AI data center sites in New Mexico

33 New Mexico counties scored on transmission, the interconnection queue, power price and tax. Updated October 18, 2026.

Open a county for its queue requests, substations, plants and data centers.

CountyScorePipelinePower price
721.7 GW5.2¢/kWh
591.7 GW5.2¢/kWh
562.5 GW5.2¢/kWh
55155 MW5.2¢/kWh
51250 MW5.2¢/kWh
48140 MW5.2¢/kWh
46135 MW5.2¢/kWh
468 MW5.2¢/kWh
455 MW5.2¢/kWh
42200 MW5.2¢/kWh
41750 MW5.2¢/kWh
41-5.2¢/kWh
39158 MW5.2¢/kWh
39-5.2¢/kWh
382 MW5.2¢/kWh
38-5.2¢/kWh
37-5.2¢/kWh
36-5.2¢/kWh
35-5.2¢/kWh
34203 MW5.2¢/kWh
31-5.2¢/kWh
29-5.2¢/kWh
28-5.2¢/kWh
275 MW5.2¢/kWh
27190 MW5.2¢/kWh
26-5.2¢/kWh
25-5.2¢/kWh
25-5.2¢/kWh
24-5.2¢/kWh
24-5.2¢/kWh
24-5.2¢/kWh
24-5.2¢/kWh
22-5.2¢/kWh

Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.

What the data shows

The strongest New Mexico counties for a large AI load are San Juan County (72), Lea County (59) and Roosevelt County (56) on the site score. New Mexico sits in utility territory, SPP and CAISO; its ISO queues hold 7 GW of active generation and storage requests, 1 GW of them with a signed interconnection agreement, and it has 24 substations at 345 kV and up.

Industrial power averaged 5.2¢/kWh (EIA, July 2026 YTD), against 6.0¢/kWh a year earlier, the lowest of the 50 states and DC. New Mexico has no data center-specific sales tax exemption. We track 1 AI campus and 2 GPU-ready colocation facilities here.

Top 6 counties in detail

1. San Juan CountyUtility: Arizona Public Service

Site score 72 of 100

Transmission
25/25
Generation pipeline
12/20
Industrial power price
20/20
Existing and retiring plants
15/15
Sales tax exemption
0/10
Data center activity
0/10
Market
Utility: Arizona Public Service
Queue (active)
805 MW
Agreement signed
120 MW
Planned plants (EIA)
1.7 GW
Top substation
500 kV
Substations 230 kV+
8
Operating plants
2.1 GW
Retired or retiring
2.6 GW
Industrial power, NM
5.2¢/kWh
Sales tax exemption
None

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Shiprock 345- SubSPP 2018-G6, in service 2022-12Shiprock 345- Sub360Solar or wind + storageIn study
Hogback to West Loop 115 T-LineSPP FEUS-3, in service 2030-10Hogback to West Loop 115 T-Line180GasIn study
Glade to El Paso 115 T-Line (south of Switch 2165)SPP FEUS-5, in service 2028-12Glade to El Paso 115 T-Line (south of Switch 2165)85GasIn study
West Fork Substation 115SPP FEUS-4, in service 2028-12West Fork Substation 11560GasAgreement signed
Hood Mesa to Fruitland Tap 115 T-LineSPP FEUS-2, in service 2026-10Hood Mesa to Fruitland Tap 115 T-Line60GasAgreement signed
Hare Switching Station 115SPP FEUS-1, in service 2027-06Hare Switching Station 11560GasIn study

Substations, 115 kV and up

  • SAN JUAN · 9 lines500 kV
  • FOUR CORNERS · 8 lines500 kV
  • SHIPROCK · 7 lines345 kV
  • WATERFLOW · 2 lines345 kV
  • PILLAR · 3 lines230 kV
  • BURNHAM · 3 lines230 kV
  • BISTI · 2 lines230 kV
  • GALLEGOS · 2 lines230 kV

Planned, retiring and retired plants

  • Four Corners · Coal, retiring 20311.6 GW
  • NTEC Gas Plant · Gas, planned 20281.1 GW
  • San Juan · Coal, retired 2022924 MW
  • Foxtail Flats Solar, LLC · Solar, planned 2027250 MW
  • Four Mile Mesa Solar, LLC · Solar, planned 2027200 MW
  • Rockmont Solar and Storage Project · Solar, planned 2027130 MW
  • Westside - (NM) · Gas, planned 202760 MW

2. Lea CountySPP

Site score 59 of 100

Transmission
14/25
Generation pipeline
13/20
Industrial power price
20/20
Existing and retiring plants
12/15
Sales tax exemption
0/10
Data center activity
0/10
Market
SPP
Queue (active)
1.7 GW
Agreement signed
562 MW
Planned plants (EIA)
721 MW
Top substation
230 kV
Substations 230 kV+
3
Operating plants
1.8 GW
Retired or retiring
379 MW
Industrial power, NM
5.2¢/kWh
Sales tax exemption
None

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Hobbs - Yoakum 345 kV LineSPP ERAS-2025-020, in service 2029-11Hobbs - Yoakum 345 kV Line400Solar or wind + storageIn study
Jal - Teague 115 kV LineSPP GEN-2024-281, in service 2029-09Jal - Teague 115 kV Line250Solar or wind + storageIn study
230kV Cunningham SubstationSPP GEN-2024-GR3230kV Cunningham Substation196SolarAgreement signed
Hobbs-Andrews 345kV LineSPP ERAS-2025-014, in service 2028-05Hobbs-Andrews 345kV Line160GasIn study
Bensing 115 kV SubstationSPP GEN-2024-265, in service 2029-09Bensing 115 kV Substation155Solar or wind + storageIn study
Hobbs - LCEC West 115 kV LineSPP GEN-2024-261, in service 2029-09Hobbs - LCEC West 115 kV Line140Solar or wind + storageIn study
Roadrunner 115kVSPP GEN-2016-121, in service 2022-10Roadrunner 115kV110SolarAgreement signed
T14 Circuit 115kVSPP GEN-2025-SR29T14 Circuit 115kV75StorageAgreement signed

Substations, 115 kV and up

  • Unnamed · 8 lines230 kV
  • Unnamed · 5 lines230 kV
  • Unnamed · 4 lines230 kV
  • TAYLOR SWITCHING · 4 lines115 kV
  • Unnamed · 4 lines115 kV
  • Unnamed · 4 lines115 kV
  • Unnamed · 4 lines115 kV
  • EUNICE · 3 lines115 kV

Planned, retiring and retired plants

  • AC Ranch II · Solar, planned 2029230 MW
  • Tip Top Solar Energy Center LLC · Solar, planned 2026220 MW
  • Cunningham Solar II · Solar, planned 2027196 MW
  • Cunningham · Gas, retiring 2027190 MW
  • Maddox · Gas, retiring 2028114 MW
  • AC Ranch I · Solar, planned 202775 MW
  • Cunningham · Gas, retired 202475 MW

3. Roosevelt CountySPP

Site score 56 of 100

Transmission
16/25
Generation pipeline
14/20
Industrial power price
20/20
Existing and retiring plants
6/15
Sales tax exemption
0/10
Data center activity
0/10
Market
SPP
Queue (active)
2.5 GW
Agreement signed
320 MW
Planned plants (EIA)
200 MW
Top substation
345 kV
Substations 230 kV+
2
Operating plants
942 MW
Retired or retiring
0 MW
Industrial power, NM
5.2¢/kWh
Sales tax exemption
None

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Crossroads 345 kV SubstationSPP GEN-2024-304, in service 2029-11Crossroads 345 kV Substation500Solar or wind + storageIn study
Crossroads 345 kV SubstationSPP GEN-2024-303, in service 2029-11Crossroads 345 kV Substation500Solar or wind + storageIn study
345 kV Crossroads - Eddy County 345 kV LineSPP GEN-2024-221, in service 2030-02345 kV Crossroads - Eddy County 345 kV Line400WindIn study
Oasis to San Juan Mesa Wind Project 230 kVSPP GEN-2024-159, in service 2029-06Oasis to San Juan Mesa Wind Project 230 kV300SolarIn study
Oasis 230kV SubstationSPP ERAS-2025-018, in service 2029-11Oasis 230kV Substation256Solar or wind + storageIn study
Crossroads - Tolk 345 kV LineSPP GEN-2024-043, in service 2029-09Crossroads - Tolk 345 kV Line250WindIn study
Roosevelt 230kV SubstationSPP GEN-2019-003, in service 2022-12Roosevelt 230kV Substation150SolarAgreement signed
San Juan Mesa 230 kV SubstationSPP GEN-2025-GR2San Juan Mesa 230 kV Substation120WindAgreement signed

Substations, 115 kV and up

  • ROOSEVELT COUNTY · 5 lines345 kV
  • OASIS · 4 lines230 kV

Planned, retiring and retired plants

  • Blackwater Solar Center - NM · Solar, planned 2027200 MW

4. Doña Ana CountyUtility: El Paso Electric

Site score 55 of 100

Transmission
18/25
Generation pipeline
5/20
Industrial power price
20/20
Existing and retiring plants
9/15
Sales tax exemption
0/10
Data center activity
4/10
Market
Utility: El Paso Electric
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
155 MW
Top substation
345 kV
Substations 230 kV+
3
Operating plants
1.1 GW
Retired or retiring
103 MW
Industrial power, NM
5.2¢/kWh
Sales tax exemption
None

Substations, 115 kV and up

  • ARROYO · 6 lines345 kV
  • DIABLO · 4 lines345 kV
  • AFTON · 2 lines345 kV
  • RIO GRANDE · 7 lines115 kV
  • ANTHONY · 5 lines115 kV
  • SALOPEK · 4 lines115 kV
  • PICACHO · 3 lines115 kV
  • DONA ANA · 3 lines115 kV

Planned, retiring and retired plants

  • Santa Teresa Solar · Storage, planned 2026150 MW
  • Rio Grande · Gas, retiring 202750 MW
  • Rio Grande · Gas, retired 202550 MW

Data centers, AI campuses and mining sites

  • Project Jupiter (Stargate Dona Ana County) · AI campus, under construction · DCD

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

5. Bernalillo CountyUtility: Public Service Co. of New Mexico

Site score 51 of 100

Transmission
16/25
Generation pipeline
6/20
Industrial power price
20/20
Existing and retiring plants
7/15
Sales tax exemption
0/10
Data center activity
2/10
Market
Utility: Public Service Co. of New Mexico
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
250 MW
Top substation
345 kV
Substations 230 kV+
2
Operating plants
1.2 GW
Retired or retiring
0 MW
Industrial power, NM
5.2¢/kWh
Sales tax exemption
None

Substations, 115 kV and up

  • WEST MESA · 14 lines345 kV
  • SANDIA · 7 lines345 kV
  • REEVES · 8 lines115 kV
  • DELTA PERSON LLC · 5 lines115 kV
  • EMBUDO · 5 lines115 kV
  • IRVING · 5 lines115 kV
  • ORTIZ TAP · 4 lines115 kV
  • HAMILTON · 4 lines115 kV

Planned, retiring and retired plants

  • Corazon Energy Storage · Storage, planned 2027150 MW
  • Oso Negro · Storage, planned 2028100 MW

Data centers, AI campuses and mining sites

  • Centersquare ABQ1 · GPU colocation, Albuquerque, 8.6 MW
  • H5 Data Centers Albuquerque data center · GPU colocation, Albuquerque

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

6. McKinley CountyUtility: Public Service Co. of New Mexico

Site score 48 of 100

Transmission
20/25
Generation pipeline
3/20
Industrial power price
20/20
Existing and retiring plants
5/15
Sales tax exemption
0/10
Data center activity
0/10
Market
Utility: Public Service Co. of New Mexico
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
140 MW
Top substation
345 kV
Substations 230 kV+
4
Operating plants
658 MW
Retired or retiring
0 MW
Industrial power, NM
5.2¢/kWh
Sales tax exemption
None

Substations, 115 kV and up

  • MCKINLEY · 6 lines345 kV
  • AMBROSIA · 6 lines230 kV
  • PRUITT ESCALANTE (PEGS) · 3 lines230 kV
  • SEVEN LAKES · 2 lines230 kV
  • CHURCH ROCK TAP · 3 lines115 kV
  • CINIZA · 2 lines115 kV
  • WINGATE TAP · 2 lines115 kV
  • GALLUP · 2 lines115 kV

Planned, retiring and retired plants

  • Wildcat Solar Power Plant LLC · Solar, planned 2028140 MW

Data center tax exemption in New Mexico

New Mexico taxes sales through its gross receipts tax, and no data center-specific gross receipts tax exemption or deduction was found; bills proposing one, such as SB 26 (2021), were not enacted.

Source: New Mexico Taxation and Revenue Department, accessed 2026-10-17. General information, not tax advice; ask your tax advisor.

AI data centers being built in New Mexico

CampusDeveloperCountyMWStatusSource
Project Jupiter (Stargate Dona Ana County)Users: Oracle, OpenAISTACK Infrastructure / BorderPlex Digital AssetsDoña Ana County-under constructionOn-site powerDCDOct 2025

Busiest points of interconnection in New Mexico

#Point of interconnectionCountyISORequestsQueued MWMostly
1Crossroads 345 kV SubstationRoosevelt County, NMSPP21,000Solar or wind + storage

How the score works

Six parts out of 100: transmission (25), generation in the queue (20), the state's industrial power price (20), existing and retiring plants (15), sales tax exemption (10) and data center activity (10). The site finder's methodology prints each formula and every source with its date. Markets: Utility territory (no ISO/RTO), SPP (Plains), CAISO (California).