AI data center sites in Kentucky

92 Kentucky counties scored on transmission, the interconnection queue, power price and tax. Updated October 18, 2026.

Open a county for its queue requests, substations, plants and data centers.

CountyScorePipelinePower price
72740 MW7.5¢/kWh
60150 MW7.5¢/kWh
59400 MW7.5¢/kWh
55350 MW7.5¢/kWh
55250 MW7.5¢/kWh
55125 MW7.5¢/kWh
55-7.5¢/kWh
54-7.5¢/kWh
53-7.5¢/kWh
52-7.5¢/kWh
52-7.5¢/kWh
50100 MW7.5¢/kWh
5075 MW7.5¢/kWh
49437 MW7.5¢/kWh
4980 MW7.5¢/kWh
48527 MW7.5¢/kWh
48-7.5¢/kWh
471.3 GW7.5¢/kWh
47-7.5¢/kWh
46150 MW7.5¢/kWh
46-7.5¢/kWh
45800 MW7.5¢/kWh
45-7.5¢/kWh
44-7.5¢/kWh
43916 MW7.5¢/kWh
43-7.5¢/kWh
43-7.5¢/kWh
42360 MW7.5¢/kWh
41983 MW7.5¢/kWh
41846 MW7.5¢/kWh
41808 MW7.5¢/kWh
41340 MW7.5¢/kWh
40669 MW7.5¢/kWh
39393 MW7.5¢/kWh
38490 MW7.5¢/kWh
37395 MW7.5¢/kWh
37330 MW7.5¢/kWh
37300 MW7.5¢/kWh
3780 MW7.5¢/kWh
36200 MW7.5¢/kWh
36150 MW7.5¢/kWh
36139 MW7.5¢/kWh
3698 MW7.5¢/kWh
3642 MW7.5¢/kWh
36-7.5¢/kWh
36-7.5¢/kWh
36-7.5¢/kWh
36-7.5¢/kWh
3590 MW7.5¢/kWh
3565 MW7.5¢/kWh

Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.

What the data shows

The strongest Kentucky counties for a large AI load are Jefferson County (72), Lawrence County (60) and McCracken County (59) on the site score. Kentucky sits in PJM, utility territory and MISO; its ISO queues hold 17 GW of active generation and storage requests, 573 MW of them with a signed interconnection agreement, and it has 33 substations at 345 kV and up.

Industrial power averaged 7.5¢/kWh (EIA, July 2026 YTD), against 7.0¢/kWh a year earlier, the 10th lowest of the 50 states and DC. Kentucky has a data center sales and use tax exemption in force. We track 1 AI campus and 1 GPU-ready colocation facility here.

Top 6 counties in detail

1. Jefferson CountyUtility: LG&E and KU

Site score 72 of 100

Transmission
20/25
Generation pipeline
10/20
Industrial power price
19/20
Existing and retiring plants
13/15
Sales tax exemption
10/10
Data center activity
0/10
Market
Utility: LG&E and KU
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
740 MW
Top substation
345 kV
Substations 230 kV+
4
Operating plants
2.5 GW
Retired or retiring
390 MW
Industrial power, KY
7.5¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • MIDDLETOWN · 10 lines345 kV
  • CANE RUN SWITCHING · 10 lines345 kV
  • MILL CREEK STATION · 6 lines345 kV
  • CANE RUN · 6 lines345 kV
  • CAMPGROUND · 6 lines161 kV
  • PADDY'S RUN · 8 lines138 kV
  • ASHBOTTOM · 6 lines138 kV
  • BEARGRASS · 6 lines138 kV

Planned, retiring and retired plants

  • Mill Creek (KY) · Gas, planned 2027740 MW
  • Mill Creek (KY) · Coal, retired 2024356 MW

2. Lawrence CountyPJM

Site score 60 of 100

Transmission
21/25
Generation pipeline
3/20
Industrial power price
19/20
Existing and retiring plants
8/15
Sales tax exemption
10/10
Data center activity
0/10
Market
PJM
Queue (active)
150 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
765 kV
Substations 230 kV+
3
Operating plants
1.4 GW
Retired or retiring
0 MW
Industrial power, KY
7.5¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Busseyville 138 kVPJM AH2-249, in service 2027-12Busseyville 138 kV150SolarIn study

Substations, 115 kV and up

  • BAKER · 8 lines765 kV
  • BIG SANDY · 8 lines345 kV
  • BAKER · 2 lines345 kV
  • BUSSEYVILLE · 2 lines138 kV

3. McCracken CountyUtility: Tennessee Valley Authority

Site score 59 of 100

Transmission
17/25
Generation pipeline
4/20
Industrial power price
19/20
Existing and retiring plants
8/15
Sales tax exemption
10/10
Data center activity
0/10
Market
Utility: Tennessee Valley Authority
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
400 MW
Top substation
500 kV
Substations 230 kV+
1
Operating plants
1.7 GW
Retired or retiring
0 MW
Industrial power, KY
7.5¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • SHAWNEE · 16 lines500 kV
  • C-33 (DOE) · 11 lines161 kV
  • SHAWNEE · 9 lines161 kV
  • C-33 (DOE) · 4 lines161 kV
  • Unnamed · 4 lines161 kV
  • Unnamed · 4 lines161 kV
  • Unnamed · 3 lines161 kV
  • Unnamed · 3 lines161 kV

Planned, retiring and retired plants

  • Gage Solar · Solar, planned 2029200 MW
  • Mayfield Solar and Storage · Solar, planned 2029200 MW

4. Clark CountyPJM

Site score 55 of 100

Transmission
16/25
Generation pipeline
4/20
Industrial power price
19/20
Existing and retiring plants
6/15
Sales tax exemption
10/10
Data center activity
0/10
Market
PJM
Queue (active)
350 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
345 kV
Substations 230 kV+
2
Operating plants
947 MW
Retired or retiring
0 MW
Industrial power, KY
7.5¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Avon-North Clark 345 kVPJM AE2-138 - moved to TC1, in service 2022-06Avon-North Clark 345 kV260SolarIn study
Avon-North Clark 345 kVPJM AE2-210 - moved to TC1, in service 2022-06Avon-North Clark 345 kV90SolarIn study

Substations, 115 kV and up

  • J K SMITH (138 KV) · 6 lines345 kV
  • Unnamed · 3 lines345 kV

5. Mason CountyPJM

Site score 55 of 100

Transmission
14/25
Generation pipeline
3/20
Industrial power price
19/20
Existing and retiring plants
8/15
Sales tax exemption
10/10
Data center activity
0/10
Market
PJM
Queue (active)
250 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
345 kV
Substations 230 kV+
1
Operating plants
1.6 GW
Retired or retiring
0 MW
Industrial power, KY
7.5¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
North Clark-Spurlock 345 kVPJM AF2-111 - moved to TC1, in service 2023-12North Clark-Spurlock 345 kV250SolarIn study

Substations, 115 kV and up

  • Unnamed · 8 lines345 kV
  • Unnamed · 5 lines138 kV
  • Unnamed · 3 lines138 kV

6. Mercer CountyUtility: LG&E and KU

Site score 55 of 100

Transmission
14/25
Generation pipeline
4/20
Industrial power price
19/20
Existing and retiring plants
8/15
Sales tax exemption
10/10
Data center activity
0/10
Market
Utility: LG&E and KU
Queue (active)
115 MW
Agreement signed
0 MW
Planned plants (EIA)
125 MW
Top substation
345 kV
Substations 230 kV+
1
Operating plants
1.5 GW
Retired or retiring
0 MW
Industrial power, KY
7.5¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Van Arsdell-Mercer Industrial 69kVPJM AI2-347, in service 2026-09Van Arsdell-Mercer Industrial 69kV95SolarIn study
Van Arsdell 69 kVPJM AH1-382, in service 2025-03Van Arsdell 69 kV20Solar or wind + storageIn study

Substations, 115 kV and up

  • BROWN PLANT · 17 lines345 kV
  • Unnamed · 5 lines138 kV
  • Unnamed · 3 lines138 kV

Planned, retiring and retired plants

  • E W Brown · Storage, planned 2027125 MW

Data center tax exemption in Kentucky

Kentucky qualified data center project sales and use tax exemption (KRS 139.499; KRS 154.20-220 to 154.20-229)

Exempts data center equipment (servers, power and cooling infrastructure, software; electricity excluded) for KEDFA-approved projects whose owner, operator or colocation tenant invests within five years of preliminary approval at least $450 million (counties of 100,000+ residents), $100 million (50,001-99,999) or $25 million (50,000 or fewer), or $150 million for a project organizer; agreement terms run up to 50 years for $450 million+ projects, 25 years otherwise, or 15 years for project organizers; no statutory jobs minimum or sunset found.

Recent change: 2025 HB 775 (effective June 27, 2025) extended the 2024 Louisville-only exemption statewide with county-population investment tiers; in August 2026 a senior lawmaker said the General Assembly could revisit the breaks.

Source: Kentucky General Assembly, 2024-07-15. General information, not tax advice; ask your tax advisor.

Large-load requests in PJM

PJM forecasts its summer peak at 222,106 MW in 2036, up 65,733 MW in ten years, with large load adjustments for data center growth in 14 transmission zones, including Dominion (Virginia), AEP, ComEd and PECO. Near-term adjustments now require firm commitments, so they came down from the 2025 forecast. PJM, Jan 14, 2026

AI data centers being built in Kentucky

CampusDeveloperCountyMWStatusSource
TeraWulf Justified Data CampusUsers: AnthropicTeraWulfHancock County401under constructionTeraWulfAug 2026

How the score works

Six parts out of 100: transmission (25), generation in the queue (20), the state's industrial power price (20), existing and retiring plants (15), sales tax exemption (10) and data center activity (10). The site finder's methodology prints each formula and every source with its date. Markets: PJM (Mid-Atlantic and Midwest), Utility territory (no ISO/RTO), MISO (Midwest and South).

All states

Discuss a transaction

Funding a data center or the GPUs going into one in Kentucky? Tell us about the site and the capital you need, and we will come back with the lenders and the structure that fit. Operators raising debt for a cluster can start at gpulenders.com.

Prefer email? hello@amcompute.com