CountyScorePipelinePower price
84650 MW7.2¢/kWh
691.2 GW7.2¢/kWh
69300 MW7.2¢/kWh
68200 MW7.2¢/kWh
67-7.2¢/kWh
66-7.2¢/kWh
63600 MW7.2¢/kWh
63-7.2¢/kWh
63-7.2¢/kWh
62-7.2¢/kWh
6150 MW7.2¢/kWh
6125 MW7.2¢/kWh
60-7.2¢/kWh
59-7.2¢/kWh
58-7.2¢/kWh
58-7.2¢/kWh
57-7.2¢/kWh
5480 MW7.2¢/kWh
53-7.2¢/kWh
52200 MW7.2¢/kWh
51-7.2¢/kWh
50-7.2¢/kWh
47-7.2¢/kWh
45-7.2¢/kWh
45-7.2¢/kWh
44170 MW7.2¢/kWh
44-7.2¢/kWh
42-7.2¢/kWh
41-7.2¢/kWh
40-7.2¢/kWh
40-7.2¢/kWh
39-7.2¢/kWh
38126 MW7.2¢/kWh
36-7.2¢/kWh
33-7.2¢/kWh
33-7.2¢/kWh
33-7.2¢/kWh
33-7.2¢/kWh

Pipeline: active generation and storage requests in the ISO queue, or EIA planned plants where larger (outside the ISOs). Top kV: highest substation voltage. Power price: the state's industrial average. DCs: GPU colocation, mining sites and AI campuses.

What the data shows

The strongest Washington counties for a large AI load are Grant County (84), Benton County (69) and Klickitat County (69) on the site score. Washington sits in utility territory; EIA lists 3.6 GW of planned generators there, and it has 42 substations at 345 kV and up.

Industrial power averaged 7.2¢/kWh (EIA, July 2026 YTD), against 6.8¢/kWh a year earlier, the 8th lowest of the 50 states and DC. Washington has a data center sales and use tax exemption in force. We track 3 AI campuses and 32 GPU-ready colocation facilities here.

Top 6 counties in detail

1. Grant CountyUtility: Bonneville Power Administration

Site score 84 of 100

Transmission
25/25
Generation pipeline
9/20
Industrial power price
19/20
Existing and retiring plants
10/15
Sales tax exemption
10/10
Data center activity
10/10
Market
Utility: Bonneville Power Administration
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
650 MW
Top substation
500 kV
Substations 230 kV+
17
Operating plants
9.1 GW
Retired or retiring
16 MW
Industrial power, WA
7.2¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • GRAND COULEE 230KV · 19 lines500 kV
  • VANTAGE · 12 lines500 kV
  • GRAND COULEE · 12 lines500 kV
  • ROCKY FORD · 7 lines230 kV
  • COLUMBIA · 7 lines230 kV
  • LARSON · 7 lines230 kV
  • Unnamed · 6 lines230 kV
  • SAND DUNES · 6 lines230 kV

Planned, retiring and retired plants

  • Royal Slope · Storage, planned 2027520 MW
  • SR Quincy Valley · Solar, planned 2026130 MW

Data centers, AI campuses and mining sites

  • Microsoft Quincy data center campus · AI campus, operating · Columbia Basin Herald (Source ONE)
  • Sabey Intergate.Quincy campus · AI campus, operating · Trade and Industry Development
  • CyrusOne PNW1 · GPU colocation, Quincy, 36 MW
  • H5 Data Centers Quincy · GPU colocation, Quincy, 40 MW
  • H5 Data Centers Quincy II and III campus · GPU colocation, Quincy
  • Sabey Data Centers SDC Quincy (Intergate.Quincy) · GPU colocation, Quincy, 123 MW
  • Vantage Data Centers WA1 campus (WA11-WA13) · GPU colocation, Quincy, 89 MW

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

2. Benton CountyUtility: Bonneville Power Administration

Site score 69 of 100

Transmission
25/25
Generation pipeline
7/20
Industrial power price
19/20
Existing and retiring plants
7/15
Sales tax exemption
10/10
Data center activity
0/10
Market
Utility: Bonneville Power Administration
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
1.2 GW
Top substation
500 kV
Substations 230 kV+
12
Operating plants
1.3 GW
Retired or retiring
0 MW
Industrial power, WA
7.2¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • ASHE · 9 lines500 kV
  • HANFORD · 6 lines500 kV
  • WAUTOMA · 5 lines500 kV
  • ASHE · 3 lines500 kV
  • MIDWAY · 16 lines230 kV
  • BENTON · 8 lines230 kV
  • WHITE BLUFFS · 6 lines230 kV
  • HORSE HEAVEN · 4 lines230 kV

Planned, retiring and retired plants

  • Hop Hill Solar Generation and BESS · Solar, planned 20311.2 GW

3. Klickitat CountyUtility: Bonneville Power Administration

Site score 69 of 100

Transmission
25/25
Generation pipeline
6/20
Industrial power price
19/20
Existing and retiring plants
9/15
Sales tax exemption
10/10
Data center activity
0/10
Market
Utility: Bonneville Power Administration
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
300 MW
Top substation
500 kV
Substations 230 kV+
17
Operating plants
1.7 GW
Retired or retiring
10 MW
Industrial power, WA
7.2¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • ROCK CREEK · 6 lines500 kV
  • DEADHEAD · 7 lines230 kV
  • THE DALLES · 6 lines230 kV
  • WHITE CREEK · 5 lines230 kV
  • HARVALUM · 3 lines230 kV
  • SPRING CREEK · 3 lines230 kV
  • WILLIS · 3 lines230 kV
  • Unnamed · 3 lines230 kV

Planned, retiring and retired plants

  • Carriger · Solar, planned 2028160 MW
  • Bluebird Solar · Solar, planned 2027140 MW

4. Pierce CountyUtility: Bonneville Power Administration

Site score 68 of 100

Transmission
25/25
Generation pipeline
5/20
Industrial power price
19/20
Existing and retiring plants
7/15
Sales tax exemption
10/10
Data center activity
2/10
Market
Utility: Bonneville Power Administration
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
200 MW
Top substation
500 kV
Substations 230 kV+
10
Operating plants
641 MW
Retired or retiring
64 MW
Industrial power, WA
7.2¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • TACOMA · 11 lines500 kV
  • WHITE RIVER · 15 lines230 kV
  • COWLITZ · 11 lines230 kV
  • SOUTHWEST · 11 lines230 kV
  • SOUTH TACOMA · 10 lines230 kV
  • PEARL · 7 lines230 kV
  • Unnamed · 4 lines230 kV
  • Unnamed · 4 lines230 kV

Planned, retiring and retired plants

  • Greenwater BESS · Storage, planned 2026200 MW
  • WestRock (WA) · Other or not stated, retired 202364 MW

Data centers, AI campuses and mining sites

  • Cogent Tacoma Data Center · GPU colocation, Tacoma
  • Colocation Northwest Tacoma (Perkins Building) · GPU colocation, Tacoma, 0.8 MW

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

5. King CountyUtility: Puget Sound Energy

Site score 67 of 100

Transmission
25/25
Generation pipeline
0/20
Industrial power price
19/20
Existing and retiring plants
3/15
Sales tax exemption
10/10
Data center activity
10/10
Market
Utility: Puget Sound Energy
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
500 kV
Substations 230 kV+
17
Operating plants
167 MW
Retired or retiring
5 MW
Industrial power, WA
7.2¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • TALBOT HILL · 23 lines500 kV
  • COVINGTON · 14 lines500 kV
  • RAVER · 9 lines500 kV
  • ECHO LAKE · 4 lines500 kV
  • Unnamed · 3 lines500 kV
  • OBRIEN · 13 lines230 kV
  • SAMMAMISH · 12 lines230 kV
  • CHRISTOPHER · 9 lines230 kV

Data centers, AI campuses and mining sites

  • Centersquare SEA1 · GPU colocation, Tukwila, 10.8 MW
  • Centersquare SEA2 · GPU colocation, Tukwila, 2.9 MW
  • Colocation Northwest Bellevue · GPU colocation, Bellevue, 1 MW
  • Colocation Northwest Downtown Seattle (Westin Building Exchange) · GPU colocation, Seattle
  • Colocation Northwest Redmond · GPU colocation, Redmond
  • DataBank SEA1 (Downtown Seattle) · GPU colocation, Seattle, 0.21 MW
  • DataBank SEA2 (SeaTac) · GPU colocation, Tukwila, 3 MW
  • Digital Realty SEA10 (Westin Building) · GPU colocation, Seattle
  • EdgeConneX SEA01 · GPU colocation, Tukwila
  • Equinix SE2 · GPU colocation, Seattle
  • Equinix SE3 · GPU colocation, Seattle
  • Equinix SE4 · GPU colocation, Kent
  • Evocative SEA1 (KOMO Plaza) · GPU colocation, Seattle, 4.5 MW
  • H5 Data Centers Seattle · GPU colocation, Seattle
  • Sabey Data Centers SDC Seattle (Intergate.Seattle) · GPU colocation, Tukwila, 54 MW
  • TierPoint Seattle (SEA) · GPU colocation, Seattle
  • Wowrack Tukwila Datacenter · GPU colocation, Tukwila, 3 MW

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

6. Douglas CountyUtility: Bonneville Power Administration

Site score 66 of 100

Transmission
25/25
Generation pipeline
0/20
Industrial power price
19/20
Existing and retiring plants
9/15
Sales tax exemption
10/10
Data center activity
3/10
Market
Utility: Bonneville Power Administration
Queue (active)
0 MW
Agreement signed
0 MW
Planned plants (EIA)
0 MW
Top substation
500 kV
Substations 230 kV+
8
Operating plants
2.5 GW
Retired or retiring
0 MW
Industrial power, WA
7.2¢/kWh
Sales tax exemption
Yes

Substations, 115 kV and up

  • COLUMBIA · 15 lines500 kV
  • CHIEF JOSEPH · 14 lines500 kV
  • GRAND COULEE 500KV · 11 lines500 kV
  • CHIEF JOSEPH · 7 lines500 kV
  • SICKLER · 3 lines500 kV
  • ROCKY REACH · 19 lines345 kV
  • FOSTER CREEK · 4 lines230 kV
  • SAINT ANDREWS · 2 lines230 kV

Data centers, AI campuses and mining sites

  • Salcido Enterprises Eller Data Center (Salcido Plaza Two) · GPU colocation, East Wenatchee
  • Cogent Quincy Edge Data Center · GPU colocation, East Wenatchee
  • Sabey Data Centers SDC Columbia (Intergate.Columbia) · GPU colocation, East Wenatchee, 70 MW

Colocation from our GPU colocation list; mining sites from the miner AI conversion tracker.

Data center tax exemption in Washington

Washington computer data center sales and use tax exemptions: rural counties (RCW 82.08.986 and 82.12.986) and counties over 800,000 people (RCW 82.08.9861 and 82.12.9861)

Server equipment and power infrastructure (not substations), plus installation labor, are exempt for an eligible data center with at least 100,000 sq ft of buildings and 20,000 sq ft of server space that adds family-wage jobs (125% of county per capita income, with health insurance) within six years and meets green building standards. Rural counties: at least 35 jobs, or three per 20,000 sq ft of new server space if fewer; construction must start by July 1, 2035 and no new certificates are issued on or after July 1, 2036. Counties over 800,000 people (King, Pierce, Snohomish): three jobs per 20,000 sq ft, at least 1.5 MW of available power, six approvals a year, and no new certificates on or after July 1, 2028. Electricity is not covered.

Recent change: 2026 ESSB 6231 removed the rural and urban county exemptions for replacement and refurbished data center equipment effective July 1, 2026; new equipment at new data centers remains exempt.

Source: Washington State Legislature, accessed 2026-10-17. General information, not tax advice; ask your tax advisor.

AI data centers being built in Washington

CampusDeveloperCountyMWStatusSource
Microsoft Malaga data center campusMicrosoftChelan County-under constructionKPQJun 15, 2023
Microsoft Quincy data center campusMicrosoftGrant County-operatingColumbia Basin Herald (Source ONE)Jan 13, 2026
Sabey Intergate.Quincy campusSabey Data CentersGrant County-operatingTrade and Industry DevelopmentJun 16, 2023

How the score works

Six parts out of 100: transmission (25), generation in the queue (20), the state's industrial power price (20), existing and retiring plants (15), sales tax exemption (10) and data center activity (10). The site finder's methodology prints each formula and every source with its date. Markets: Utility territory (no ISO/RTO).