Behind-the-meter power

Behind-the-meter power is electricity generated on or next to the site and used there without passing through the utility’s meter or the public grid, for example on-site gas turbines or a data center beside a power plant.

Public examples

xAI Colossus, MemphisGas turbines bridged grid power from September 2024
Homer City, PennsylvaniaFormer coal plant; up to 4.5 GW of on-site gas planned
Fermi Project Matador, Texas11 GW campus planned: gas, solar, wind, storage, nuclear

As described in natural gas for data centers.

How it works

Generate where you compute. Mobile turbines and reciprocating engines can be on site in months, though new large gas turbines now take years to deliver; either way on-site generation skips the interconnection queue, so an operator with a signed customer and a site but no grid connection starts earning sooner (natural gas for data centers).

Islanding goes further: on-site generation is the primary supply and the grid only a backup. It gives full control over power but needs enough generation for the whole load plus spare capacity.

Regulators watch it. Turbines need air quality permits that usually cap annual operating hours, and in November 2024 FERC rejected an expansion of the Amazon campus’s co-located load at Talen Energy’s Susquehanna nuclear plant from 300 MW to 480 MW; the parties later restructured the deal as a front-of-meter supply contract.

What lenders check

It moves the power date forward but adds a fuel, permit and equipment risk the grid would carry. Lenders check the permits and their hour limits, the gas supply contract and the redundancy behind the cluster.

Collateral at a behind-the-meter site has fewer buyers in place: if the site fails, the GPUs come out and sell ex-situ.