Data Center Site Assessment

Whether the site can keep GPU collateral running for the term of the loan.

What it covers

Many sites lack what GPU customer contracts require, especially retrofitted crypto mines and modular builds, and a site that misses its uptime can force a liquidation. A site assessment checks that the building can keep the equipment running for the term of the loan.

Power density is the first filter. GPU racks draw 40-80 kW while most data centers run 10-30 kW, and the Uptime Institute found in 2025 that 67% of existing sites cannot support modern GPU densities. Past roughly 40 kW per rack, air cooling stops working.

By topic

ChecklistWhat it covers
GPU data center site evaluationWhat an AI data center needs to host GPUs for a loan's term: power per rack, cooling, redundancy, energization dates and recovery access, for lenders.
B300 and GB300 power and coolingB300 vs GB300 NVL72 power per server and rack, air vs liquid cooling, and how many fit a 15, 30, 40 or 80 kW rack. From NVIDIA and OEM specifications.
Modular data center site evaluationHow lenders evaluate a modular or containerized GPU data center: power source, cooling, redundancy, physical security, insurance and recovery access.
Bitcoin mine conversion site evaluationWhat lenders check when a bitcoin mine converts to GPUs: firm power vs curtailment, redundancy, liquid cooling, floors, fiber, energization and access.

Where GPU Deals Break

The 52-slide deck: where GPU loans and leases break, from the order to the site to the lease, one diagram per risk.

Book a call

Send us the equipment list and the loan or lease you have in mind. We will come back with a proposed scope and the questions we would need answered.

San Francisco1160 Battery Street EastSuite 100San Francisco, CA 94111
New York430 Park AvenueNew York, NY 10022

Prefer email? hello@amcompute.com