CountyScorePipelinePower price
7516 MW6.8¢/kWh
751.6 GW6.8¢/kWh
701.8 GW6.8¢/kWh
6166 MW6.8¢/kWh
61-6.8¢/kWh
59-6.8¢/kWh
58134 MW6.8¢/kWh
56-6.8¢/kWh
55-6.8¢/kWh
54-6.8¢/kWh
5342 MW6.8¢/kWh
53-6.8¢/kWh
51-6.8¢/kWh
51-6.8¢/kWh
51-6.8¢/kWh
50-6.8¢/kWh
49-6.8¢/kWh
48-6.8¢/kWh
48-6.8¢/kWh
48-6.8¢/kWh
47-6.8¢/kWh
47-6.8¢/kWh
38110 MW6.8¢/kWh
3855 MW6.8¢/kWh
38-6.8¢/kWh
3850 MW6.8¢/kWh
38-6.8¢/kWh
37-6.8¢/kWh
37-6.8¢/kWh
3750 MW6.8¢/kWh
37-6.8¢/kWh
37-6.8¢/kWh
3623 MW6.8¢/kWh
36-6.8¢/kWh
36-6.8¢/kWh
36-6.8¢/kWh
36-6.8¢/kWh
36-6.8¢/kWh
36-6.8¢/kWh
3620 MW6.8¢/kWh
36-6.8¢/kWh
36-6.8¢/kWh
36-6.8¢/kWh
35-6.8¢/kWh
35-6.8¢/kWh
35-6.8¢/kWh
353 MW6.8¢/kWh
35200 MW6.8¢/kWh
35-6.8¢/kWh
35-6.8¢/kWh

Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.

What the data shows

The strongest Tennessee counties for a large AI load are Shelby County (75), Stewart County (75) and Roane County (70) on the site score. Tennessee sits in utility territory; its ISO queues hold 156 MW of active generation and storage requests, and it has 30 substations at 345 kV and up.

Industrial power averaged 6.8¢/kWh (EIA, July 2026 YTD), against 6.9¢/kWh a year earlier, the 6th lowest of the 50 states and DC. Tennessee has a data center sales and use tax exemption in force. We track 3 AI campuses and 7 GPU-ready colocation facilities here.

Top 6 counties in detail

1. Shelby CountyUtility: Tennessee Valley Authority

Site score 75 of 100

Transmission
21/25
Generation pipeline
2/20
Industrial power price
20/20
Existing and retiring plants
12/15
Sales tax exemption
10/10
Data center activity
10/10
Market
Utility: Tennessee Valley Authority
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
16 MW
Top substation
500 kV
Substations 230 kV+
3
Operating plants
1.6 GW
Retired or retiring
502 MW
Industrial power, TN
6.8¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • CORDOVA · 20 lines500 kV
  • FREEPORT · 15 lines500 kV
  • SHELBY · 11 lines500 kV
  • NORTHEAST GATE · 14 lines161 kV
  • SOUTHEAST GATE · 14 lines161 kV
  • ALLEN · 11 lines161 kV
  • SOUTHGATE · 10 lines161 kV
  • NORTH PRIMARY · 6 lines161 kV

Planned, retiring and retired plants

  • Allen · Gas, retired 2025502 MW

Data centers, AI campuses and mining sites

  • xAI Colossus 1 · AI campus, operating, 300 MW · DCD
  • xAI Colossus 2 (Tulane Road) · AI campus, operating · SemiAnalysis
  • 5C Data Centers MEM01 · GPU colocation, Memphis, 20 MW
  • Merkle Standard, Memphis · mining site

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

2. Stewart CountyUtility: Tennessee Valley Authority

Site score 75 of 100

Transmission
17/25
Generation pipeline
13/20
Industrial power price
20/20
Existing and retiring plants
15/15
Sales tax exemption
10/10
Data center activity
0/10
Market
Utility: Tennessee Valley Authority
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
1.6 GW
Top substation
500 kV
Substations 230 kV+
1
Operating plants
2.6 GW
Retired or retiring
1.3 GW
Industrial power, TN
6.8¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • CUMBERLAND 500KV · 7 lines500 kV
  • DOVER · 2 lines161 kV

Planned, retiring and retired plants

  • Cumberland (TN) · Gas, planned 20291.6 GW
  • Cumberland (TN) · Coal, retiring 20281.3 GW

3. Roane CountyUtility: Tennessee Valley Authority

Site score 70 of 100

Transmission
17/25
Generation pipeline
9/20
Industrial power price
20/20
Existing and retiring plants
14/15
Sales tax exemption
10/10
Data center activity
0/10
Market
Utility: Tennessee Valley Authority
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
1.8 GW
Top substation
500 kV
Substations 230 kV+
1
Operating plants
1.7 GW
Retired or retiring
1.1 GW
Industrial power, TN
6.8¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • Unnamed · 9 lines500 kV
  • KINGSTON · 12 lines161 kV
  • KINGSTON · 7 lines161 kV
  • KINGSTON · 5 lines161 kV
  • ROCKWOOD · 4 lines161 kV
  • Unnamed · 3 lines161 kV
  • Unnamed · 3 lines161 kV
  • Unnamed · 3 lines161 kV

Planned, retiring and retired plants

  • Kingston · Gas, planned 20271.8 GW
  • Kingston · Coal, retiring 20271.1 GW

4. Haywood CountyUtility: Tennessee Valley Authority

Site score 61 of 100

Transmission
19/25
Generation pipeline
3/20
Industrial power price
20/20
Existing and retiring plants
9/15
Sales tax exemption
10/10
Data center activity
0/10
Market
Utility: Tennessee Valley Authority
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
66 MW
Top substation
500 kV
Substations 230 kV+
2
Operating plants
2.1 GW
Retired or retiring
0 MW
Industrial power, TN
6.8¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • LAGOON CREEK · 4 lines500 kV
  • BROWNSVILLE · 2 lines500 kV
  • BROWNSVILLE INDL.PK. · 5 lines161 kV
  • Unnamed · 3 lines161 kV
  • Unnamed · 3 lines161 kV

Planned, retiring and retired plants

  • SR Durhamville · Solar, planned 202766 MW

5. Humphreys CountyUtility: Tennessee Valley Authority

Site score 61 of 100

Transmission
17/25
Generation pipeline
0/20
Industrial power price
20/20
Existing and retiring plants
14/15
Sales tax exemption
10/10
Data center activity
0/10
Market
Utility: Tennessee Valley Authority
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
500 kV
Substations 230 kV+
1
Operating plants
1.7 GW
Retired or retiring
1.1 GW
Industrial power, TN
6.8¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • JOHNSONVILLE · 8 lines500 kV
  • JOHNSONVILLE · 14 lines161 kV
  • Unnamed · 3 lines161 kV
  • Unnamed · 3 lines161 kV

Planned, retiring and retired plants

  • Johnsonville · Gas, retiring 2028680 MW
  • Johnsonville · Gas, retired 2025408 MW

6. Hamilton CountyUtility: Tennessee Valley Authority

Site score 59 of 100

Transmission
19/25
Generation pipeline
0/20
Industrial power price
20/20
Existing and retiring plants
9/15
Sales tax exemption
10/10
Data center activity
1/10
Market
Utility: Tennessee Valley Authority
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
500 kV
Substations 230 kV+
2
Operating plants
4.3 GW
Retired or retiring
0 MW
Industrial power, TN
6.8¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • SEQUOYAH · 13 lines500 kV
  • CONCORD · 6 lines230 kV
  • MOCCASIN · 9 lines161 kV
  • CHATTANOOGA PSCC · 6 lines161 kV
  • Unnamed · 3 lines161 kV
  • CUMMINGS · 2 lines161 kV
  • APISON PIKE · 2 lines161 kV
  • HAWTHORNE · 2 lines161 kV

Data centers, AI campuses and mining sites

  • DC BLOX Chattanooga (CHA1) · GPU colocation, Chattanooga, 1 MW

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

Data center tax exemption in Tennessee

Tennessee qualified data center sales and use tax exemption (Tenn. Code Ann. 67-6-206)

Computers, networks, software, related repair and maintenance, backup power infrastructure and cooling equipment used in a qualified data center are exempt, and electricity is taxed at a reduced 1.5% state rate, where the data center invests more than $100 million and creates at least 15 net new full-time jobs paying at least 150% of the state average occupational wage within a three-year period; no sunset date is stated on the application.

Recent change: September 8, 2026: Rep. Aftyn Behn (D-Nashville) said she will file a bill for the 2027 session to pause new data center exemptions for three years and require annual cost reporting; the state reports 25 active data center exemption certificates. Current law is unchanged.

Source: Tennessee Department of Revenue, 2017-02. General information, not tax advice; ask your tax advisor.

AI data centers being built in Tennessee

CampusDeveloperCountyMWStatusSource
xAI Colossus 1Users: xAI, AnthropicxAI (SpaceX)Shelby County300operatingGrid + on-site powerDCDNov 2024
Meta Gallatin (tent expansion)Users: MetaMetaSumner County-under constructionDCDOct 2025
xAI Colossus 2 (Tulane Road)Users: xAI, Anthropic, GooglexAI (SpaceX)Shelby County-operatingOn-site powerSemiAnalysisSep 2025

How the score works

Six parts out of 100: transmission (25), generation in the queue (20), the state's industrial power price (20), existing and retiring plants (15), sales tax exemption (10) and data center activity (10). The site finder's methodology prints each formula and every source with its date. Markets: Utility territory (no ISO/RTO).