Modular Data Centers
Who builds modular AI data centers, and what a site costs per MW.
What it covers
A modular data center is built from factory-made units, ISO containers, power skids or prefab halls, that are tested off site, trucked in and connected on a pad. Operators use them to put GPUs wherever power is available, a megawatt or two at a time.
Modular data center companies
| Company | Headquarters | Product | Stated capacity | Liquid cooling | Source |
|---|---|---|---|---|---|
| ABBManufacturer | Switzerland | eHouse | Rated up to 40.5 kV | - | ABB |
| ArmadaManufacturer | United States | Galleon | Leviathan: megawatt-scale per unit | - | Armada |
| BMarko StructuresManufacturer | United States | Steel modular structures and containerized enclosures | - | - | DCD |
| Cadolto DatacenterManufacturer | Germany | Modular edge data center (with Siemens and Legrand) | - | - | Siemens |
| Compass DatacentersDeveloper-operator | United States | Prefabricated white space module (with Schneider Electric) | - | Rear-door heat exchanger, Direct-to-chip | Schneider Electric |
| Compu Dynamics ModularManufacturer | United States | 750 kW All-In-One Module | 750 kW to 5 MW per module; 50+ MW campuses | Direct-to-chip, Rear-door heat exchanger, Immersion | Compu Dynamics Modular |
| CrusoeDeveloper-operator | United States | Crusoe Spark | - | - | Crusoe |
| DatapodManufacturer | Australia | Datapod System / AI Factory units | 200 kW+ per rack (as stated on datapod.ai) | - | Datapod |
| Delta ElectronicsManufacturer | Taiwan | AI Containerized Data Center | Up to 60 kW per rack (containerized solutions, per Delta materials) | Direct-to-chip | Delta Electronics via Nasdaq |
| DUG TechnologyLiquid cooling specialist | Australia | DUG Nomad (10, 20, 40 ft) | Up to 1 MW (Nomad 40) | Immersion | DCD |
| Duos Edge AIDeveloper-operator | United States | Edge Data Center (EDC) pod | 15 cabinets per pod | - | Data Center Frontier |
| DXNManufacturer | Australia | AI HPC modular data centre | 1.36 MW to 2 MW per announced deployment | - | Small Caps |
| EatonManufacturer | Ireland | Fibrebond pre-integrated modular power enclosures | 3.5 to 35 MW data halls (Flexnode collaboration) | - | Business Wire |
| EdgeCloudLinkDeveloper-operator | United States | Hydrogen-powered modular data center (MV1) | - | Rear-door heat exchanger | SDxCentral |
| FirmusDeveloper-operator | Australia | AI Factory platform | Project Southgate: 36,000 NVIDIA GPUs over two stages; Stage 1 90 MW (starting with 44 MW), planned second stage 300 MW | Direct-to-chip | Firmus |
| FlexManufacturer | - | Prefabricated power, cooling and IT systems (AI data center platform) | 5 to 10 MW blocks | Direct-to-chip | Power Electronics News |
| FlexnodeManufacturer | United States | NX units (NX-1 to NX-4) | 1 to 18 MW per NX unit | - | Flexnode |
| Giga EnergyMining container maker | United States | GigaBase | Giga Box Air: 600 kW to 1,430 kW | Air | Giga Energy |
| GIGABYTEIntegrator | Taiwan | GADU (GIGABYTE Accelerated Deployment Unit) | - | Direct-to-chip, Immersion | GIGABYTE |
| GRC (Green Revolution Cooling)Liquid cooling specialist | United States | ICEtank | 200 kW (20 ft) to 400 kW (40 ft) per container, 2018 datasheet | Immersion | GRC |
| Hewlett Packard EnterpriseManufacturer | United States | AI Mod POD | 0.8 MW (DC8) or 1.6 MW (DC16) per container; up to 5 MW per data hall | Direct-to-chip | ITPro |
| Huawei Digital PowerManufacturer | China | FusionModule2000/5000 Smart Modular Data Center | 1.74 MW to 7.15 MW (prefabricated AI data center reference design) | Direct-to-chip | Huawei |
| LiquidStackLiquid cooling specialist | United States | MicroModular / MegaModular | 250 kW to 1.5 MW | Immersion, Direct-to-chip | SDxCentral |
| Nautilus Data TechnologiesLiquid cooling specialist | United States | EcoCore | 2.5 MW (EcoCore modular design) | Direct-to-chip | Baxtel |
| PCXManufacturer | United States | Modular skids | - | - | PCX |
| RittalManufacturer | Germany | RiMatrix Data Center Containers | Up to 400 kW per container module | Air | Rittal |
| Schneider ElectricManufacturer | France | Prefabricated Modular EcoStruxure Pod Data Center | EcoStruxure Pod: up to 1 MW and beyond per pod | Direct-to-chip, Rear-door heat exchanger | Schneider Electric |
| SiemensManufacturer | - | Custom power distribution modules (skids, E-House) | - | - | Siemens |
| Soluna HoldingsDeveloper-operator | United States | Modular data center buildings (Project Dorothy, Sophie, Kati) | Dorothy 1A/1B and Sophie: 25 MW each (2023 figures) | - | Soluna |
| Sonic EdgeManufacturer | United Kingdom | Iceotope AI Pods (with Iceotope) | Up to 450 kW per pod | Immersion | Iceotope |
| STULZManufacturer | Germany | STULZ Micro DC | Air: 4 to 20 kW per rack; liquid: up to 100 kW in a single rack | Direct-to-chip | STULZ |
| SubmerLiquid cooling specialist | Spain | SmartPod / SmartPod EXO | - | Immersion | submer.com |
| VertivManufacturer | United States | MegaMod HDX | MegaMod HDX: up to 1.25 MW (Compact) or up to 10 MW (Combo) per configuration | Direct-to-chip | Vertiv |
| Zella DCManufacturer | Australia | Zella Stack | Up to 124 kW cooling per stack | Direct-to-chip | StorageReview |
| ZTEManufacturer | China | AIDC Prefabricated Container Solution | Up to 40 kW per liquid-cooled rack | Direct-to-chip | DCD |
What a modular site costs
The module is the small part of the bill. DXN signed A$12.2 million for a 2 MW turnkey modular AI hall in August 2026, about US$4.4 million per MW, on a site with existing infrastructure (ITBrief). A megawatt of B300 servers and networking costs about $39 million. Compare owning a site with colocation in the cost calculator.
Electrical gear sets the schedule. Pad-mounted transformers take 68 to 113 weeks to arrive, generators 60 to 100 weeks and medium-voltage switchgear 38 to 63 weeks (CRE Daily). Modular sites go where power is already connected.
What lenders check
Equipment or fixture. A module bolted to a pad and wired into site power can become a fixture. Under UCC 9-334, a lien on fixtures generally loses to the landowner's mortgage lender unless the lender makes a fixture filing first or the landowner consents or disclaims. Lenders get the landowner's waiver before funding.
Site and power rights. The ground lease and the power contract must outlast the loan, with time and access to remove the modules after a default.
Rack density. The module's per-rack rating has to fit the GPUs the customer contract names. An NVL72 rack draws well over 100 kW and needs direct-to-chip liquid cooling.