Owning a GB300 NVL72 rack
72 Blackwell Ultra GPUs and 36 Grace CPUs in one liquid-cooled rack. Here’s what owning one takes, and when HGX B300 servers make more sense.
GB300 NVL72 at a glance
- GPUs
- 72x NVIDIA B300 (Blackwell Ultra) linked as one system
- CPUs
- 36x NVIDIA Grace
- GPU memory
- About 21 TB per rack
- Cooling
- Liquid only
- Power
- About 130-140 kW per rack
- Ballpark price
- $8-8.6M per rack, with networking and installation
Is a rack right for you?
It fits the largest models, where 72 GPUs need to work as one. For most inference, HGX B300 servers use the same GPU, run air-cooled, and can be bought one at a time.
Vera Rubin, NVIDIA’s next generation, comes as racks and as 8-GPU servers. Early supply goes to the largest buyers. Tell us if you want to be in line.
What it takes to own one
A liquid-cooled site
Few data centers can cool racks this dense, and their space goes fast.
Power and floor
About 130-140 kW per rack, and a floor that can hold it.
Lead time
Orders placed now arrive in about six months.
Compliance
Expect a thorough review of the buyer, the site, and the use.
We manage. You own.
Scope it
Tell us your budget, timeline, and power. You get a plan and ballpark costs.
One call
We procure it
No preferred vendors. We source servers, networking, and data center space at today’s best price, in your name.
60-90 days typically
We run it
Operations and maintenance (O&M), software, and customers, on an annual contract.
Ongoing
What it costs
Flat fees, not revenue-share.
Paid to vendors, in your name
Hardware
Servers, networking, shipping, and installation, with nothing added.
Colocation
Space, power, and cooling, usually on a 3-year contract.
Parts, bandwidth, and insurance
Spare parts, internet, and property insurance on the hardware.
Paid to us, flat
Setup fee
A flat $25K for 1-7 servers, quoted for 8 or more.
Management fee
From $1K a month per 4 servers.
Want a customer for the GPUs? We charge a small percentage of the contract, only if it signs.
Tell us what you’re planning.
- A call with our CTO about what you need
- Ballpark costs and timelines for your budget
- A straight answer if it’s not a fit
Prefer email? hello@amcompute.com
NVIDIA GB300 NVL72 racks: questions
- How much does a GB300 NVL72 rack cost?
- Ballpark $8-8.6M per rack, including networking and installation. The data center comes on top.
- Can it be air-cooled?
- No. It needs liquid cooling and a data center built for it.
- How long until delivery?
- Orders placed now arrive in about six months. The largest buyers are served first.
- GB300 NVL72 or HGX B300?
- Same GPU. The NVL72 links 72 of them for the largest workloads. HGX B300 links eight per server and fits far more data centers.
Further reading
More hardware and hosting
- NVIDIA B300 serversBallpark pricing, power, and lead times for HGX B300 servers.
- NVIDIA B200 serversBallpark pricing, power, and availability for HGX B200 servers.
- NVIDIA H200 serversBallpark pricing and availability for HGX H200 servers.
- NVIDIA RTX PRO 6000 serversBallpark pricing and power for RTX PRO 6000 servers, the lower-cost way in.
- GPU colocationA U.S. data center for the GPU servers you own.
- GPU colocation directoryHigh-density and liquid-cooled data centers by metro: power, kW per rack and liquid cooling, each with a source.
- GPU server vendorsWho sells GPU servers worldwide, from the public partner lists of NVIDIA, Supermicro, Dell, HPE, Lenovo, Cisco, Gigabyte, ASUS and AMD, with server models by maker.
Who it’s for
- AI startupsOwn your GPU servers instead of renting cloud GPUs.
- Universities and research labsA private GPU cluster in your institution’s name, run for you.
- Companies and enterprisesRun AI models on GPU servers your company owns, hosted and run for you.
- Family offices and fundsOwn GPU servers in your own entity and rent them to AI companies.
- Individual investorsOwn one or a few GPU servers through your LLC, rented out and run for you.