AI data center sites in Michigan
80 Michigan counties scored on transmission, the interconnection queue, power price and tax. Updated October 18, 2026.
Open a county for its queue requests, substations, plants and data centers.
| County | Score | Pipeline | Power price |
|---|---|---|---|
| 78 | 3.8 GW | 9.3¢/kWh | |
| 74 | 958 MW | 9.3¢/kWh | |
| 71 | 731 MW | 9.3¢/kWh | |
| 69 | 3.3 GW | 9.3¢/kWh | |
| 66 | 415 MW | 9.3¢/kWh | |
| 64 | 2.3 GW | 9.3¢/kWh | |
| 62 | 3.6 GW | 9.3¢/kWh | |
| 61 | 539 MW | 9.3¢/kWh | |
| 60 | 1.8 GW | 9.3¢/kWh | |
| 60 | 280 MW | 9.3¢/kWh | |
| 59 | 1.5 GW | 9.3¢/kWh | |
| 59 | 600 MW | 9.3¢/kWh | |
| 57 | 329 MW | 9.3¢/kWh | |
| 56 | 815 MW | 9.3¢/kWh | |
| 55 | 1.1 GW | 9.3¢/kWh | |
| 55 | 325 MW | 9.3¢/kWh | |
| 55 | - | 9.3¢/kWh | |
| 54 | 1.3 GW | 9.3¢/kWh | |
| 54 | 1.1 GW | 9.3¢/kWh | |
| 53 | 252 MW | 9.3¢/kWh | |
| 52 | 370 MW | 9.3¢/kWh | |
| 51 | 1.4 GW | 9.3¢/kWh | |
| 51 | 1.2 GW | 9.3¢/kWh | |
| 50 | 690 MW | 9.3¢/kWh | |
| 50 | 350 MW | 9.3¢/kWh | |
| 50 | 210 MW | 9.3¢/kWh | |
| 49 | 150 MW | 9.3¢/kWh | |
| 48 | 450 MW | 9.3¢/kWh | |
| 48 | 440 MW | 9.3¢/kWh | |
| 47 | - | 9.3¢/kWh | |
| 46 | 126 MW | 9.3¢/kWh | |
| 45 | 436 MW | 9.3¢/kWh | |
| 44 | 200 MW | 9.3¢/kWh | |
| 44 | 100 MW | 9.3¢/kWh | |
| 42 | 480 MW | 9.3¢/kWh | |
| 41 | 425 MW | 9.3¢/kWh | |
| 40 | 620 MW | 9.3¢/kWh | |
| 40 | 325 MW | 9.3¢/kWh | |
| 39 | 456 MW | 9.3¢/kWh | |
| 38 | 946 MW | 9.3¢/kWh | |
| 38 | 402 MW | 9.3¢/kWh | |
| 38 | 220 MW | 9.3¢/kWh | |
| 37 | 205 MW | 9.3¢/kWh | |
| 37 | 202 MW | 9.3¢/kWh | |
| 36 | 452 MW | 9.3¢/kWh | |
| 36 | 260 MW | 9.3¢/kWh | |
| 36 | 175 MW | 9.3¢/kWh | |
| 36 | 145 MW | 9.3¢/kWh | |
| 34 | 200 MW | 9.3¢/kWh | |
| 34 | 90 MW | 9.3¢/kWh |
Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.
What the data shows
The strongest Michigan counties for a large AI load are Monroe County (78), Wayne County (74) and Ottawa County (71) on the site score. Michigan sits in MISO and PJM; its ISO queues hold 37 GW of active generation and storage requests, 4.1 GW of them with a signed interconnection agreement, and it has 69 substations at 345 kV and up.
Industrial power averaged 9.3¢/kWh (EIA, July 2026 YTD), against 8.7¢/kWh a year earlier, the 29th lowest of the 50 states and DC. Michigan has a data center sales and use tax exemption in force. We track 1 AI campus and 11 GPU-ready colocation facilities here.
Top 6 counties in detail
1. Monroe CountyMISO
Site score 78 of 100
- Transmission
- 22/25
- Generation pipeline
- 15/20
- Industrial power price
- 17/20
- Existing and retiring plants
- 15/15
- Sales tax exemption
- 10/10
- Data center activity
- 0/10
- Market
- MISO
- Queue (active)
- 3.8 GW
- Agreement signed
- 0 MW
- Planned plants (EIA)
- 100 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 5
- Operating plants
- 4.6 GW
- Retired or retiring
- 1.6 GW
- Industrial power, MI
- 9.3¢/kWh
- Sales tax exemption
- Yes
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| Other_MISO J4024, in service 2030-09 | Other_ | 1,499 | Gas | In study |
| Other_MISO J4025, in service 2030-09 | Other_ | 1,499 | Gas | In study |
| 18MOROCCO 256583MISO J3994, in service 2028-04 | 18MOROCCO 256583 | 360 | Storage | In study |
| Toll Rd 120kVMISO J2475, in service 2027-09 | Toll Rd 120kV | 200 | Storage | In study |
| LEMOYNE - MAJESTIC 345.0kVMISO J3803, in service 2028-04 | LEMOYNE - MAJESTIC 345.0kV | 200 | Solar | In study |
| LALLENDORF - MONROE 345.0kVMISO J2486, in service 2025-11 | LALLENDORF - MONROE 345.0kV | 85 | Solar | In study |
Substations, 115 kV and up
- MONROE (MI) · 7 lines345 kV
- Unnamed · 6 lines345 kV
- TOLL ROAD · 5 lines345 kV
- Unnamed · 4 lines345 kV
- Unnamed · 3 lines345 kV
- J R WHITING · 4 lines138 kV
- SAMARIA · 2 lines138 kV
- TOLL ROAD · 6 lines120 kV
Planned, retiring and retired plants
- Monroe (MI) · Coal, retiring 20281.6 GW
- Strasburg Solar Park · Solar, planned 2028100 MW
2. Wayne CountyMISO
Site score 74 of 100
- Transmission
- 22/25
- Generation pipeline
- 10/20
- Industrial power price
- 17/20
- Existing and retiring plants
- 13/15
- Sales tax exemption
- 10/10
- Data center activity
- 2/10
- Market
- MISO
- Queue (active)
- 958 MW
- Agreement signed
- 400 MW
- Planned plants (EIA)
- 237 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 11
- Operating plants
- 1.3 GW
- Retired or retiring
- 961 MW
- Industrial power, MI
- 9.3¢/kWh
- Sales tax exemption
- Yes
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| RIVER ROUGEMISO J3872, in service 2029-01 | RIVER ROUGE | 350 | Storage | In study |
| IRONTONMISO J1902, in service 2024-09 | IRONTON | 200 | Storage | Agreement signed |
| Brownstown 12 120kVMISO J1900, in service 2024-09 | Brownstown 12 120kV | 200 | Storage | Agreement signed |
| Dayton 120kV SubstationMISO J2991, in service 2025-09 | Dayton 120kV Substation | 200 | Storage | In study |
| DBGEN GISMISO J3763, in service 2026-06 | DBGEN GIS | 8 | Other or not stated | In study |
Substations, 115 kV and up
- BROWNSTOWN · 21 lines345 kV
- WAYNE · 14 lines345 kV
- Unnamed · 4 lines345 kV
- TRENTON CHANNEL · 14 lines230 kV
- RIVER ROUGE · 11 lines230 kV
- BROWNSTOWN · 6 lines230 kV
- Unnamed · 5 lines230 kV
- Unnamed · 5 lines230 kV
Planned, retiring and retired plants
- Trenton Channel · Coal, retired 2022536 MW
- River Rouge · Coal, retired 2024369 MW
- Trenton Channel Energy Center · Storage, planned 2026220 MW
- Wyandotte · Gas, retired 202644 MW
Data centers, AI campuses and mining sites
- Cogent Detroit · GPU colocation, Detroit
- US Signal MI03 · GPU colocation, Belleville, 1.5 MW
Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.
3. Ottawa CountyMISO
Site score 71 of 100
- Transmission
- 22/25
- Generation pipeline
- 7/20
- Industrial power price
- 17/20
- Existing and retiring plants
- 15/15
- Sales tax exemption
- 10/10
- Data center activity
- 0/10
- Market
- MISO
- Queue (active)
- 731 MW
- Agreement signed
- 60 MW
- Planned plants (EIA)
- 0 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 6
- Operating plants
- 2.7 GW
- Retired or retiring
- 1.6 GW
- Industrial power, MI
- 9.3¢/kWh
- Sales tax exemption
- Yes
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| ROOSEVELTMISO J4159, in service 2028-06 | ROOSEVELT | 616 | Gas | In study |
| Argenta to Tallmadge 345kV (33 miles from Argenta)MISO J1880, in service 2024-09 | Argenta to Tallmadge 345kV (33 miles from Argenta) | 60 | Storage | Agreement signed |
| ROOSEVELTMISO J4160, in service 2026-05 | ROOSEVELT | 55 | Gas | In study |
Substations, 115 kV and up
- TALLMADGE · 14 lines345 kV
- Unnamed · 7 lines345 kV
- ROOSEVELT · 6 lines345 kV
- KENOWA · 6 lines345 kV
- Unnamed · 4 lines345 kV
- ZEELAND GENERATING STATION · 2 lines345 kV
- BLACK RIVER · 6 lines138 kV
- Unnamed · 3 lines138 kV
Planned, retiring and retired plants
- J H Campbell · Coal, retiring 20261.6 GW
- Sixth Street Gas Turbine · Gas, retired 202324 MW
4. Van Buren CountyPJM
Site score 69 of 100
- Transmission
- 18/25
- Generation pipeline
- 15/20
- Industrial power price
- 17/20
- Existing and retiring plants
- 9/15
- Sales tax exemption
- 10/10
- Data center activity
- 0/10
- Market
- PJM
- Queue (active)
- 3.3 GW
- Agreement signed
- 335 MW
- Planned plants (EIA)
- 85 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 3
- Operating plants
- 2 GW
- Retired or retiring
- 0 MW
- Industrial power, MI
- 9.3¢/kWh
- Sales tax exemption
- Yes
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| Palisades SwitchyardMISO J4040, in service 2029-10 | Palisades Switchyard | 735 | Nuclear | In study |
| Argenta - Twin Branch 345 kVPJM AH1-272, in service 2025-05 | Argenta - Twin Branch 345 kV | 300 | Solar | In study |
| Argenta - Twin Branch 345 kVPJM AI2-358, in service 2028-05 | Argenta - Twin Branch 345 kV | 300 | Solar | In study |
| ARGENTA - PALISADES 345.0kVMISO J2100, in service 2024-09 | ARGENTA - PALISADES 345.0kV | 250 | Storage | Agreement signed |
| ARGENTA - TWIN BRANCH 345.0kVMISO J2444, in service 2026-08 | ARGENTA - TWIN BRANCH 345.0kV | 220 | Solar | In study |
| ARGENTA - PALISADES 345.0kVMISO J3837, in service 2029-06 | ARGENTA - PALISADES 345.0kV | 200 | Solar | In study |
| PALISADES - VERGENNES 345.0kVMISO J2822, in service 2025-03 | PALISADES - VERGENNES 345.0kV | 200 | Storage | In study |
| ARGENTA - PALISADES 345.0kVMISO J2799, in service 2025-09 | ARGENTA - PALISADES 345.0kV | 200 | Storage | In study |
Substations, 115 kV and up
- PALISADES · 7 lines345 kV
- WEEDS LAKE · 6 lines345 kV
- PALISADES · 4 lines345 kV
- VALLEY · 3 lines138 kV
- HARTFORD · 2 lines138 kV
Planned, retiring and retired plants
- Murch Solar, LLC · Solar, planned 202785 MW
5. St. Clair CountyMISO
Site score 66 of 100
- Transmission
- 20/25
- Generation pipeline
- 4/20
- Industrial power price
- 17/20
- Existing and retiring plants
- 15/15
- Sales tax exemption
- 10/10
- Data center activity
- 0/10
- Market
- MISO
- Queue (active)
- 415 MW
- Agreement signed
- 0 MW
- Planned plants (EIA)
- 0 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 4
- Operating plants
- 4.5 GW
- Retired or retiring
- 2.6 GW
- Industrial power, MI
- 9.3¢/kWh
- Sales tax exemption
- Yes
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| ST. CLAIRMISO J3646, in service 2028-11 | ST. CLAIR | 220 | Storage | In study |
| Greenwood 120 kVMISO J2677, in service 2025-11 | Greenwood 120 kV | 195 | Solar | In study |
Substations, 115 kV and up
- ST. CLAIR · 15 lines345 kV
- BELLE RIVER · 9 lines345 kV
- FITZ · 7 lines345 kV
- GREENWOOD · 5 lines345 kV
- Unnamed · 7 lines138 kV
- Unnamed · 5 lines138 kV
- Unnamed · 3 lines138 kV
- Unnamed · 6 lines120 kV
Planned, retiring and retired plants
- Belle River · Coal, retiring 20281.4 GW
- St Clair · Coal, retired 20241.2 GW
6. Washtenaw CountyMISO
Site score 64 of 100
- Transmission
- 18/25
- Generation pipeline
- 12/20
- Industrial power price
- 17/20
- Existing and retiring plants
- 4/15
- Sales tax exemption
- 10/10
- Data center activity
- 4/10
- Market
- MISO
- Queue (active)
- 2.3 GW
- Agreement signed
- 175 MW
- Planned plants (EIA)
- 100 MW
- Top substation
- 345 kV
- Substations 230 kV+
- 3
- Operating plants
- 316 MW
- Retired or retiring
- 0 MW
- Industrial power, MI
- 9.3¢/kWh
- Sales tax exemption
- Yes
Largest queue requests
| Project | Point of interconnection | MW | Type | Stage |
|---|---|---|---|---|
| Majestic-Milan 345 kV LineMISO J3923, in service 2030-03 | Majestic-Milan 345 kV Line | 1,414 | Gas | In study |
| MAJESTIC - MILAN 345.0kVMISO J3945, in service 2030-01 | MAJESTIC - MILAN 345.0kV | 245 | Solar | In study |
| Line tap on Superior-Wayne 120kV line at 42.275480, -83.628250MISO J3654, in service 2028-06 | Line tap on Superior-Wayne 120kV line at 42.275480, -83.628250 | 150 | Storage | In study |
| VOYAGERMISO J3009, in service 2025-05 | VOYAGER | 150 | Storage | In study |
| 19CVTRYMISO J1844, in service 2024-10 | 19CVTRY | 100 | Storage | Agreement signed |
| Line tap on Superior-Wayne 120kV line at 42.275480, -83.628250MISO J3653, in service 2028-06 | Line tap on Superior-Wayne 120kV line at 42.275480, -83.628250 | 80 | Solar | In study |
| Majestic 345kV to Milan 345kVMISO S1065, in service 2028-09 | Majestic 345kV to Milan 345kV | 77 | Other or not stated | In study |
| Majestic- Lemoyne 345 kVMISO S1067, in service 2027-09 | Majestic- Lemoyne 345 kV | 75 | Other or not stated | Agreement signed |
Substations, 115 kV and up
- COVENTRY · 10 lines345 kV
- MAJESTIC · 8 lines345 kV
- MILAN · 8 lines345 kV
- PARR ROAD · 2 lines138 kV
- SUPERIOR · 8 lines120 kV
- PHOENIX · 5 lines120 kV
- BLACKSTONE · 4 lines120 kV
- Unnamed · 3 lines120 kV
Planned, retiring and retired plants
- Voyager Energy Storage · Storage, planned 2027100 MW
Data centers, AI campuses and mining sites
- Stargate Michigan, The Barn (Saline Township) · AI campus, under construction, 1 GW · Related Companies
Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.
Data center tax exemption in Michigan
Michigan enterprise data center sales and use tax exemption (MCL 205.54ee and 205.94cc; 2024 PA 207 and PA 181)
Data center equipment (computers, related equipment, certain software and construction materials) bought for a Michigan Strategic Fund-certified enterprise data center is exempt where the owner and affiliates invest at least $250 million and create and keep at least 30 jobs paying 150% of the regional median wage, with municipal water, 90% clean energy procurement and green building conditions; electricity is not among the exempt items, the exemption runs through December 31, 2050 (2065 on brownfield or former power plant sites), and no new certificates may be issued after December 31, 2029.
Recent change: The exemptions took effect April 2, 2025 (use tax) and April 17, 2025 (sales tax), per MEDC; repeal bills HB 5396-5398 were introduced in December 2025 and referred to committee, and a Senate repeal bill was announced in September 2026, none enacted per sources reviewed.
Source: Michigan Strategic Fund / MEDC, accessed 2026-10-17. General information, not tax advice; ask your tax advisor.
AI data centers being built in Michigan
| Campus | Developer | County | MW | Status | Source |
|---|---|---|---|---|---|
| Stargate Michigan, The Barn (Saline Township)Users: Oracle, OpenAI | Related Digital | Washtenaw County | 1,000 | under construction | Related CompaniesOct 30, 2025 |
Busiest points of interconnection in Michigan
| # | Point of interconnection | County | ISO | Requests | Queued MW | Mostly |
|---|---|---|---|---|---|---|
| 1 | Majestic-Milan 345 kV Line | Washtenaw County, MI | MISO | 1 | 1,414 | Gas |
| 2 | THETFORD | Genesee County, MI | MISO | 2 | 1,175 | Gas |
How the score works
Six parts out of 100: transmission (25), generation in the queue (20), the state's industrial power price (20), existing and retiring plants (15), sales tax exemption (10) and data center activity (10). The site finder's methodology prints each formula and every source with its date. Markets: MISO (Midwest and South), PJM (Mid-Atlantic and Midwest).
All states
- US site finder
- Alabama
- Alaska
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Discuss a transaction
Funding a data center or the GPUs going into one in Michigan? Tell us about the site and the capital you need, and we will come back with the lenders and the structure that fit. Operators raising debt for a cluster can start at gpulenders.com.
Prefer email? hello@amcompute.com