AI data center sites in Michigan

80 Michigan counties scored on transmission, the interconnection queue, power price and tax. Updated October 18, 2026.

Open a county for its queue requests, substations, plants and data centers.

CountyScorePipelinePower price
783.8 GW9.3¢/kWh
74958 MW9.3¢/kWh
71731 MW9.3¢/kWh
693.3 GW9.3¢/kWh
66415 MW9.3¢/kWh
642.3 GW9.3¢/kWh
623.6 GW9.3¢/kWh
61539 MW9.3¢/kWh
601.8 GW9.3¢/kWh
60280 MW9.3¢/kWh
591.5 GW9.3¢/kWh
59600 MW9.3¢/kWh
57329 MW9.3¢/kWh
56815 MW9.3¢/kWh
551.1 GW9.3¢/kWh
55325 MW9.3¢/kWh
55-9.3¢/kWh
541.3 GW9.3¢/kWh
541.1 GW9.3¢/kWh
53252 MW9.3¢/kWh
52370 MW9.3¢/kWh
511.4 GW9.3¢/kWh
511.2 GW9.3¢/kWh
50690 MW9.3¢/kWh
50350 MW9.3¢/kWh
50210 MW9.3¢/kWh
49150 MW9.3¢/kWh
48450 MW9.3¢/kWh
48440 MW9.3¢/kWh
47-9.3¢/kWh
46126 MW9.3¢/kWh
45436 MW9.3¢/kWh
44200 MW9.3¢/kWh
44100 MW9.3¢/kWh
42480 MW9.3¢/kWh
41425 MW9.3¢/kWh
40620 MW9.3¢/kWh
40325 MW9.3¢/kWh
39456 MW9.3¢/kWh
38946 MW9.3¢/kWh
38402 MW9.3¢/kWh
38220 MW9.3¢/kWh
37205 MW9.3¢/kWh
37202 MW9.3¢/kWh
36452 MW9.3¢/kWh
36260 MW9.3¢/kWh
36175 MW9.3¢/kWh
36145 MW9.3¢/kWh
34200 MW9.3¢/kWh
3490 MW9.3¢/kWh

Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.

What the data shows

The strongest Michigan counties for a large AI load are Monroe County (78), Wayne County (74) and Ottawa County (71) on the site score. Michigan sits in MISO and PJM; its ISO queues hold 37 GW of active generation and storage requests, 4.1 GW of them with a signed interconnection agreement, and it has 69 substations at 345 kV and up.

Industrial power averaged 9.3¢/kWh (EIA, July 2026 YTD), against 8.7¢/kWh a year earlier, the 29th lowest of the 50 states and DC. Michigan has a data center sales and use tax exemption in force. We track 1 AI campus and 11 GPU-ready colocation facilities here.

Top 6 counties in detail

1. Monroe CountyMISO

Site score 78 of 100

Transmission
22/25
Generation pipeline
15/20
Industrial power price
17/20
Existing and retiring plants
15/15
Sales tax exemption
10/10
Data center activity
0/10
Market
MISO
Queue (active)
3.8 GW
Agreement signed
0 MW
Planned plants (EIA)
100 MW
Top substation
345 kV
Substations 230 kV+
5
Operating plants
4.6 GW
Retired or retiring
1.6 GW
Industrial power, MI
9.3¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Other_MISO J4024, in service 2030-09Other_1,499GasIn study
Other_MISO J4025, in service 2030-09Other_1,499GasIn study
18MOROCCO 256583MISO J3994, in service 2028-0418MOROCCO 256583360StorageIn study
Toll Rd 120kVMISO J2475, in service 2027-09Toll Rd 120kV200StorageIn study
LEMOYNE - MAJESTIC 345.0kVMISO J3803, in service 2028-04LEMOYNE - MAJESTIC 345.0kV200SolarIn study
LALLENDORF - MONROE 345.0kVMISO J2486, in service 2025-11LALLENDORF - MONROE 345.0kV85SolarIn study

Substations, 115 kV and up

  • MONROE (MI) · 7 lines345 kV
  • Unnamed · 6 lines345 kV
  • TOLL ROAD · 5 lines345 kV
  • Unnamed · 4 lines345 kV
  • Unnamed · 3 lines345 kV
  • J R WHITING · 4 lines138 kV
  • SAMARIA · 2 lines138 kV
  • TOLL ROAD · 6 lines120 kV

Planned, retiring and retired plants

  • Monroe (MI) · Coal, retiring 20281.6 GW
  • Strasburg Solar Park · Solar, planned 2028100 MW

2. Wayne CountyMISO

Site score 74 of 100

Transmission
22/25
Generation pipeline
10/20
Industrial power price
17/20
Existing and retiring plants
13/15
Sales tax exemption
10/10
Data center activity
2/10
Market
MISO
Queue (active)
958 MW
Agreement signed
400 MW
Planned plants (EIA)
237 MW
Top substation
345 kV
Substations 230 kV+
11
Operating plants
1.3 GW
Retired or retiring
961 MW
Industrial power, MI
9.3¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
RIVER ROUGEMISO J3872, in service 2029-01RIVER ROUGE350StorageIn study
IRONTONMISO J1902, in service 2024-09IRONTON200StorageAgreement signed
Brownstown 12 120kVMISO J1900, in service 2024-09Brownstown 12 120kV200StorageAgreement signed
Dayton 120kV SubstationMISO J2991, in service 2025-09Dayton 120kV Substation200StorageIn study
DBGEN GISMISO J3763, in service 2026-06DBGEN GIS8Other or not statedIn study

Substations, 115 kV and up

  • BROWNSTOWN · 21 lines345 kV
  • WAYNE · 14 lines345 kV
  • Unnamed · 4 lines345 kV
  • TRENTON CHANNEL · 14 lines230 kV
  • RIVER ROUGE · 11 lines230 kV
  • BROWNSTOWN · 6 lines230 kV
  • Unnamed · 5 lines230 kV
  • Unnamed · 5 lines230 kV

Planned, retiring and retired plants

  • Trenton Channel · Coal, retired 2022536 MW
  • River Rouge · Coal, retired 2024369 MW
  • Trenton Channel Energy Center · Storage, planned 2026220 MW
  • Wyandotte · Gas, retired 202644 MW

Data centers, AI campuses and mining sites

  • Cogent Detroit · GPU colocation, Detroit
  • US Signal MI03 · GPU colocation, Belleville, 1.5 MW

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

3. Ottawa CountyMISO

Site score 71 of 100

Transmission
22/25
Generation pipeline
7/20
Industrial power price
17/20
Existing and retiring plants
15/15
Sales tax exemption
10/10
Data center activity
0/10
Market
MISO
Queue (active)
731 MW
Agreement signed
60 MW
Planned plants (EIA)
0 MW
Top substation
345 kV
Substations 230 kV+
6
Operating plants
2.7 GW
Retired or retiring
1.6 GW
Industrial power, MI
9.3¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
ROOSEVELTMISO J4159, in service 2028-06ROOSEVELT616GasIn study
Argenta to Tallmadge 345kV (33 miles from Argenta)MISO J1880, in service 2024-09Argenta to Tallmadge 345kV (33 miles from Argenta)60StorageAgreement signed
ROOSEVELTMISO J4160, in service 2026-05ROOSEVELT55GasIn study

Substations, 115 kV and up

  • TALLMADGE · 14 lines345 kV
  • Unnamed · 7 lines345 kV
  • ROOSEVELT · 6 lines345 kV
  • KENOWA · 6 lines345 kV
  • Unnamed · 4 lines345 kV
  • ZEELAND GENERATING STATION · 2 lines345 kV
  • BLACK RIVER · 6 lines138 kV
  • Unnamed · 3 lines138 kV

Planned, retiring and retired plants

  • J H Campbell · Coal, retiring 20261.6 GW
  • Sixth Street Gas Turbine · Gas, retired 202324 MW

4. Van Buren CountyPJM

Site score 69 of 100

Transmission
18/25
Generation pipeline
15/20
Industrial power price
17/20
Existing and retiring plants
9/15
Sales tax exemption
10/10
Data center activity
0/10
Market
PJM
Queue (active)
3.3 GW
Agreement signed
335 MW
Planned plants (EIA)
85 MW
Top substation
345 kV
Substations 230 kV+
3
Operating plants
2 GW
Retired or retiring
0 MW
Industrial power, MI
9.3¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Palisades SwitchyardMISO J4040, in service 2029-10Palisades Switchyard735NuclearIn study
Argenta - Twin Branch 345 kVPJM AH1-272, in service 2025-05Argenta - Twin Branch 345 kV300SolarIn study
Argenta - Twin Branch 345 kVPJM AI2-358, in service 2028-05Argenta - Twin Branch 345 kV300SolarIn study
ARGENTA - PALISADES 345.0kVMISO J2100, in service 2024-09ARGENTA - PALISADES 345.0kV250StorageAgreement signed
ARGENTA - TWIN BRANCH 345.0kVMISO J2444, in service 2026-08ARGENTA - TWIN BRANCH 345.0kV220SolarIn study
ARGENTA - PALISADES 345.0kVMISO J3837, in service 2029-06ARGENTA - PALISADES 345.0kV200SolarIn study
PALISADES - VERGENNES 345.0kVMISO J2822, in service 2025-03PALISADES - VERGENNES 345.0kV200StorageIn study
ARGENTA - PALISADES 345.0kVMISO J2799, in service 2025-09ARGENTA - PALISADES 345.0kV200StorageIn study

Substations, 115 kV and up

  • PALISADES · 7 lines345 kV
  • WEEDS LAKE · 6 lines345 kV
  • PALISADES · 4 lines345 kV
  • VALLEY · 3 lines138 kV
  • HARTFORD · 2 lines138 kV

Planned, retiring and retired plants

  • Murch Solar, LLC · Solar, planned 202785 MW

5. St. Clair CountyMISO

Site score 66 of 100

Transmission
20/25
Generation pipeline
4/20
Industrial power price
17/20
Existing and retiring plants
15/15
Sales tax exemption
10/10
Data center activity
0/10
Market
MISO
Queue (active)
415 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
345 kV
Substations 230 kV+
4
Operating plants
4.5 GW
Retired or retiring
2.6 GW
Industrial power, MI
9.3¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
ST. CLAIRMISO J3646, in service 2028-11ST. CLAIR220StorageIn study
Greenwood 120 kVMISO J2677, in service 2025-11Greenwood 120 kV195SolarIn study

Substations, 115 kV and up

  • ST. CLAIR · 15 lines345 kV
  • BELLE RIVER · 9 lines345 kV
  • FITZ · 7 lines345 kV
  • GREENWOOD · 5 lines345 kV
  • Unnamed · 7 lines138 kV
  • Unnamed · 5 lines138 kV
  • Unnamed · 3 lines138 kV
  • Unnamed · 6 lines120 kV

Planned, retiring and retired plants

  • Belle River · Coal, retiring 20281.4 GW
  • St Clair · Coal, retired 20241.2 GW

6. Washtenaw CountyMISO

Site score 64 of 100

Transmission
18/25
Generation pipeline
12/20
Industrial power price
17/20
Existing and retiring plants
4/15
Sales tax exemption
10/10
Data center activity
4/10
Market
MISO
Queue (active)
2.3 GW
Agreement signed
175 MW
Planned plants (EIA)
100 MW
Top substation
345 kV
Substations 230 kV+
3
Operating plants
316 MW
Retired or retiring
0 MW
Industrial power, MI
9.3¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Majestic-Milan 345 kV LineMISO J3923, in service 2030-03Majestic-Milan 345 kV Line1,414GasIn study
MAJESTIC - MILAN 345.0kVMISO J3945, in service 2030-01MAJESTIC - MILAN 345.0kV245SolarIn study
Line tap on Superior-Wayne 120kV line at 42.275480, -83.628250MISO J3654, in service 2028-06Line tap on Superior-Wayne 120kV line at 42.275480, -83.628250150StorageIn study
VOYAGERMISO J3009, in service 2025-05VOYAGER150StorageIn study
19CVTRYMISO J1844, in service 2024-1019CVTRY100StorageAgreement signed
Line tap on Superior-Wayne 120kV line at 42.275480, -83.628250MISO J3653, in service 2028-06Line tap on Superior-Wayne 120kV line at 42.275480, -83.62825080SolarIn study
Majestic 345kV to Milan 345kVMISO S1065, in service 2028-09Majestic 345kV to Milan 345kV77Other or not statedIn study
Majestic- Lemoyne 345 kVMISO S1067, in service 2027-09Majestic- Lemoyne 345 kV75Other or not statedAgreement signed

Substations, 115 kV and up

  • COVENTRY · 10 lines345 kV
  • MAJESTIC · 8 lines345 kV
  • MILAN · 8 lines345 kV
  • PARR ROAD · 2 lines138 kV
  • SUPERIOR · 8 lines120 kV
  • PHOENIX · 5 lines120 kV
  • BLACKSTONE · 4 lines120 kV
  • Unnamed · 3 lines120 kV

Planned, retiring and retired plants

  • Voyager Energy Storage · Storage, planned 2027100 MW

Data centers, AI campuses and mining sites

  • Stargate Michigan, The Barn (Saline Township) · AI campus, under construction, 1 GW · Related Companies

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

Data center tax exemption in Michigan

Michigan enterprise data center sales and use tax exemption (MCL 205.54ee and 205.94cc; 2024 PA 207 and PA 181)

Data center equipment (computers, related equipment, certain software and construction materials) bought for a Michigan Strategic Fund-certified enterprise data center is exempt where the owner and affiliates invest at least $250 million and create and keep at least 30 jobs paying 150% of the regional median wage, with municipal water, 90% clean energy procurement and green building conditions; electricity is not among the exempt items, the exemption runs through December 31, 2050 (2065 on brownfield or former power plant sites), and no new certificates may be issued after December 31, 2029.

Recent change: The exemptions took effect April 2, 2025 (use tax) and April 17, 2025 (sales tax), per MEDC; repeal bills HB 5396-5398 were introduced in December 2025 and referred to committee, and a Senate repeal bill was announced in September 2026, none enacted per sources reviewed.

Source: Michigan Strategic Fund / MEDC, accessed 2026-10-17. General information, not tax advice; ask your tax advisor.

AI data centers being built in Michigan

CampusDeveloperCountyMWStatusSource
Stargate Michigan, The Barn (Saline Township)Users: Oracle, OpenAIRelated DigitalWashtenaw County1,000under constructionRelated CompaniesOct 30, 2025

Busiest points of interconnection in Michigan

#Point of interconnectionCountyISORequestsQueued MWMostly
1Majestic-Milan 345 kV LineWashtenaw County, MIMISO11,414Gas
2THETFORDGenesee County, MIMISO21,175Gas

How the score works

Six parts out of 100: transmission (25), generation in the queue (20), the state's industrial power price (20), existing and retiring plants (15), sales tax exemption (10) and data center activity (10). The site finder's methodology prints each formula and every source with its date. Markets: MISO (Midwest and South), PJM (Mid-Atlantic and Midwest).