AI data center sites in Iowa

90 Iowa counties scored on transmission, the interconnection queue, power price and tax. Updated October 18, 2026.

Open a county for its queue requests, substations, plants and data centers.

CountyScorePipelinePower price
712.1 GW7.4¢/kWh
65200 MW7.4¢/kWh
64340 MW7.4¢/kWh
55614 MW7.4¢/kWh
55329 MW7.4¢/kWh
54470 MW7.4¢/kWh
54-7.4¢/kWh
52200 MW7.4¢/kWh
51610 MW7.4¢/kWh
51180 MW7.4¢/kWh
51-7.4¢/kWh
501.1 GW7.4¢/kWh
50150 MW7.4¢/kWh
4975 MW7.4¢/kWh
4942 MW7.4¢/kWh
48405 MW7.4¢/kWh
48260 MW7.4¢/kWh
48-7.4¢/kWh
48-7.4¢/kWh
48-7.4¢/kWh
471.4 GW7.4¢/kWh
47200 MW7.4¢/kWh
46717 MW7.4¢/kWh
46-7.4¢/kWh
46-7.4¢/kWh
45526 MW7.4¢/kWh
45-7.4¢/kWh
43560 MW7.4¢/kWh
43550 MW7.4¢/kWh
41252 MW7.4¢/kWh
40310 MW7.4¢/kWh
4050 MW7.4¢/kWh
39200 MW7.4¢/kWh
39-7.4¢/kWh
38100 MW7.4¢/kWh
38-7.4¢/kWh
38-7.4¢/kWh
37700 MW7.4¢/kWh
37420 MW7.4¢/kWh
372 MW7.4¢/kWh
37-7.4¢/kWh
37-7.4¢/kWh
37-7.4¢/kWh
36200 MW7.4¢/kWh
36200 MW7.4¢/kWh
36156 MW7.4¢/kWh
36-7.4¢/kWh
36-7.4¢/kWh
36-7.4¢/kWh
35217 MW7.4¢/kWh

Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.

What the data shows

The strongest Iowa counties for a large AI load are Linn County (71), Pottawattamie County (65) and Polk County (64) on the site score. Iowa sits in MISO, SPP and utility territory; its ISO queues hold 15 GW of active generation and storage requests, 332 MW of them with a signed interconnection agreement, and it has 37 substations at 345 kV and up.

Industrial power averaged 7.4¢/kWh (EIA, July 2026 YTD), against 7.1¢/kWh a year earlier, the 9th lowest of the 50 states and DC. Iowa has a data center sales and use tax exemption in force. We track 3 AI campuses and 8 GPU-ready colocation facilities here.

Top 6 counties in detail

1. Linn CountyMISO

Site score 71 of 100

Transmission
14/25
Generation pipeline
11/20
Industrial power price
19/20
Existing and retiring plants
6/15
Sales tax exemption
10/10
Data center activity
10/10
Market
MISO
Queue (active)
2.1 GW
Agreement signed
0 MW
Planned plants (EIA)
100 MW
Top substation
345 kV
Substations 230 kV+
1
Operating plants
742 MW
Retired or retiring
22 MW
Industrial power, IA
7.4¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Duane Arnold 161 kVMISO J3932, in service 2029-06Duane Arnold 161 kV646NuclearIn study
Duane ArnoldMISO J2268, in service 2024-10Duane Arnold400SolarIn study
Sub K (Tiffin)-Duane Arnold 345kVMISO J2469, in service 2027-10Sub K (Tiffin)-Duane Arnold 345kV300StorageIn study
Duane Arnold (ARNOLD 5)MISO R5071Duane Arnold (ARNOLD 5)251NuclearIn study
Duane Arnold (ARNOLD 5)MISO R5069Duane Arnold (ARNOLD 5)200NuclearIn study
FairfaxMISO J2120, in service 2025-06Fairfax100StorageIn study
Duane Arnold (ARNOLD 5)MISO R5072Duane Arnold (ARNOLD 5)100NuclearIn study
Duane Arnold (ARNOLD 5)MISO R5070Duane Arnold (ARNOLD 5)64NuclearIn study

Substations, 115 kV and up

  • ARNOLD · 6 lines345 kV
  • Unnamed · 5 lines161 kV
  • BERTRAM · 4 lines161 kV
  • HIAWATHA · 4 lines161 kV
  • Unnamed · 3 lines161 kV
  • COFFEY · 3 lines161 kV
  • Unnamed · 3 lines161 kV
  • COGGON · 2 lines161 kV

Planned, retiring and retired plants

  • Coggon Solar LLC · Solar, planned 2027100 MW

Data centers, AI campuses and mining sites

  • Google Cedar Rapids · AI campus, under construction · Google
  • QTS Cedar Rapids (Big Cedar Industrial Center) · AI campus, under construction · DCD
  • Ark Data Centers (formerly Involta) Marion · GPU colocation, Marion
  • QTS Data Centers Cedar Rapids campus · GPU colocation, Cedar Rapids

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

2. Pottawattamie CountyMISO

Site score 65 of 100

Transmission
18/25
Generation pipeline
3/20
Industrial power price
19/20
Existing and retiring plants
9/15
Sales tax exemption
10/10
Data center activity
6/10
Market
MISO
Queue (active)
200 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
345 kV
Substations 230 kV+
3
Operating plants
1.8 GW
Retired or retiring
0 MW
Industrial power, IA
7.4¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Overland - J1859 POI 345kV Line TapMISO J2990, in service 2025-06Overland - J1859 POI 345kV Line Tap200WindIn study

Substations, 115 kV and up

  • WALTER SCOTT ENERGY CENTER · 8 lines345 kV
  • Unnamed · 4 lines345 kV
  • WALTER SCOTT ENERGY CENTER · 3 lines345 kV
  • WALNUT WIND FARM · 2 lines161 kV

Data centers, AI campuses and mining sites

  • Google Council Bluffs · AI campus, operating · DCD
  • CyrusOne OCB1 · GPU colocation, Council Bluffs, 9 MW
  • Edged OMA01-1 and OMA01-2 · GPU colocation, Council Bluffs, 200 MW

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

3. Polk CountyMISO

Site score 64 of 100

Transmission
22/25
Generation pipeline
4/20
Industrial power price
19/20
Existing and retiring plants
7/15
Sales tax exemption
10/10
Data center activity
2/10
Market
MISO
Queue (active)
340 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
345 kV
Substations 230 kV+
5
Operating plants
1.1 GW
Retired or retiring
0 MW
Industrial power, IA
7.4¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Army Post 161kV SubstationMISO J2653, in service 2027-05Army Post 161kV Substation170StorageIn study
Army Post 161 kV SubstationMISO J2655, in service 2026-05Army Post 161 kV Substation170StorageIn study

Substations, 115 kV and up

  • SYCAMORE · 7 lines345 kV
  • GRIMES · 7 lines345 kV
  • BONDURANT · 6 lines345 kV
  • SE POLK · 6 lines345 kV
  • DES MOINES · 6 lines345 kV
  • Unnamed · 5 lines161 kV
  • NORTHEAST ANKENY · 4 lines161 kV
  • RIVER HILLS · 3 lines161 kV

Data centers, AI campuses and mining sites

  • Cologix DSM1 · GPU colocation, Des Moines, 0.6 MW
  • Edged Edged Des Moines · GPU colocation, Ankeny, 13 MW

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

4. Louisa CountyMISO

Site score 55 of 100

Transmission
14/25
Generation pipeline
5/20
Industrial power price
19/20
Existing and retiring plants
6/15
Sales tax exemption
10/10
Data center activity
0/10
Market
MISO
Queue (active)
614 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
345 kV
Substations 230 kV+
1
Operating plants
912 MW
Retired or retiring
0 MW
Industrial power, IA
7.4¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
SUB 93 LOUISA - SUB T HASKINS 345.0kVMISO J3911, in service 2030-06SUB 93 LOUISA - SUB T HASKINS 345.0kV250SolarIn study
SUB 93 LOUISA - SUB T HASKINS 345.0kVMISO J3725, in service 2028-09SUB 93 LOUISA - SUB T HASKINS 345.0kV200SolarIn study
Denmark - Newport 161kVMISO J2576, in service 2025-01Denmark - Newport 161kV164WindIn study

Substations, 115 kV and up

  • LOUISA · 3 lines345 kV
  • Unnamed · 3 lines161 kV
  • Unnamed · 3 lines161 kV

5. Muscatine CountyMISO

Site score 55 of 100

Transmission
16/25
Generation pipeline
5/20
Industrial power price
19/20
Existing and retiring plants
4/15
Sales tax exemption
10/10
Data center activity
0/10
Market
MISO
Queue (active)
329 MW
Agreement signed
0 MW
Planned plants (EIA)
59 MW
Top substation
345 kV
Substations 230 kV+
2
Operating plants
301 MW
Retired or retiring
18 MW
Industrial power, IA
7.4¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
SUB 56 - SUB 89 161.0kVMISO J3461, in service 2028-05SUB 56 - SUB 89 161.0kV156SolarIn study
Walcott 345 kVMISO J2686, in service 2028-09Walcott 345 kV150WindIn study
Grandview Substation 69 kVMISO J1927, in service 2027-08Grandview Substation 69 kV23SolarIn study

Substations, 115 kV and up

  • Unnamed · 3 lines345 kV
  • SUB 92 · 3 lines345 kV
  • MUSCATINE PLANT #1 · 4 lines161 kV
  • MUSCATINE PLANT #1 · 3 lines161 kV

Planned, retiring and retired plants

  • Muscatine Plant #1 · Gas, planned 202735 MW
  • MPW Solar 1 · Solar, planned 202824 MW

6. Webster CountyMISO

Site score 54 of 100

Transmission
16/25
Generation pipeline
5/20
Industrial power price
19/20
Existing and retiring plants
4/15
Sales tax exemption
10/10
Data center activity
0/10
Market
MISO
Queue (active)
470 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
345 kV
Substations 230 kV+
2
Operating plants
380 MW
Retired or retiring
0 MW
Industrial power, IA
7.4¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Webster-Lehigh 345kVMISO J2436, in service 2030-10Webster-Lehigh 345kV300WindIn study
Grimes - Lehigh 345kVMISO J3926, in service 2030-05Grimes - Lehigh 345kV170WindIn study

Substations, 115 kV and up

  • WEBSTER · 6 lines345 kV
  • LEHIGH · 4 lines345 kV
  • FORT DODGE · 3 lines161 kV
  • Unnamed · 3 lines161 kV

Data center tax exemption in Iowa

Iowa data center sales and use tax exemption (Iowa Code 423.3(95)), with partial refunds for smaller data centers (Iowa Code 423.4(7) and (8))

Exempts computers, cooling and power infrastructure, racking and cabling, and electricity and backup generation fuel used by a data center business that invests at least $200 million at an Iowa site within six years (facility at least 5,000 sq ft, meeting state sustainable design standards); there is no statutory jobs minimum; electricity and fuel for property that began operating on or after June 6, 2025 are exempt for 10 years in cities over 30,000 residents or 15 years elsewhere; smaller data centers ($1 million to under $200 million) may qualify for 50% partial refunds for five to ten years.

Recent change: 2025 HF 976 (signed June 6, 2025) limited the electricity and backup fuel exemption for new or expanded data centers to 10 or 15 years depending on city population, and added registration and annual reporting starting in 2026.

Source: Iowa Department of Revenue, 2025-11-03. General information, not tax advice; ask your tax advisor.

AI data centers being built in Iowa

CampusDeveloperCountyMWStatusSource
Google Cedar RapidsUsers: GoogleGoogleLinn County-under constructionGoogleMay 30, 2025
Google Council BluffsUsers: GoogleGooglePottawattamie County-operatingDCDJun 2025
QTS Cedar Rapids (Big Cedar Industrial Center)QTSLinn County-under constructionDCDAug 2025

Busiest points of interconnection in Iowa

#Point of interconnectionCountyISORequestsQueued MWMostly
1KilldeerCerro Gordo County, IAMISO31,207Gas

How the score works

Six parts out of 100: transmission (25), generation in the queue (20), the state's industrial power price (20), existing and retiring plants (15), sales tax exemption (10) and data center activity (10). The site finder's methodology prints each formula and every source with its date. Markets: MISO (Midwest and South), SPP (Plains), Utility territory (no ISO/RTO).