AI data center sites in Massachusetts

14 Massachusetts counties scored on transmission, the interconnection queue, power price and tax. Updated October 18, 2026.

Open a county for its queue requests, substations, plants and data centers.

CountyScorePipelinePower price
551.2 GW20.0¢/kWh
47386 MW20.0¢/kWh
46471 MW20.0¢/kWh
40299 MW20.0¢/kWh
39556 MW20.0¢/kWh
38448 MW20.0¢/kWh
36585 MW20.0¢/kWh
3652 MW20.0¢/kWh
33435 MW20.0¢/kWh
317 MW20.0¢/kWh
30189 MW20.0¢/kWh
13-20.0¢/kWh
13-20.0¢/kWh
7-20.0¢/kWh

Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.

What the data shows

The strongest Massachusetts counties for a large AI load are Middlesex County (55), Worcester County (47) and Norfolk County (46) on the site score. Massachusetts sits in ISO-NE; its ISO queues hold 8.6 GW of active generation and storage requests, and it has 39 substations at 345 kV and up.

Industrial power averaged 20.0¢/kWh (EIA, July 2026 YTD), against 19.5¢/kWh a year earlier, the 46th lowest of the 50 states and DC. Massachusetts has paused new applications for its data center sales tax exemption. We track 0 AI campuses and 17 GPU-ready colocation facilities here.

Top 6 counties in detail

1. Middlesex CountyISO-NE

Site score 55 of 100

Transmission
22/25
Generation pipeline
8/20
Industrial power price
3/20
Existing and retiring plants
10/15
Sales tax exemption
4/10
Data center activity
8/10
Market
ISO-NE
Queue (active)
1.2 GW
Agreement signed
0 MW
Planned plants (EIA)
5 MW
Top substation
450 kV
Substations 230 kV+
10
Operating plants
476 MW
Retired or retiring
2.5 GW
Industrial power, MA
20.0¢/kWh
Sales tax exemption
Paused

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Battery StorageISO-NE 1567, in service 2028-04The Point of Interconnection will be a direct interconnection will be located on509StorageIn study
Battery StorageISO-NE 1143, in service 2028-05Mystic 345 kV between breaker 101, 106 and 107508StorageIn study
Norman Street Battery StorageISO-NE 1110, in service 2028-03Mystic 115kV204StorageIn study

Substations, 115 kV and up

  • SANDY POND · 3 lines450 kV
  • TEWKSBURY SUBSTATION · 18 lines345 kV
  • SANDY POND · 11 lines345 kV
  • WAKEFIELD JUNCTION · 8 lines345 kV
  • WOBURN · 8 lines345 kV
  • NORTH CAMBRIDGE · 5 lines345 kV
  • LEXINGTON · 4 lines345 kV
  • WALTHAM · 6 lines230 kV

Planned, retiring and retired plants

  • Mystic Generating Station · Gas, retired 20242.4 GW
  • Tanner Street Generation · Gas, retired 202485 MW
  • Mass Inst Tech Cntrl Utilities/Cogen Plt · Gas, retired 202121 MW

Data centers, AI campuses and mining sites

  • 365 Data Centers Marlborough · GPU colocation, Marlborough, 2.8 MW
  • Centersquare BOS1 · GPU colocation, Waltham, 6.1 MW
  • Centersquare BOS4 · GPU colocation, Watertown, 4 MW
  • Cogent Boston - Waltham Data Center · GPU colocation, Waltham
  • CoreSite BO1 · GPU colocation, Somerville, liquid cooling
  • Equinix BO2 · GPU colocation, Billerica
  • Markley Group Lowell · GPU colocation, Lowell
  • TierPoint Boston - Marlborough · GPU colocation, Marlborough

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

2. Worcester CountyISO-NE

Site score 47 of 100

Transmission
22/25
Generation pipeline
6/20
Industrial power price
3/20
Existing and retiring plants
10/15
Sales tax exemption
4/10
Data center activity
2/10
Market
ISO-NE
Queue (active)
386 MW
Agreement signed
0 MW
Planned plants (EIA)
205 MW
Top substation
345 kV
Substations 230 kV+
5
Operating plants
2 GW
Retired or retiring
13 MW
Industrial power, MA
20.0¢/kWh
Sales tax exemption
Paused

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Battery StorageISO-NE 1320, in service 2027-04National Grid 115KV Line R144 between Millbury No. 2 and Woonsocket substations 204StorageIn study
Battery StorageISO-NE 1551, in service 2028-04The Point of Interconnection will be located on the IC’s property (Lat, long: 42182StorageIn study

Substations, 115 kV and up

  • WACHUSETT · 8 lines345 kV
  • MILLBURY NO. 3 · 6 lines345 kV
  • CARPENTER HILL · 6 lines345 kV
  • ANP BLACKSTONE ENERGY PROJECT · 2 lines345 kV
  • PRATTS JUNCTION · 7 lines230 kV
  • MILLBURY NO.2 · 11 lines115 kV
  • Unnamed · 6 lines115 kV
  • WEBSTER STREET · 6 lines115 kV

Planned, retiring and retired plants

  • Taft BESS · Storage, planned 2027200 MW

Data centers, AI campuses and mining sites

  • Iron Mountain Data Centers BOS-1 · GPU colocation, Northborough, 3.6 MW
  • Cogent Worcester Data Center · GPU colocation, Worcester

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

3. Norfolk CountyISO-NE

Site score 46 of 100

Transmission
22/25
Generation pipeline
5/20
Industrial power price
3/20
Existing and retiring plants
11/15
Sales tax exemption
4/10
Data center activity
1/10
Market
ISO-NE
Queue (active)
471 MW
Agreement signed
0 MW
Planned plants (EIA)
11 MW
Top substation
345 kV
Substations 230 kV+
8
Operating plants
2.7 GW
Retired or retiring
101 MW
Industrial power, MA
20.0¢/kWh
Sales tax exemption
Paused

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Battery StorageISO-NE 1238, in service 2028-04West Medway 345kV station301StorageIn study
Energy StorageISO-NE 877, in service 2027-07National Grid's South Wrentham 115kV substation170StorageIn study

Substations, 115 kV and up

  • WEST MEDWAY · 13 lines345 kV
  • HOLBROOK · 11 lines345 kV
  • WEST WALPOLE · 10 lines345 kV
  • BERRY STREET · 8 lines345 kV
  • STOUGHTON · 5 lines345 kV
  • Unnamed · 3 lines345 kV
  • ANP BELLINGHAM ENERGY PROJECT · 2 lines345 kV
  • WALPOLE · 5 lines230 kV

Planned, retiring and retired plants

  • Potter Station 2 · Gas, retired 2024101 MW

Data centers, AI campuses and mining sites

  • Digital Realty BOS14 · GPU colocation, Needham

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

4. Hampden CountyISO-NE

Site score 40 of 100

Transmission
18/25
Generation pipeline
4/20
Industrial power price
3/20
Existing and retiring plants
11/15
Sales tax exemption
4/10
Data center activity
1/10
Market
ISO-NE
Queue (active)
299 MW
Agreement signed
0 MW
Planned plants (EIA)
10 MW
Top substation
345 kV
Substations 230 kV+
3
Operating plants
1.4 GW
Retired or retiring
260 MW
Industrial power, MA
20.0¢/kWh
Sales tax exemption
Paused

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Battery StorageISO-NE 1365, in service 2029-06Connect to South Agawam 115 kV switchyard254StorageIn study
West Springfield 45 MW BESSISO-NE 1272, in service 2029-05West Springfield Station, 115kV Bus (existing 8C-3X 140 MVA transformer; positio45StorageIn study

Substations, 115 kV and up

  • AGAWAM · 10 lines345 kV
  • LUDLOW · 10 lines345 kV
  • STONY BROOK · 1 lines345 kV
  • Unnamed · 9 lines115 kV
  • SILVER · 4 lines115 kV
  • SOUTH AGAWAM SWITCHING STATION · 4 lines115 kV
  • PALMER · 4 lines115 kV
  • CADWELL SWITCHING STATION · 3 lines115 kV

Planned, retiring and retired plants

  • Essential Power Massachusetts LLC · Gas, retired 2022251 MW

Data centers, AI campuses and mining sites

  • Cogent Springfield Data Center · GPU colocation, Springfield

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

5. Suffolk CountyISO-NE

Site score 39 of 100

Transmission
20/25
Generation pipeline
5/20
Industrial power price
3/20
Existing and retiring plants
4/15
Sales tax exemption
4/10
Data center activity
4/10
Market
ISO-NE
Queue (active)
556 MW
Agreement signed
0 MW
Planned plants (EIA)
250 MW
Top substation
345 kV
Substations 230 kV+
4
Operating plants
269 MW
Retired or retiring
7 MW
Industrial power, MA
20.0¢/kWh
Sales tax exemption
Paused

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Lite Brite Battery StorageISO-NE 1148, in service 2028-05Electric Avenue 115 kV substation (bus number 110926), Zone MA_NST306StorageIn study
Hecate Energy Eastern Ave Energy CenterISO-NE 1115, in service 2027-12Sta 488 Chelsea 115 kV substation250StorageIn study

Substations, 115 kV and up

  • KINGSTON STREET · 10 lines345 kV
  • K STREET · 8 lines345 kV
  • MYSTIC · 7 lines345 kV
  • HYDE PARK · 2 lines345 kV
  • BAKER STREET · 7 lines115 kV
  • BRIGHTON · 7 lines115 kV
  • DEWAR STREET · 4 lines115 kV
  • CHELSEA SUBSTATION · 2 lines115 kV

Planned, retiring and retired plants

  • Energizar BESS · Storage, planned 2027250 MW

Data centers, AI campuses and mining sites

  • DataBank BOS1 · GPU colocation, Boston, 0.5 MW
  • EdgeConneX BOS01 · GPU colocation, Boston, 1.5 MW
  • Evocative BOS1 · GPU colocation, Boston, 6 MW
  • Markley Group One Summer Street · GPU colocation, Boston

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

6. Essex CountyISO-NE

Site score 38 of 100

Transmission
18/25
Generation pipeline
5/20
Industrial power price
3/20
Existing and retiring plants
8/15
Sales tax exemption
4/10
Data center activity
1/10
Market
ISO-NE
Queue (active)
448 MW
Agreement signed
0 MW
Planned plants (EIA)
5 MW
Top substation
345 kV
Substations 230 kV+
3
Operating plants
1.2 GW
Retired or retiring
28 MW
Industrial power, MA
20.0¢/kWh
Sales tax exemption
Paused

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Battery StorageISO-NE 1557, in service 2028-01115 kV Wakefield Junction Substation240StorageIn study
Battery StorageISO-NE 1555, in service 2028-01115KV Line Q-169 between Resco-Saugus Tap and Melrose #2 Tap. Approximately 2.4 207StorageIn study

Substations, 115 kV and up

  • WARD HILL · 5 lines345 kV
  • GOLDEN HILLS · 5 lines345 kV
  • WEST AMESBURY · 3 lines345 kV
  • SOUTH BROADWAY · 6 lines115 kV
  • KING STREET · 6 lines115 kV
  • Unnamed · 5 lines115 kV
  • Unnamed · 4 lines115 kV
  • WAKEFIELD JUNCTION · 4 lines115 kV

Planned, retiring and retired plants

  • Waters River · Gas, retired 202621 MW

Data centers, AI campuses and mining sites

  • TierPoint Boston - Andover · GPU colocation, Andover

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

Data center tax exemption in Massachusetts

Massachusetts qualified data center sales and use tax exemption (M.G.L. c. 64H, s. 6(zz); c. 23A, s. 70; 400 CMR 9.00)

Twenty-year sales and use tax exemption for eligible data center equipment, software, electricity and construction costs at EOED-certified facilities of at least 100,000 sq ft that incur at least $50 million in eligible costs within 10 years of certification and maintain at least 100 Massachusetts jobs; the state stopped accepting applications in June 2026 until further notice.

Recent change: Created by the 2024 Mass Leads Act (Chapter 238 of the Acts of 2024); on June 25, 2026 Gov. Healey put a hold on applications until further notice, pending protections against higher energy bills, and issued a framework expecting projects to bring their own clean energy.

Source: Massachusetts Legislature, accessed 2026-10-17. General information, not tax advice; ask your tax advisor.

How the score works

Six parts out of 100: transmission (25), generation in the queue (20), the state's industrial power price (20), existing and retiring plants (15), sales tax exemption (10) and data center activity (10). The site finder's methodology prints each formula and every source with its date. Markets: ISO New England.

All states

Discuss a transaction

Funding a data center or the GPUs going into one in Massachusetts? Tell us about the site and the capital you need, and we will come back with the lenders and the structure that fit. Operators raising debt for a cluster can start at gpulenders.com.

Prefer email? hello@amcompute.com