AI data center sites in Colorado
59 Colorado counties scored on transmission, the interconnection queue, power price and tax. Updated October 18, 2026.
Open a county for its queue requests, substations, plants and data centers.
| County | Score | Pipeline | Power price |
|---|---|---|---|
| 64 | 2.4 GW | 9.6¢/kWh | |
| 62 | 1.4 GW | 9.6¢/kWh | |
| 61 | 912 MW | 9.6¢/kWh | |
| 56 | 1.4 GW | 9.6¢/kWh | |
| 55 | 808 MW | 9.6¢/kWh | |
| 54 | 3 GW | 9.6¢/kWh | |
| 53 | 200 MW | 9.6¢/kWh | |
| 52 | 505 MW | 9.6¢/kWh | |
| 52 | - | 9.6¢/kWh | |
| 50 | 199 MW | 9.6¢/kWh | |
| 44 | 202 MW | 9.6¢/kWh | |
| 43 | 200 MW | 9.6¢/kWh | |
| 42 | - | 9.6¢/kWh | |
| 42 | - | 9.6¢/kWh | |
| 41 | 8 MW | 9.6¢/kWh | |
| 41 | - | 9.6¢/kWh | |
| 40 | 597 MW | 9.6¢/kWh | |
| 40 | 150 MW | 9.6¢/kWh | |
| 40 | - | 9.6¢/kWh | |
| 37 | - | 9.6¢/kWh | |
| 37 | - | 9.6¢/kWh | |
| 36 | 669 MW | 9.6¢/kWh | |
| 36 | 5 MW | 9.6¢/kWh | |
| 34 | 688 MW | 9.6¢/kWh | |
| 33 | - | 9.6¢/kWh | |
| 32 | 225 MW | 9.6¢/kWh | |
| 32 | - | 9.6¢/kWh | |
| 32 | - | 9.6¢/kWh | |
| 32 | 202 MW | 9.6¢/kWh | |
| 31 | - | 9.6¢/kWh | |
| 31 | - | 9.6¢/kWh | |
| 30 | - | 9.6¢/kWh | |
| 29 | - | 9.6¢/kWh | |
| 29 | - | 9.6¢/kWh | |
| 27 | - | 9.6¢/kWh | |
| 27 | - | 9.6¢/kWh | |
| 27 | - | 9.6¢/kWh | |
| 26 | - | 9.6¢/kWh | |
| 22 | - | 9.6¢/kWh | |
| 22 | - | 9.6¢/kWh | |
| 22 | - | 9.6¢/kWh | |
| 22 | 5 MW | 9.6¢/kWh | |
| 21 | - | 9.6¢/kWh | |
| 21 | - | 9.6¢/kWh | |
| 21 | - | 9.6¢/kWh | |
| 21 | - | 9.6¢/kWh | |
| 21 | - | 9.6¢/kWh | |
| 21 | - | 9.6¢/kWh | |
| 20 | 300 MW | 9.6¢/kWh | |
| 20 | - | 9.6¢/kWh |
Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.
What the data shows
The strongest Colorado counties for a large AI load are Weld County (64), Pueblo County (62) and El Paso County (61) on the site score. Colorado sits in utility territory; its ISO queues hold 12 GW of active generation and storage requests, 4.2 GW of them with a signed interconnection agreement, and it has 23 substations at 345 kV and up.
Industrial power averaged 9.6¢/kWh (EIA, July 2026 YTD), against 9.0¢/kWh a year earlier, the 32nd lowest of the 50 states and DC. Colorado has no data center-specific sales tax exemption. We track 1 AI campus and 27 GPU-ready colocation facilities here.
Top 6 counties in detail
1. Weld CountyUtility: Public Service Co. of Colorado (Xcel)
Site score 64 of 100
- Transmission
- 22/25
- Generation pipeline
- 15/20
- Industrial power price
- 16/20
- Existing and retiring plants
- 11/15
- Sales tax exemption
- 0/10
- Data center activity
- 0/10
- Market
- Utility: Public Service Co. of Colorado (Xcel)
- Queue (active)
- 2.4 GW
- Agreement signed
- 698 MW
- Planned plants (EIA)
- 914 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 14
- Operating plants
- 4.2 GW
- Retired or retiring
- 101 MW
- Industrial power, CO
- 9.6¢/kWh
- Sales tax exemption
- None
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| Ault - Laramie River Station 345 LineSPP GI-TC-2024-25, in service 2031-06 | Ault - Laramie River Station 345 Line | 350 | Wind | In study |
| Redtail 115 SubstationSPP GI-CS-2025-05 | Redtail 115 Substation | 300 | Solar | In study |
| Ault 345 stationSPP 2025-G1, in service 2028-01 | Ault 345 station | 250 | Solar or wind + storage | In study |
| Lloyd Sisson 115 SubstationSPP GI-TC-2024-28, in service 2031-06 | Lloyd Sisson 115 Substation | 222 | Solar | In study |
| Greenhouse 230 SubstationSPP GI-TC-2024-14, in service 2031-04 | Greenhouse 230 Substation | 206 | Solar | In study |
| West Sand Creek 230 Switching StationSPP GI-DISIS-2022-07, in service 2029-02 | West Sand Creek 230 Switching Station | 199 | Solar or wind + storage | Agreement signed |
| Keota 345 SubstationSPP GI-DISIS-2022-02, in service 2030-04 | Keota 345 Substation | 199 | Solar or wind + storage | Agreement signed |
| Henry Lake - Badger Creek 230 LineSPP GI-CS-2025-16 | Henry Lake - Badger Creek 230 Line | 150 | Solar or wind + storage | In study |
Substations, 115 kV and up
- AULT · 11 lines345 kV
- FORT LUPTON · 12 lines230 kV
- FORT ST VRAIN · 9 lines230 kV
- WELD · 8 lines230 kV
- DEADHEAD · 7 lines230 kV
- HENRY LAKE · 6 lines230 kV
- KEENESBURG · 5 lines230 kV
- ERIE · 4 lines230 kV
Planned, retiring and retired plants
- Fort St Vrain · Gas, planned 2027478 MW
- Spindle BESS · Storage, planned 2026199 MW
- Black Hollow Sun · Solar, planned 2026107 MW
- Fort Lupton · Gas, retiring 2028101 MW
- Weld Energy Storage · Storage, planned 2026100 MW
2. Pueblo CountyUtility: Public Service Co. of Colorado (Xcel)
Site score 62 of 100
- Transmission
- 18/25
- Generation pipeline
- 13/20
- Industrial power price
- 16/20
- Existing and retiring plants
- 15/15
- Sales tax exemption
- 0/10
- Data center activity
- 0/10
- Market
- Utility: Public Service Co. of Colorado (Xcel)
- Queue (active)
- 0 MW
- Agreement signed
- 0 MW
- Planned plants (EIA)
- 1.4 GW
- Top substation
- 345 kV
- Substations 230 kV+
- 3
- Operating plants
- 3.6 GW
- Retired or retiring
- 1.6 GW
- Industrial power, CO
- 9.6¢/kWh
- Sales tax exemption
- None
Substations, 115 kV and up
- COMANCHE · 13 lines345 kV
- BOONE · 6 lines230 kV
- PUEBLO · 3 lines230 kV
- READER · 5 lines138 kV
- Unnamed · 3 lines138 kV
- Unnamed · 3 lines138 kV
- Unnamed · 3 lines138 kV
- Unnamed · 3 lines138 kV
Planned, retiring and retired plants
- Comanche (CO) · Coal, retiring 20261.3 GW
- Mirasol Energy Center, LLC. · Solar, planned 2028400 MW
- Comanche (CO) · Coal, retired 2022382 MW
- Arroyo Solar · Solar, planned 2026335 MW
- Stagecoach LRE · Solar, planned 2029230 MW
- Turkey Creek Solar Project · Solar, planned 2027200 MW
- Thunder Wolf II, LLC · Solar, planned 2027200 MW
- Pueblo Airport Generating Station · Storage, planned 202750 MW
3. El Paso CountyUtility: WAPA Rocky Mountain
Site score 61 of 100
- Transmission
- 22/25
- Generation pipeline
- 8/20
- Industrial power price
- 16/20
- Existing and retiring plants
- 13/15
- Sales tax exemption
- 0/10
- Data center activity
- 2/10
- Market
- Utility: WAPA Rocky Mountain
- Queue (active)
- 912 MW
- Agreement signed
- 100 MW
- Planned plants (EIA)
- 580 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 8
- Operating plants
- 2 GW
- Retired or retiring
- 475 MW
- Industrial power, CO
- 9.6¢/kWh
- Sales tax exemption
- None
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| Horizon Substation 230SPP CSUT-2025-7, in service 2028-03 | Horizon Substation 230 | 412 | Gas | In study |
| Williams Creek Substation 230SPP CSU-2020-3, in service 2025-09 | Williams Creek Substation 230 | 200 | Solar or wind + storage | In study |
| Horizon Substation 230SPP CSUT-2025-8, in service 2028-01 | Horizon Substation 230 | 100 | Storage | Agreement signed |
| South Plant Substation 115 via 34.5 FeedersSPP CSUT-2025-6, in service 2027-12 | South Plant Substation 115 via 34.5 Feeders | 100 | Storage | In study |
| Nixon Substation 230SPP CSUT-2025-2, in service 2028-12 | Nixon Substation 230 | 100 | Solar | In study |
Substations, 115 kV and up
- MIDWAY · 13 lines345 kV
- FRONT RANGE · 8 lines230 kV
- COTTONWOOD · 7 lines230 kV
- FULLER · 6 lines230 kV
- FRONT RANGE · 6 lines230 kV
- FRONT RANGE · 4 lines230 kV
- FRONT RANGE · 4 lines230 kV
- DEADHEAD · 2 lines230 kV
Planned, retiring and retired plants
- Horizon · Gas, planned 2028480 MW
- South Plant (CO) · Gas, retired 2022207 MW
- Ray D Nixon · Coal, retiring 2029207 MW
- Drennan Energy Storage · Storage, planned 2028100 MW
- George Birdsall · Gas, retired 202561 MW
Data centers, AI campuses and mining sites
- Novva Data Centers Colorado Springs campus · GPU colocation, Colorado Springs, 40 MW
- QTS Data Centers Colorado Springs · GPU colocation, Colorado Springs, 14 MW
Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.
4. Lincoln CountyUtility: Public Service Co. of Colorado (Xcel)
Site score 56 of 100
- Transmission
- 22/25
- Generation pipeline
- 12/20
- Industrial power price
- 16/20
- Existing and retiring plants
- 6/15
- Sales tax exemption
- 0/10
- Data center activity
- 0/10
- Market
- Utility: Public Service Co. of Colorado (Xcel)
- Queue (active)
- 1.4 GW
- Agreement signed
- 500 MW
- Planned plants (EIA)
- 0 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 5
- Operating plants
- 1 GW
- Retired or retiring
- 0 MW
- Industrial power, CO
- 9.6¢/kWh
- Sales tax exemption
- None
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| Williams Creek Substation 230SPP CSUT-2025-1, in service 2027-12 | Williams Creek Substation 230 | 500 | Wind | In study |
| Big Sandy 230 SubstationSPP GI-TC-2024-20, in service 2030-09 | Big Sandy 230 Substation | 250 | Solar | In study |
| Duck Creek 230 Switching StationSPP GI-DISIS-2022-29, in service 2029-03 | Duck Creek 230 Switching Station | 200 | Wind | Agreement signed |
| Big Sandy 230 SubstationSPP GI-CS-2025-11 | Big Sandy 230 Substation | 199 | Wind | In study |
| Lincoln 230 SubstationSPP GI-TC-2024-02, in service 2030-08 | Lincoln 230 Substation | 150 | Solar or wind + storage | Agreement signed |
| Lincoln 230 SubstationSPP GI-TC-2024-01, in service 2030-08 | Lincoln 230 Substation | 150 | Solar or wind + storage | Agreement signed |
Substations, 115 kV and up
- LIMON WIND #1 · 2 lines345 kV
- LIMON WIND #2 · 2 lines345 kV
- BIG SANDY · 4 lines230 kV
- LINCOLN · 2 lines230 kV
- CEDAR POINT WIND · 1 lines230 kV
- LIMON · 2 lines115 kV
5. Morgan CountyUtility: Public Service Co. of Colorado (Xcel)
Site score 55 of 100
- Transmission
- 22/25
- Generation pipeline
- 9/20
- Industrial power price
- 16/20
- Existing and retiring plants
- 8/15
- Sales tax exemption
- 0/10
- Data center activity
- 0/10
- Market
- Utility: Public Service Co. of Colorado (Xcel)
- Queue (active)
- 600 MW
- Agreement signed
- 200 MW
- Planned plants (EIA)
- 808 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 5
- Operating plants
- 1.1 GW
- Retired or retiring
- 24 MW
- Industrial power, CO
- 9.6¢/kWh
- Sales tax exemption
- None
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| Story 230 SubstationSPP GI-TC-2024-30, in service 2028-03 | Story 230 Substation | 200 | Solar or wind + storage | Agreement signed |
| Story 230 SubstationSPP GI-CS-2025-20 | Story 230 Substation | 200 | Solar or wind + storage | In study |
| Story 230 SubstationSPP GI-CS-2025-19 | Story 230 Substation | 200 | Solar or wind + storage | In study |
Substations, 115 kV and up
- PAWNEE · 8 lines345 kV
- STORY · 6 lines345 kV
- STORY · 10 lines230 kV
- MISSLE SITE · 3 lines230 kV
- PAWNEE · 3 lines230 kV
- Unnamed · 4 lines115 kV
- HOYT · 3 lines115 kV
- Unnamed · 3 lines115 kV
Planned, retiring and retired plants
- Fortress 1 · Storage, planned 2028399 MW
- South Platte Storage · Storage, planned 2027250 MW
- South Platte Solar · Solar, planned 2027150 MW
- Brush Generation Facility · Gas, retired 202424 MW
6. Kit Carson CountyUtility: Public Service Co. of Colorado (Xcel)
Site score 54 of 100
- Transmission
- 14/25
- Generation pipeline
- 16/20
- Industrial power price
- 16/20
- Existing and retiring plants
- 8/15
- Sales tax exemption
- 0/10
- Data center activity
- 0/10
- Market
- Utility: Public Service Co. of Colorado (Xcel)
- Queue (active)
- 3 GW
- Agreement signed
- 929 MW
- Planned plants (EIA)
- 753 MW
- Top substation
- 230 kV
- Substations 230 kV+
- 3
- Operating plants
- 1.4 GW
- Retired or retiring
- 0 MW
- Industrial power, CO
- 9.6¢/kWh
- Sales tax exemption
- None
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| 230 Windtalker Switching StationSPP GI-CS-2025-03 | 230 Windtalker Switching Station | 300 | Solar or wind + storage | In study |
| Burlington-Wray 230 LineSPP GI-TC-2024-17, in service 2030-07 | Burlington-Wray 230 Line | 225 | Solar | Agreement signed |
| Big Sandy - Windtalker 230 LineSPP GI-CS-2025-24 | Big Sandy - Windtalker 230 Line | 225 | Wind | In study |
| Burlington 230 SubstationSPP GI-TC-2024-10, in service 2026-03 | Burlington 230 Substation | 199 | Solar | In study |
| Many Trails 230 Switching StationSPP GI-DISIS-2022-28, in service 2029-12 | Many Trails 230 Switching Station | 199 | Solar or wind + storage | Suspended |
| Windtalker 230 SubstationSPP GI-CS-2025-26 | Windtalker 230 Substation | 199 | Wind | In study |
| Looff 230 Substation (Burlington Expansion)SPP GI-CS-2025-08 | Looff 230 Substation (Burlington Expansion) | 199 | Wind | In study |
| Looff 230 Substation (Burlington Expansion)SPP GI-CS-2025-07 | Looff 230 Substation (Burlington Expansion) | 199 | Wind | In study |
Substations, 115 kV and up
- Unnamed · 3 lines230 kV
- LANDSMAN CREEK · 3 lines230 kV
- KIT CARSON WINDPOWER · 1 lines230 kV
- Unnamed · 3 lines115 kV
- SOUTH FORK · 3 lines115 kV
- SMOKY HILLS · 3 lines115 kV
- Unnamed · 3 lines115 kV
- Unnamed · 3 lines115 kV
Planned, retiring and retired plants
- Singing Grass Wind · Wind, planned 2027603 MW
- Carousel Energy Storage, LLC · Storage, planned 2027150 MW
Data center tax exemption in Colorado
No data center-specific sales tax exemption found. HB26-1030, which would have offered 20- to 30-year sales and use tax exemptions for data centers investing $250M, was postponed indefinitely in committee on May 7, 2026.
Recent change: HB26-1030 (data center incentives) died in the House Energy and Environment Committee on May 7, 2026; a similar 2025 bill (SB25-280) also failed.
Source: Colorado General Assembly, 2026-05-07. General information, not tax advice; ask your tax advisor.
AI data centers being built in Colorado
| Campus | Developer | County | MW | Status | Source |
|---|---|---|---|---|---|
| QTS Aurora-Denver campus (DEN1) | QTS Data Centers | Arapahoe County | 160 | operating | Sentinel ColoradoJul 8, 2026 |
How the score works
Six parts out of 100: transmission (25), generation in the queue (20), the state's industrial power price (20), existing and retiring plants (15), sales tax exemption (10) and data center activity (10). The site finder's methodology prints each formula and every source with its date. Markets: Utility territory (no ISO/RTO).
All states
- US site finder
- Alabama
- Alaska
- Arizona
- Arkansas
- California
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming