AI data center sites in Connecticut
9 Connecticut counties scored on transmission, the interconnection queue, power price and tax. Updated October 18, 2026.
Open a county for its queue requests, substations, plants and data centers.
| County | Score | Pipeline | Power price |
|---|---|---|---|
| 49 | 428 MW | 18.5¢/kWh | |
| 48 | 275 MW | 18.5¢/kWh | |
| 44 | 411 MW | 18.5¢/kWh | |
| 41 | 139 MW | 18.5¢/kWh | |
| 41 | 5 MW | 18.5¢/kWh | |
| 39 | - | 18.5¢/kWh | |
| 36 | - | 18.5¢/kWh | |
| 35 | - | 18.5¢/kWh | |
| 23 | 142 MW | 18.5¢/kWh |
Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.
What the data shows
The strongest Connecticut counties for a large AI load are Capitol Planning Region (49), Lower Connecticut River Valley Planning Region (48) and South Central Connecticut Planning Region (44) on the site score. Connecticut sits in ISO-NE; its ISO queues hold 1 GW of active generation and storage requests, and it has 20 substations at 345 kV and up.
Industrial power averaged 18.5¢/kWh (EIA, July 2026 YTD), against 19.1¢/kWh a year earlier, the 45th lowest of the 50 states and DC. Connecticut has a data center sales and use tax exemption in force. We track 0 AI campuses and 2 GPU-ready colocation facilities here.
Top 6 counties in detail
1. Capitol Planning RegionISO-NE
Site score 49 of 100
- Transmission
- 22/25
- Generation pipeline
- 5/20
- Industrial power price
- 4/20
- Existing and retiring plants
- 8/15
- Sales tax exemption
- 10/10
- Data center activity
- 0/10
- Market
- ISO-NE
- Queue (active)
- 428 MW
- Agreement signed
- 0 MW
- Planned plants (EIA)
- 206 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 5
- Operating plants
- 394 MW
- Retired or retiring
- 336 MW
- Industrial power, CT
- 18.5¢/kWh
- Sales tax exemption
- Yes
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| Solar IncreaseISO-NE 1357, in service 2027-11 | To interconnect at the POI of Gravel Pit Solar (QP 1030 + QP 1247), as an increa | 152 | Solar | In study |
| SolarISO-NE 1245, in service 2028-10 | 345kV Line 3419 Tap between Meekville Junction/Barbour Hill (PSSE Bus Number: 11 | 150 | Solar | In study |
| Broadleaf SolarISO-NE 1192, in service 2027-10 | N. Bloomfield to Agawam 345kV Line. POI is approximately 3.6 mi north of N. Bloo | 101 | Solar | In study |
| SolarISO-NE 1247, in service 2027-11 | To interconnect at the POI of Gravel Pit Solar QP 1030, via a Shared Facility, Q | 25 | Solar | In study |
Substations, 115 kV and up
- SOUTHINGTON · 14 lines345 kV
- MANCHESTER · 10 lines345 kV
- NORTH BLOOMFIELD · 9 lines345 kV
- BARBOUR HILL · 7 lines345 kV
- Unnamed · 3 lines345 kV
- RIVERSIDE DR · 6 lines115 kV
- MANCHESTER · 6 lines115 kV
- BERLIN · 6 lines115 kV
Planned, retiring and retired plants
- Broadleaf Solar · Solar, planned 2028200 MW
- South Meadow · Gas, retired 2023167 MW
- CT Resource Rec Authority Facility · Other or not stated, retired 202290 MW
- Capitol District Energy Center · Gas, retired 202170 MW
2. Lower Connecticut River Valley Planning RegionISO-NE
Site score 48 of 100
- Transmission
- 22/25
- Generation pipeline
- 4/20
- Industrial power price
- 4/20
- Existing and retiring plants
- 9/15
- Sales tax exemption
- 10/10
- Data center activity
- 0/10
- Market
- ISO-NE
- Queue (active)
- 0 MW
- Agreement signed
- 0 MW
- Planned plants (EIA)
- 275 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 5
- Operating plants
- 1.8 GW
- Retired or retiring
- 0 MW
- Industrial power, CT
- 18.5¢/kWh
- Sales tax exemption
- Yes
Substations, 115 kV and up
- HADDAM · 7 lines345 kV
- MIDDLETOWN · 6 lines345 kV
- SCOVILL ROCK · 5 lines345 kV
- HADDAM NECK · 3 lines345 kV
- KLEEN · 2 lines345 kV
- BOKUM · 5 lines115 kV
- PORTLAND · 3 lines115 kV
- P & W AIRCRAFT · 2 lines115 kV
Planned, retiring and retired plants
- Elevate Middletown · Storage, planned 2027275 MW
3. South Central Connecticut Planning RegionISO-NE
Site score 44 of 100
- Transmission
- 16/25
- Generation pipeline
- 4/20
- Industrial power price
- 4/20
- Existing and retiring plants
- 9/15
- Sales tax exemption
- 10/10
- Data center activity
- 0/10
- Market
- ISO-NE
- Queue (active)
- 411 MW
- Agreement signed
- 0 MW
- Planned plants (EIA)
- 0 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 2
- Operating plants
- 2.2 GW
- Retired or retiring
- 0 MW
- Industrial power, CT
- 18.5¢/kWh
- Sales tax exemption
- Yes
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| Naugatuck Avenue Battery Storage CNR Only (see QP1089)ISO-NE 1123, in service 2028-10 | devon 115kV substation | 205 | Storage | In study |
| Naugatuck Avenue Battery StorageISO-NE 1089, in service 2028-10 | Devon 115 kV open position between 4T and 5T | 205 | Storage | In study |
Substations, 115 kV and up
- NO. WALL · 4 lines345 kV
- NEW HAVEN HARBOR · 2 lines345 kV
- DEVON · 13 lines115 kV
- WOODMONT · 4 lines115 kV
- ALLINGS CROSSING · 4 lines115 kV
- ELMWEST · 4 lines115 kV
- MILVON · 4 lines115 kV
- WATER ST · 3 lines115 kV
4. Northeastern Connecticut Planning RegionISO-NE
Site score 41 of 100
- Transmission
- 16/25
- Generation pipeline
- 4/20
- Industrial power price
- 4/20
- Existing and retiring plants
- 6/15
- Sales tax exemption
- 10/10
- Data center activity
- 0/10
- Market
- ISO-NE
- Queue (active)
- 50 MW
- Agreement signed
- 0 MW
- Planned plants (EIA)
- 139 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 2
- Operating plants
- 971 MW
- Retired or retiring
- 0 MW
- Industrial power, CT
- 18.5¢/kWh
- Sales tax exemption
- Yes
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| Husky SolarISO-NE 1138, in service 2030-05 | The POI will be located about 6.9 miles from the 1607/1505 line ROW (Exeter Tap) | 50 | Solar | In study |
Substations, 115 kV and up
- KILLINGLY · 4 lines345 kV
- LAKE ROAD · 2 lines345 kV
- TUNNEL · 6 lines115 kV
- FRY BROOK · 2 lines115 kV
Planned, retiring and retired plants
- Pure Hedge LLC · Solar, planned 202790 MW
- KCE CT 1, LLC · Storage, planned 203145 MW
5. Southeastern Connecticut Planning RegionISO-NE
Site score 41 of 100
- Transmission
- 16/25
- Generation pipeline
- 1/20
- Industrial power price
- 4/20
- Existing and retiring plants
- 10/15
- Sales tax exemption
- 10/10
- Data center activity
- 0/10
- Market
- ISO-NE
- Queue (active)
- 0 MW
- Agreement signed
- 0 MW
- Planned plants (EIA)
- 5 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 2
- Operating plants
- 3 GW
- Retired or retiring
- 19 MW
- Industrial power, CT
- 18.5¢/kWh
- Sales tax exemption
- Yes
Substations, 115 kV and up
- MONTVILLE · 12 lines345 kV
- CARD` · 7 lines345 kV
- TUNNEL · 7 lines115 kV
- BUDDINGTON · 6 lines115 kV
- WILLIAMS ST · 6 lines115 kV
- MONTVILLE · 4 lines115 kV
- Unnamed · 4 lines115 kV
- TUNNEL · 4 lines115 kV
6. Greater Bridgeport Planning RegionISO-NE
Site score 39 of 100
- Transmission
- 14/25
- Generation pipeline
- 0/20
- Industrial power price
- 4/20
- Existing and retiring plants
- 11/15
- Sales tax exemption
- 10/10
- Data center activity
- 0/10
- Market
- ISO-NE
- Queue (active)
- 0 MW
- Agreement signed
- 0 MW
- Planned plants (EIA)
- 0 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 1
- Operating plants
- 1.2 GW
- Retired or retiring
- 421 MW
- Industrial power, CT
- 18.5¢/kWh
- Sales tax exemption
- Yes
Substations, 115 kV and up
- BRIDGEPORT HARBOR · 4 lines345 kV
- TRUMBULL · 6 lines115 kV
- STEVENSON · 5 lines115 kV
- BRIDGEPORT ENERGY · 4 lines115 kV
- CONGRESS ST · 4 lines115 kV
- Unnamed · 3 lines115 kV
- HAWTHORNE · 2 lines115 kV
- ASH CREEK · 2 lines115 kV
Planned, retiring and retired plants
- Bridgeport Station · Coal, retired 2021419 MW
Data center tax exemption in Connecticut
Connecticut qualified data center tax incentive agreements (CGS 32-286, P.A. 21-1)
Under an agreement with DECD, a qualified data center and its contractors may be exempt from sales and use tax on qualified data center equipment, related services, and all electricity used, plus local property tax under a host municipality fee agreement, for 20 years (30 years at $200M in an enterprise or opportunity zone, or $400M elsewhere) if it invests at least $50M in an enterprise or federal opportunity zone or $200M elsewhere within five years; no jobs minimum or application deadline is stated.
Recent change: 2026 SB 245, which would have barred new applications from July 1, 2026, did not advance past the Finance, Revenue and Bonding Committee (last action March 23, 2026).
Source: Connecticut General Assembly, accessed 2026-10-17. General information, not tax advice; ask your tax advisor.
How the score works
Six parts out of 100: transmission (25), generation in the queue (20), the state's industrial power price (20), existing and retiring plants (15), sales tax exemption (10) and data center activity (10). The site finder's methodology prints each formula and every source with its date. Markets: ISO New England.
All states
- US site finder
- Alabama
- Alaska
- Arizona
- Arkansas
- California
- Colorado
- Delaware
- District of Columbia
- Florida
- Georgia
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Discuss a transaction
Funding a data center or the GPUs going into one in Connecticut? Tell us about the site and the capital you need, and we will come back with the lenders and the structure that fit. Operators raising debt for a cluster can start at gpulenders.com.