AI data center sites in Arkansas

72 Arkansas counties scored on transmission, the interconnection queue, power price and tax. Updated October 18, 2026.

Open a county for its queue requests, substations, plants and data centers.

CountyScorePipelinePower price
752.3 GW6.8¢/kWh
69875 MW6.8¢/kWh
672 GW6.8¢/kWh
641.8 GW6.8¢/kWh
64870 MW6.8¢/kWh
61750 MW6.8¢/kWh
57950 MW6.8¢/kWh
57116 MW6.8¢/kWh
56-6.8¢/kWh
55788 MW6.8¢/kWh
54640 MW6.8¢/kWh
5480 MW6.8¢/kWh
53790 MW6.8¢/kWh
53255 MW6.8¢/kWh
52662 MW6.8¢/kWh
52120 MW6.8¢/kWh
511.9 GW6.8¢/kWh
50665 MW6.8¢/kWh
48-6.8¢/kWh
48-6.8¢/kWh
47-6.8¢/kWh
46680 MW6.8¢/kWh
45451 MW6.8¢/kWh
44515 MW6.8¢/kWh
44135 MW6.8¢/kWh
43901 MW6.8¢/kWh
42204 MW6.8¢/kWh
41200 MW6.8¢/kWh
41130 MW6.8¢/kWh
40750 MW6.8¢/kWh
40-6.8¢/kWh
39100 MW6.8¢/kWh
3975 MW6.8¢/kWh
39183 MW6.8¢/kWh
381.1 GW6.8¢/kWh
38300 MW6.8¢/kWh
38240 MW6.8¢/kWh
38100 MW6.8¢/kWh
38-6.8¢/kWh
37150 MW6.8¢/kWh
37150 MW6.8¢/kWh
36106 MW6.8¢/kWh
36-6.8¢/kWh
36-6.8¢/kWh
36-6.8¢/kWh
36-6.8¢/kWh
3518 MW6.8¢/kWh
355 MW6.8¢/kWh
35-6.8¢/kWh
35-6.8¢/kWh

Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.

What the data shows

The strongest Arkansas counties for a large AI load are Mississippi County (75), Hot Spring County (69) and Jefferson County (67) on the site score. Arkansas sits in MISO, SPP and utility territory; its ISO queues hold 21 GW of active generation and storage requests, 2.1 GW of them with a signed interconnection agreement, and it has 25 substations at 345 kV and up.

Industrial power averaged 6.8¢/kWh (EIA, July 2026 YTD), against 6.6¢/kWh a year earlier, the 5th lowest of the 50 states and DC. Arkansas has a data center sales and use tax exemption in force. We track 1 AI campus and 0 GPU-ready colocation facilities here.

Top 6 counties in detail

1. Mississippi CountyMISO

Site score 75 of 100

Transmission
21/25
Generation pipeline
15/20
Industrial power price
20/20
Existing and retiring plants
9/15
Sales tax exemption
10/10
Data center activity
0/10
Market
MISO
Queue (active)
1.7 GW
Agreement signed
0 MW
Planned plants (EIA)
2.3 GW
Top substation
500 kV
Substations 230 kV+
3
Operating plants
1.9 GW
Retired or retiring
0 MW
Industrial power, AR
6.8¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
DELL EHV - SAN SOUCI 500.0kVMISO J3401, in service 2028-09DELL EHV - SAN SOUCI 500.0kV500SolarIn study
Sandy BayouMISO J2696, in service 2027-04Sandy Bayou500SolarIn study
Dell - Manila 161 kVMISO S1164, in service 2028-08Dell - Manila 161 kV200Other or not statedIn study
BLYTHEVILLE I-55 - AECC BLYTHEVILLE NORTH 161.0kVMISO S1100, in service 2027-10BLYTHEVILLE I-55 - AECC BLYTHEVILLE NORTH 161.0kV200StorageIn study
MONETTE JUNCTION - PARAGOULD 161.0kVMISO J3619, in service 2028-09MONETTE JUNCTION - PARAGOULD 161.0kV150SolarIn study
Hybar 230kVMISO J4029, in service 2025-08Hybar 230kV85Solar or wind + storageIn study
AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kVMISO J2871, in service 2025-03AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV70Solar or wind + storageIn study

Substations, 115 kV and up

  • DELL · 11 lines500 kV
  • SANS SOUCI · 3 lines500 kV
  • PLUM POINT ENERGY STATION · 1 lines500 kV
  • DELL · 8 lines161 kV
  • Unnamed · 4 lines161 kV
  • Unnamed · 3 lines161 kV

Planned, retiring and retired plants

  • Steel River Solar Phase 1 · Solar, planned 2028750 MW
  • Steel River Solar Phase 2 · Solar, planned 2029750 MW
  • Steel River Solar Phase 3 · Solar, planned 2030750 MW

2. Hot Spring CountyMISO

Site score 69 of 100

Transmission
19/25
Generation pipeline
6/20
Industrial power price
20/20
Existing and retiring plants
14/15
Sales tax exemption
10/10
Data center activity
0/10
Market
MISO
Queue (active)
875 MW
Agreement signed
0 MW
Planned plants (EIA)
467 MW
Top substation
500 kV
Substations 230 kV+
2
Operating plants
2 GW
Retired or retiring
552 MW
Industrial power, AR
6.8¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
ETTAMISO J3829, in service 2028-12ETTA770GasIn study
DEGRAY DAM - H.S. EHV 115.0kVMISO J3081, in service 2026-09DEGRAY DAM - H.S. EHV 115.0kV105SolarIn study

Substations, 115 kV and up

  • Unnamed · 11 lines500 kV
  • HOT SPRING GENERATING FACILITY · 2 lines500 kV
  • LAKE CATHERINE · 8 lines115 kV
  • Unnamed · 3 lines115 kV
  • Unnamed · 3 lines115 kV
  • LAKE CATHERINE · 2 lines115 kV

Planned, retiring and retired plants

  • Lake Catherine · Gas, retiring 2027552 MW
  • Ironwood Power Station · Gas, planned 2028467 MW

3. Jefferson CountyMISO

Site score 67 of 100

Transmission
19/25
Generation pipeline
10/20
Industrial power price
20/20
Existing and retiring plants
9/15
Sales tax exemption
10/10
Data center activity
0/10
Market
MISO
Queue (active)
1.2 GW
Agreement signed
0 MW
Planned plants (EIA)
2 GW
Top substation
500 kV
Substations 230 kV+
2
Operating plants
2.1 GW
Retired or retiring
0 MW
Industrial power, AR
6.8¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Other_MISO J4082, in service 2030-06Other_500StorageIn study
White Bluff to Sheridan 500kVMISO J3030, in service 2027-06White Bluff to Sheridan 500kV450Solar or wind + storageIn study
STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kVMISO J2880, in service 2026-07STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV150Solar or wind + storageIn study
AECC PINEBERGEN - AECC GLENDALE 115.0kVMISO J2881, in service 2026-07AECC PINEBERGEN - AECC GLENDALE 115.0kV125SolarIn study

Substations, 115 kV and up

  • WHITE BLUFF · 7 lines500 kV
  • WOODWARD SUBSTATION · 14 lines230 kV
  • PINE BLUFF SOUTH · 4 lines115 kV
  • Unnamed · 3 lines115 kV
  • PINE BLUFF I.P SW STA · 3 lines115 kV
  • Unnamed · 3 lines115 kV
  • Unnamed · 3 lines115 kV
  • PINE BLUFF EAST · 3 lines115 kV

Planned, retiring and retired plants

  • Arkansas Cypress Solar Station · Solar, planned 2029950 MW
  • Jefferson Power Station · Gas, planned 2029820 MW
  • Lion Solar · Solar, planned 2029200 MW
  • Colonel Charles D. Maynard Project · Hydro, planned 203126 MW

4. Crittenden CountyMISO

Site score 64 of 100

Transmission
17/25
Generation pipeline
9/20
Industrial power price
20/20
Existing and retiring plants
4/15
Sales tax exemption
10/10
Data center activity
4/10
Market
MISO
Queue (active)
1.8 GW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
500 kV
Substations 230 kV+
1
Operating plants
360 MW
Retired or retiring
0 MW
Industrial power, AR
6.8¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
WEST MEMPHIS EHV - KEO EHV 500.0kVMISO J2477, in service 2026-10WEST MEMPHIS EHV - KEO EHV 500.0kV600SolarIn study
WEST MEMPHIS EHV - KEO EHV 500.0kVMISO J2482, in service 2026-10WEST MEMPHIS EHV - KEO EHV 500.0kV300SolarIn study
Marked Tree – Marion 161kV Tap at 35.3902, -90.3372MISO J3122, in service 2029-10Marked Tree – Marion 161kV Tap at 35.3902, -90.3372200Solar or wind + storageIn study
PARKIN - GILMORE 161.0kVMISO J3230, in service 2029-10PARKIN - GILMORE 161.0kV200Solar or wind + storageIn study
West Memphis EHVMISO J3090, in service 2025-10West Memphis EHV200SolarIn study
BOB WHITEMISO S1094, in service 2026-10BOB WHITE180StorageIn study
GILMORE - WILSON 161.0kVMISO J2734, in service 2025-12GILMORE - WILSON 161.0kV150Solar or wind + storageIn study

Substations, 115 kV and up

  • WEST MEMPHIS SUBSTATION · 5 lines500 kV
  • LEHI · 5 lines161 kV
  • LEHI · 4 lines161 kV
  • FLOYD "FROG" HUDSON STATION · 2 lines161 kV

Data centers, AI campuses and mining sites

  • Google West Memphis · AI campus, under construction · Google

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

5. Union CountyMISO

Site score 64 of 100

Transmission
19/25
Generation pipeline
6/20
Industrial power price
20/20
Existing and retiring plants
9/15
Sales tax exemption
10/10
Data center activity
0/10
Market
MISO
Queue (active)
870 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
500 kV
Substations 230 kV+
2
Operating plants
2.4 GW
Retired or retiring
0 MW
Industrial power, AR
6.8¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
White Bluff EHVMISO J3874, in service 2028-11White Bluff EHV770GasIn study
HUTTIG SS - STRONG SS 115.0kVMISO S1170, in service 2028-03HUTTIG SS - STRONG SS 115.0kV100StorageIn study

Substations, 115 kV and up

  • EL DORADO SUBSTATION · 11 lines500 kV
  • UNION POWER STATION · 2 lines500 kV
  • Unnamed · 4 lines115 kV
  • Unnamed · 3 lines115 kV
  • Unnamed · 3 lines115 kV
  • Unnamed · 3 lines115 kV
  • Unnamed · 3 lines115 kV
  • Unnamed · 3 lines115 kV

6. Independence CountyMISO

Site score 61 of 100

Transmission
17/25
Generation pipeline
6/20
Industrial power price
20/20
Existing and retiring plants
9/15
Sales tax exemption
10/10
Data center activity
0/10
Market
MISO
Queue (active)
750 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
500 kV
Substations 230 kV+
1
Operating plants
1.8 GW
Retired or retiring
0 MW
Industrial power, AR
6.8¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Independent - Holland Bottom 500kVMISO J2841, in service 2025-10Independent - Holland Bottom 500kV500WindIn study
INDEPENDENCE-ISESMISO J2523, in service 2026-11INDEPENDENCE-ISES250SolarIn study

Substations, 115 kV and up

  • INDEPENDENCE SUBSTATION · 8 lines500 kV
  • Unnamed · 3 lines161 kV
  • NEWARK · 2 lines161 kV
  • CEDAR GROVE · 2 lines161 kV
  • BATESVILLE · 2 lines161 kV

Data center tax exemption in Arkansas

Arkansas data center sales and use tax exemption (Ark. Code 26-52-456)

Data center equipment, eligible data center costs, related services, and electricity used by a certified qualified data center are exempt from state sales and use tax where the firm invests at least $100M within five years and pays at least $1M in aggregate annualized in-state compensation over the first two calendar years of operation (a qualified large data center across nonadjacent fiber-linked sites requires $2B within ten years and $3M in compensation); crypto-mining facilities are excluded, certification is by the Department of Finance and Administration after a positive AEDC cost-benefit analysis, and no sunset date is stated.

Recent change: Act 548 of 2025 (effective October 1, 2025) lowered the investment threshold from $500M to $100M, added the qualified large data center category, excluded crypto mining, and moved administration from AEDC to DFA; no 2026 fiscal session change found.

Source: Arkansas General Assembly, 2025-04-10. General information, not tax advice; ask your tax advisor.

AI data centers being built in Arkansas

CampusDeveloperCountyMWStatusSource
Google West MemphisUsers: GoogleGoogleCrittenden County-under constructionGoogleOct 2, 2025

Busiest points of interconnection in Arkansas

#Point of interconnectionCountyISORequestsQueued MWMostly
1INDEPENDENCE-ISES - POWERLINE ROAD 500.0kVJackson County, ARMISO21,250Solar
2SHERIDAN EHV - EL DORADO EHV 500.0kVCalhoun County, ARMISO31,060Solar

How the score works

Six parts out of 100: transmission (25), generation in the queue (20), the state's industrial power price (20), existing and retiring plants (15), sales tax exemption (10) and data center activity (10). The site finder's methodology prints each formula and every source with its date. Markets: MISO (Midwest and South), SPP (Plains), Utility territory (no ISO/RTO).