60
- IllinoisWill 78
- IndianaSullivan 76
- IowaLinn 71
- KansasJohnson 73
- KentuckyJefferson 72
- LouisianaSt. Charles 83
- MaineCumberland 39
- MarylandPrince George's 65
- MassachusettsMiddlesex 55
- MichiganMonroe 78
- MinnesotaSherburne 66
- MississippiDeSoto 67
- MissouriSt. Charles 70
- MontanaYellowstone 50
- NebraskaLancaster 65
- NevadaClark 89
- New HampshireRockingham 38
- New JerseyMiddlesex 64
- New MexicoSan Juan 72
- New YorkKings 78
- North CarolinaMecklenburg 72
- North DakotaMercer 68
- OhioFranklin 63
- OklahomaOklahoma 82
- OregonMorrow 74
- PennsylvaniaIndiana 80
- Rhode IslandProvidence 27
- South CarolinaBerkeley 66
- South DakotaBrookings 46
- TennesseeShelby 75
- TexasBexar 94
- UtahMillard 80
- VermontAddison 29
- VirginiaChesterfield 79
- WashingtonGrant 84
- West VirginiaGrant 61
- WisconsinMilwaukee 72
- WyomingCarbon 74
Methodology and sources
The site score adds six capped parts to a number out of 100. It ranks counties to look at first; it is not a site appraisal, says nothing about a given parcel, and only the utility's load study can say how much power a site can take and when.
- Transmission (25 points). Highest substation voltage in the county (500 kV and up 15 points, 345 kV 12, 230 kV 8, 115-161 kV 4), plus 2 points per substation at 230 kV or more, up to 10. Substations are inferred from where HIFLD transmission lines end: ends within 500 m are merged, and a point counts where three or more lines meet or the line records name it.
- Generation pipeline (20 points). New generation and storage seeking to connect in the county: active ISO queue requests, or EIA-860M planned generators where that is larger (the only pipeline data outside the seven ISOs). Up to 15 points on a square-root scale reaching full marks at 5 GW, plus up to 5 for MW with a signed interconnection agreement or under construction (full at 1 GW). New supply nearby is where co-location and grid upgrades happen.
- Industrial power price (20 points). The state’s average industrial electricity price, year to date (EIA). The cheapest states score 20, the most expensive 0, in a straight line between the 5th and 95th percentile of states.
- Existing and retiring plants (15 points). Operating generation in the county, up to 9 points (full at 2 GW, square root), plus up to 6 for plants retired in the last five years or scheduled to retire in the next five (full at 1 GW): their interconnection and land can be reused.
- Sales tax exemption (10 points). 10 points where a data center program in force removes the state’s own sales and use tax on data center equipment in full (local taxes may still apply, as in Texas); 5 where it removes only part of the state tax: an abatement down to a reduced rate (Nevada’s, to 2%), an abatement of part of the tax, or a refund of part of it; 4 where a program is pending or paused; 0 otherwise. A state is scored on its main program, not on smaller partial tiers.
- Data center activity (10 points). GPU-ready colocation facilities (1 point each), bitcoin mining sites (3 each) and announced AI campuses (4 each), up to 10. Also a proxy for fiber, which has no free county-level dataset.
Counties are placed by the county each source names, and anything with coordinates (transmission line ends, and power plants in Connecticut, whose sources still name the counties it replaced with planning regions in 2022) by the 2024 Census county shapes; colocation facilities and mining sites, which are listed by city, are placed by the Census location of the city. Requests a queue lists without a county count toward the state and ISO totals only. Power prices are state averages (EIA, July 2026 YTD): what a large load pays depends on its utility tariff or contract.
Sources
- ERCOT Generator Interconnection Status (GIS) report (ERCOT, Oct 1, 2026). GIS_Report_September2026; large generators with a full interconnection study requested (ERCOT does not publish earlier-stage requests).
- PJM New Services Queue (PlanningQueues.xml) (PJM, Oct 18, 2026). Active, confirmed, suspended and under-construction generation requests.
- MISO Generator Interconnection Queue (MISO, Oct 18, 2026). Active requests and signed agreements not yet in service. Expedited (ERAS) requests often omit the county and are counted at state level only.
- SPP Generation Interconnection active queue (SPP, Oct 15, 2026). Active requests; projects already in commercial operation excluded.
- CAISO Public Queue Report (California ISO, Oct 18, 2026). Active generation requests.
- NYISO Interconnection Queue (NYISO, Oct 18, 2026). Active generation, storage and cluster requests, plus large-load requests (the only ISO queue here that publishes loads by county).
- ISO-NE Interconnection Request Queue (IRTT) (ISO New England, Oct 18, 2026). Active generation requests. The public table does not show agreement status, so none are counted as signed.
- EIA-860M Preliminary Monthly Electric Generator Inventory (U.S. EIA, Aug 2026). August 2026 inventory: operating, planned and retired generators by county and balancing authority.
- HIFLD Electric Power Transmission Lines (U.S. DHS HIFLD (open data), Sep 5, 2023). Lines of 100 kV and up. HIFLD no longer publishes substations openly, so substations here are inferred from line ends: ends within 500 m are merged, and a point counts where three or more lines meet or the lines’ SUB_1/SUB_2 fields name it. Unnamed ends of one or two lines (segment breaks, taps) are not counted.
- American Compute GPU colocation facility list (American Compute, Oct 10, 2026). 837 US facilities marketed for GPU workloads, each sourced to the operator or trade press.
- American Compute bitcoin miner AI conversion tracker (American Compute, Oct 9, 2026). Named mining sites of listed and private miners, with their AI/HPC conversion status.
- EIA Electric Power Monthly, Table 5.6.B (and 5.6.A) (U.S. EIA, Oct 18, 2026). Average industrial price to ultimate customers, cents per kWh, July 2026 YTD.
- Announced US AI data center campuses (American Compute compilation) (American Compute, Oct 18, 2026). Compiled from company releases, SEC filings and trade press; each campus links its source.
- State data center sales and use tax exemptions (American Compute compilation) (American Compute, Oct 18, 2026). From state statutes and revenue departments; each state links its source.
- Census Gazetteer files (2024) and cartographic boundary county shapes (2024, 1:5,000,000) (U.S. Census Bureau, 2024). County names, land area and internal points; county shapes for placing line ends, plants, colos and mining sites; city locations for colos and mining sites.
Related
Cite this
Suggested citation
American Compute, Data Center Site Finder, October 2026, https://www.amcompute.com/data-center-site-finder
Free to use with attribution.
Discuss a transaction
Funding a data center or the GPUs going into one? Tell us about the site and the capital you need, and we will come back with the lenders and the structure that fit. Operators raising debt for a cluster can start at gpulenders.com.
Prefer email? hello@amcompute.com
Questions
- How do I find power for a data center?
- Start from the grid, not the land. Shortlist counties with transmission substations at 230 kV or more, generation being built nearby and a low industrial tariff, then ask the utility's large-load team for a load study at a specific substation: that study, not a map, says how many MW you can take and when. Sites with a history of big loads shorten the wait: retiring power plants (their interconnection can be reused), bitcoin mines converting to AI and powered shells. Where the grid can't deliver in time, on-site generation (behind-the-meter) is the fallback. The site finder scores all 2,895 counties on these signals.
- What is a data center interconnection queue?
- It is the line of requests waiting for a grid operator or utility to study and approve a connection. Generators and storage join the ISO queues (1,284 GW across 6,787 active requests in the seven ISO queues we read); large loads such as data centers go through a large-load process with the utility and, in Texas, ERCOT. ERCOT was tracking 474.7 GW of large-load requests as of June 30, 2026, about 90% of it data centers, with 5.9 GW energized. A queue position is not capacity: most requests never connect, and network upgrades set the date.
- Where are AI data centers being built in the US?
- Of the 138 announced, under-construction and operating AI campuses we track, the most are in Texas (27), Virginia (15), Ohio (9) and Pennsylvania (7). By announced MW, the largest concentrations are in Carson County, TX (11 GW), Box Elder County, UT (9 GW) and Pike County, OH (8 GW). The site finder lists every campus with its county, developer, MW, status and source.
- What is behind-the-meter power for data centers?
- Behind-the-meter means generation on or next to the site that feeds the data center directly rather than through the utility grid: gas turbines or engines, fuel cells, or a dedicated line from a power plant. It is used to energize before the grid can deliver. 29 of the 138 campuses we track report on-site or hybrid power. Lenders underwrite the fuel supply, air permits, uptime against the grid and what the plant is worth if the data center goes away.