AI data center sites in Pennsylvania

64 Pennsylvania counties scored on transmission, the interconnection queue, power price and tax. Updated October 18, 2026.

Open a county for its queue requests, substations, plants and data centers.

CountyScorePipelinePower price
804.4 GW10.9¢/kWh
72828 MW10.9¢/kWh
69283 MW10.9¢/kWh
66433 MW10.9¢/kWh
63858 MW10.9¢/kWh
63370 MW10.9¢/kWh
6320 MW10.9¢/kWh
62226 MW10.9¢/kWh
612 MW10.9¢/kWh
59150 MW10.9¢/kWh
58444 MW10.9¢/kWh
5824 MW10.9¢/kWh
571 GW10.9¢/kWh
562.6 GW10.9¢/kWh
5640 MW10.9¢/kWh
54677 MW10.9¢/kWh
54603 MW10.9¢/kWh
54100 MW10.9¢/kWh
54-10.9¢/kWh
53470 MW10.9¢/kWh
521.3 GW10.9¢/kWh
52927 MW10.9¢/kWh
52855 MW10.9¢/kWh
52208 MW10.9¢/kWh
52150 MW10.9¢/kWh
49808 MW10.9¢/kWh
49630 MW10.9¢/kWh
49560 MW10.9¢/kWh
49-10.9¢/kWh
481.1 GW10.9¢/kWh
48469 MW10.9¢/kWh
47876 MW10.9¢/kWh
47263 MW10.9¢/kWh
4798 MW10.9¢/kWh
462 GW10.9¢/kWh
4630 MW10.9¢/kWh
45225 MW10.9¢/kWh
4515 MW10.9¢/kWh
44504 MW10.9¢/kWh
42524 MW10.9¢/kWh
42143 MW10.9¢/kWh
4198 MW10.9¢/kWh
40497 MW10.9¢/kWh
4058 MW10.9¢/kWh
39401 MW10.9¢/kWh
39162 MW10.9¢/kWh
3933 MW10.9¢/kWh
3910 MW10.9¢/kWh
381.2 GW10.9¢/kWh
3832 MW10.9¢/kWh

Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.

What the data shows

The strongest Pennsylvania counties for a large AI load are Indiana County (80), Allegheny County (72) and Luzerne County (69) on the site score. Pennsylvania sits in PJM; its ISO queues hold 27 GW of active generation and storage requests, 2.5 GW of them with a signed interconnection agreement, and it has 45 substations at 345 kV and up.

Industrial power averaged 10.9¢/kWh (EIA, July 2026 YTD), against 9.0¢/kWh a year earlier, the 38th lowest of the 50 states and DC. Pennsylvania has a data center sales and use tax exemption in force. We track 7 AI campuses and 22 GPU-ready colocation facilities here.

Top 6 counties in detail

1. Indiana CountyPJM

Site score 80 of 100

Transmission
21/25
Generation pipeline
16/20
Industrial power price
14/20
Existing and retiring plants
15/15
Sales tax exemption
10/10
Data center activity
4/10
Market
PJM
Queue (active)
435 MW
Agreement signed
110 MW
Planned plants (EIA)
4.4 GW
Top substation
500 kV
Substations 230 kV+
3
Operating plants
2.6 GW
Retired or retiring
2 GW
Industrial power, PA
10.9¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Hoodlebug Solar Energy CenterPJM AF1-272, in service 2027-08Lucerne 115 kV110SolarAgreement signed
Seward-Glory 115 kVPJM AH1-102, in service 2024-12Seward-Glory 115 kV100SolarIn study
Seward-Glory 115 kV IIPJM AH1-268, in service 2024-12Seward-Glory 115 kV II100StorageIn study
Seward-Glory 115 kVPJM AH2-195, in service 2027-10Seward-Glory 115 kV65SolarIn study
Glory - Glen Campbell 34.5 kVPJM AG2-561, in service 2023-12Glory - Glen Campbell 34.5 kV20SolarIn study
Garman-Greenwich Mine 34.5 kVPJM AG2-040, in service 2022-03Garman-Greenwich Mine 34.5 kV20SolarIn study
Long Carolyn PV 34.5 kVPJM AH2-387, in service 2023-12Long Carolyn PV 34.5 kV10SolarIn study
Long Carolyn 34.5 kVPJM AH2-388, in service 2023-12Long Carolyn 34.5 kV10StorageIn study

Substations, 115 kV and up

  • CONEMAUGH · 4 lines500 kV
  • HOMER CITY · 8 lines345 kV
  • SEWARD · 8 lines230 kV
  • Unnamed · 3 lines138 kV
  • Unnamed · 6 lines115 kV
  • Unnamed · 4 lines115 kV
  • Unnamed · 3 lines115 kV

Planned, retiring and retired plants

  • Homer City Generating Station · Gas, planned 20284.4 GW
  • Homer City Generating Station · Coal, retired 20242 GW

Data centers, AI campuses and mining sites

  • Homer City Energy Campus · AI campus, announced, 4.5 GW · DCD

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

2. Allegheny CountyPJM

Site score 72 of 100

Transmission
20/25
Generation pipeline
8/20
Industrial power price
14/20
Existing and retiring plants
12/15
Sales tax exemption
10/10
Data center activity
8/10
Market
PJM
Queue (active)
828 MW
Agreement signed
93 MW
Planned plants (EIA)
77 MW
Top substation
345 kV
Substations 230 kV+
4
Operating plants
1.1 GW
Retired or retiring
637 MW
Industrial power, PA
10.9¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Springdale 138kVPJM AH1-562, in service 2025-06Springdale 138kV250StorageIn study
Beech Hollow SolarPJM AG1-527, in service 2028-07Imperial-Joffre 138 kV215SolarIn study
Pine Creek 138 kVPJM AH1-615, in service 2025-10Pine Creek 138 kV100StorageIn study
Brunot Island 138 kVPJM AG1-485, in service 2024-06Brunot Island 138 kV55StorageIn study
Dans MountainPJM S14, in service 2025-03Dans Mountain55WindAgreement signed
Swickley - Ambridge 23 kVPJM AH2-244, in service 2023-09Swickley - Ambridge 23 kV25StorageIn study
Swickley - Ambridge 23 kVPJM AH2-245, in service 2023-09Swickley - Ambridge 23 kV25StorageIn study
Brunot Island 138 kVPJM AF2-384, in service 2023-12Brunot Island 138 kV20Solar or wind + storageIn study

Substations, 115 kV and up

  • CRESCENT · 13 lines345 kV
  • COLLIER · 11 lines345 kV
  • BRUNOT ISLAND · 6 lines345 kV
  • CLINTON · 3 lines345 kV
  • DRAVOSBURG · 13 lines138 kV
  • FIRSTENERGY SPRINGDALE POWER STATION · 10 lines138 kV
  • CHESWICK · 10 lines138 kV
  • WILMERDING · 8 lines138 kV

Planned, retiring and retired plants

  • Cheswick Power Plant · Coal, retired 2022637 MW
  • Emsworth L&D Hydroelectric Project · Hydro, planned 203020 MW

Data centers, AI campuses and mining sites

  • Ardent Data Centers Pittsburgh · GPU colocation, McKees Rocks, 12 MW, liquid cooling
  • Cogent Pittsburgh Data Center · GPU colocation, Pittsburgh
  • DataBank PIT1 · GPU colocation, Pittsburgh, 1.9 MW
  • DataBank PIT2 · GPU colocation, Pittsburgh, 5 MW
  • EdgeConneX PIT01 · GPU colocation, Pittsburgh, 1 MW
  • Expedient PIT1 · GPU colocation, Pittsburgh, 1.8 MW
  • Expedient PIT2 · GPU colocation, Pittsburgh, 4.2 MW
  • H5 Data Centers Pittsburgh · GPU colocation, Pittsburgh

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

3. Luzerne CountyPJM

Site score 69 of 100

Transmission
25/25
Generation pipeline
5/20
Industrial power price
14/20
Existing and retiring plants
11/15
Sales tax exemption
10/10
Data center activity
4/10
Market
PJM
Queue (active)
283 MW
Agreement signed
40 MW
Planned plants (EIA)
21 MW
Top substation
500 kV
Substations 230 kV+
8
Operating plants
4 GW
Retired or retiring
64 MW
Industrial power, PA
10.9¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
White Haven 2 Tap-White Haven DC 69 kVPJM AI1-105, in service 2026-12White Haven 2 Tap-White Haven DC 69 kV60SolarIn study
Harwood- McAdoo 69 kVPJM AH2-135, in service 2025-06Harwood- McAdoo 69 kV50SolarIn study
Salem-Beacon Power 69 kVPJM AG1-277 - moved to TC1, in service 2022-06Salem-Beacon Power 69 kV40Solar or wind + storageIn study
Club Ford Energy CenterPJM AG1-164, in service 2027-03East Hazelton-Weatherly Tap 69 kV20SolarAgreement signed
Club Ford Energy CenterPJM AG1-165, in service 2027-03East Hazelton-Weatherly Tap 69 kV20SolarAgreement signed
Salem-Beacon Power 69 kVPJM AG1-278 - moved to TC1, in service 2022-06Salem-Beacon Power 69 kV20Solar or wind + storageIn study
Salem-Beacon Power 69 kVPJM AG1-279 - moved to TC1, in service 2022-06Salem-Beacon Power 69 kV20Solar or wind + storageIn study
Salem - Beacon Power 69 kVPJM AI2-441, in service 2027-12Salem - Beacon Power 69 kV20Solar or wind + storageIn study

Substations, 115 kV and up

  • Unnamed · 5 lines500 kV
  • SUSQUEHANNA · 4 lines500 kV
  • SUSQUEHANNA · 10 lines230 kV
  • LACKAWANNA · 6 lines230 kV
  • Unnamed · 4 lines230 kV
  • Unnamed · 4 lines230 kV
  • Unnamed · 4 lines230 kV
  • JENKINS · 4 lines230 kV

Planned, retiring and retired plants

  • TalenEnergy Martins Creek LLC Harwood · Gas, retired 202232 MW
  • TalenEnergy Martins Creek LLC Jenkins · Gas, retired 202232 MW
  • PF Onsite BESS · Storage, planned 202721 MW

Data centers, AI campuses and mining sites

  • AWS Susquehanna campus (Salem Township) · AI campus, operating, 1.9 GW · Utility Dive

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

4. York CountyPJM

Site score 66 of 100

Transmission
25/25
Generation pipeline
6/20
Industrial power price
14/20
Existing and retiring plants
10/15
Sales tax exemption
10/10
Data center activity
0/10
Market
PJM
Queue (active)
433 MW
Agreement signed
20 MW
Planned plants (EIA)
157 MW
Top substation
500 kV
Substations 230 kV+
8
Operating plants
6.2 GW
Retired or retiring
52 MW
Industrial power, PA
10.9¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Roundtop 115 kVPJM AH2-335, in service 2025-12Roundtop 115 kV130StorageIn study
Strinestown Solar ProjectPJM AE1-129, in service 2024-12Zion View - Middletown 115 kV80SolarSuspended
Dover SolarPJM AE2-211, in service 2024-11Jackson-Three Mile Island 230 kV55SolarSuspended
Peach Bottom 500 kVPJM AH1-046, in service 2023-06Peach Bottom 500 kV25SolarIn study
Dover SolarPJM AF1-057, in service 2024-11Jackson-Three Mile Island 230 kV II20SolarSuspended
Tolna Energy CenterPJM AF2-383, in service 2028-01Tolna 115 kV20Solar or wind + storageAgreement signed
Strinestown Solar and BESSPJM AG1-052, in service 2026-12Zionsview-Middletown 115 kV II20StorageIn study
Hokes-Grantley 69 kV IIPJM AG2-476, in service 2022-03Hokes-Grantley 69 kV II20SolarIn study

Substations, 115 kV and up

  • PEACH BOTTOM · 11 lines500 kV
  • PEACH BOTTOM · 6 lines500 kV
  • PEACH BOTTOM · 3 lines500 kV
  • DELTA YORK EC · 1 lines500 kV
  • Unnamed · 8 lines230 kV
  • BRUNNER ISLAND · 8 lines230 kV
  • YORKANA · 6 lines230 kV
  • OTTER CREEK · 3 lines230 kV

Planned, retiring and retired plants

  • Strinestown Solar · Solar, planned 202780 MW
  • Dover Solar (PA) · Solar, planned 202775 MW
  • York Generation Company LLC · Gas, retired 202152 MW

5. Armstrong CountyPJM

Site score 63 of 100

Transmission
23/25
Generation pipeline
7/20
Industrial power price
14/20
Existing and retiring plants
9/15
Sales tax exemption
10/10
Data center activity
0/10
Market
PJM
Queue (active)
858 MW
Agreement signed
0 MW
Planned plants (EIA)
18 MW
Top substation
500 kV
Substations 230 kV+
4
Operating plants
2.6 GW
Retired or retiring
0 MW
Industrial power, PA
10.9¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
South Bend 500kVPJM AH1-566, in service 2025-06South Bend 500kV400StorageIn study
Keystone 230 kVPJM AG1-549 - moved to TC1, in service 2022-10Keystone 230 kV100Solar or wind + storageIn study
Saltsburg-Vandergrift 138 kVPJM AI1-162, in service 2026-09Saltsburg-Vandergrift 138 kV100StorageIn study
Piney - Timblin 115 kVPJM AH2-129, in service 2026-05Piney - Timblin 115 kV36SolarIn study
Kittanning-Rural Valley 25 kVPJM AG2-386, in service 2023-04Kittanning-Rural Valley 25 kV30SolarIn study
Kittanning-Rural Valley 25 kVPJM AI2-323, in service 2025-06Kittanning-Rural Valley 25 kV30SolarIn study
West Hills - Craigsville Junction 25 kVPJM AH1-332, in service 2023-06West Hills - Craigsville Junction 25 kV20SolarIn study
Clementine-Clementine Jct. 25 kVPJM AH1-452, in service 2023-06Clementine-Clementine Jct. 25 kV20SolarIn study

Substations, 115 kV and up

  • KEYSTONE · 4 lines500 kV
  • SOUTHBEND · 3 lines500 kV
  • ARMSTRONG · 1 lines500 kV
  • FIRSTENERGY ARMSTRONG POWER STATION · 7 lines345 kV
  • FIRSTENERGY ARMSTRONG POWER STATION · 4 lines138 kV

6. Beaver CountyPJM

Site score 63 of 100

Transmission
18/25
Generation pipeline
4/20
Industrial power price
14/20
Existing and retiring plants
9/15
Sales tax exemption
10/10
Data center activity
7/10
Market
PJM
Queue (active)
370 MW
Agreement signed
0 MW
Planned plants (EIA)
20 MW
Top substation
345 kV
Substations 230 kV+
3
Operating plants
2.2 GW
Retired or retiring
0 MW
Industrial power, PA
10.9¢/kWh
Sales tax exemption
Yes

Largest queue requests

ProjectPoint of interconnectionMWTypeStage
Hoytdale 138 kVPJM AG2-621, in service 2023-05Hoytdale 138 kV250StorageIn study
Beaver Valley - Crescent 138 kVPJM AH2-253, in service 2025-11Beaver Valley - Crescent 138 kV70Solar or wind + storageIn study
Montgomery Hydroelectric 23 kVPJM AG2-233, in service 2023-12Montgomery Hydroelectric 23 kV20HydroIn study
North Ramsey 23 kVPJM AH2-063, in service 2023-12North Ramsey 23 kV20SolarIn study
South Ramsey 23 kVPJM AH2-064, in service 2023-12South Ramsey 23 kV10SolarIn study

Substations, 115 kV and up

  • BEAVER VALLEY · 11 lines345 kV
  • MANSFIELD STATION · 8 lines345 kV
  • HOYTDALE · 4 lines345 kV
  • Unnamed · 4 lines138 kV
  • VALLEY · 4 lines138 kV
  • VALLEY · 4 lines138 kV
  • RACCOON · 4 lines138 kV
  • Unnamed · 3 lines138 kV

Planned, retiring and retired plants

  • Montgomery L&D Hydroelectric Project · Hydro, planned 202820 MW

Data centers, AI campuses and mining sites

  • Aligned Project Phoenix (Shippingport Industrial Park) · AI campus, under construction, 2 GW · DCD
  • Mawson Infrastructure, Midland · mining site, 120 MW

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

Data center tax exemption in Pennsylvania

Pennsylvania Computer Data Center Equipment Exemption Program (Act 84 of 2016, as amended by Act 25 of 2021), administered by the Department of Revenue

Computer data center equipment (servers and storage, plus electrical, cooling and related infrastructure, not electricity itself) used in a certified data center is exempt from sales and use tax; by the fourth anniversary of certification the center must make at least $75 million of new investment and create 25 jobs in a county of 250,000 or fewer people, or $100 million and 45 jobs in a larger county, then pay at least $1 million in annual compensation, and certification lasts 25 years with exemption certificates renewed annually.

Recent change: June 25, 2026: the House passed HB 2198 (197-5) to repeal the program, and the Senate passed HB 1667, a Tax Code bill, 44-6 with language that would also eliminate it; neither is law. HB 2198 has sat in Senate Finance since June 26, and HB 1667 was amended in House Rules on concurrence on July 1 and re-committed to Rules on October 6, 2026, with no concurrence vote. August 18, 2026: Executive Order 2026-05 requires new applicants to include a Consent Order and Agreement with DEP implementing the GRID standards.

Source: Pennsylvania Department of Revenue, accessed 2026-10-17. General information, not tax advice; ask your tax advisor.

Large-load requests in PJM

PJM forecasts its summer peak at 222,106 MW in 2036, up 65,733 MW in ten years, with large load adjustments for data center growth in 14 transmission zones, including Dominion (Virginia), AEP, ComEd and PECO. Near-term adjustments now require firm commitments, so they came down from the 2025 forecast. PJM, Jan 14, 2026

AI data centers being built in Pennsylvania

CampusDeveloperCountyMWStatusSource
Homer City Energy CampusHomer City Redevelopment / Knighthead / KiewitIndiana County4,500announcedOn-site powerDCDApr 2025
TECfusions Keystone ConnectTECfusionsWestmoreland County3,000announcedGrid + on-site powerDCDJan 2025
Aligned Project Phoenix (Shippingport Industrial Park)Aligned Data Centers / Frontier GroupBeaver County2,000under constructionOn-site powerDCDSep 10, 2026
AWS Susquehanna campus (Salem Township)Amazon Web ServicesLuzerne County1,920operatingUtility DiveJun 11, 2025
Bitfarms Panther CreekBitfarms (Keel Infrastructure)Carbon County350under constructionBitfarmsMar 2026
CoreWeave LancasterUsers: CoreWeaveChirisa Technology Parks / Machine Investment GroupLancaster County300under constructionDCDJul 15, 2025
AWS Keystone Trade Center (Falls Township)Amazon Web ServicesBucks County-announcedWHYYJun 9, 2025

How the score works

Six parts out of 100: transmission (25), generation in the queue (20), the state's industrial power price (20), existing and retiring plants (15), sales tax exemption (10) and data center activity (10). The site finder's methodology prints each formula and every source with its date. Markets: PJM (Mid-Atlantic and Midwest).